Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Space transportation system payload safety policy

A brief description of the Space Transportation System (STS) is given, and the evolution of a payload safety policy for it is described. The policy adopted in June, 1976, minimizes STS involvement in the payload design process while maintaining the assurance of a safe operation. The payload developer is responsible for assurance of safety and verification of compliance with the requirements. The STS will exercise reviews to ensure that interaction between payloads does not create hazards.

Scheller, J. A.↗

Space Transportation systems overview

Planning for the operations phase of the Space Transportation system is reviewed. Attention is given to mission profile (typical), applications, manifesting rationale, the Operational Flight Test manifest, the operations manifest, pricing policy, and potential applications of the STS.

Lee, C. M.↗

Technology development of the Space Transportation System mission and terrestrial applications of satellite technology

The Space Transportation System (STS) is discussed, including the launch processing system, the thermal protection subsystem, meteorological research, sound supression water system, rotating service structure, improved hypergol or removal systems, fiber optics research, precision positioning, remote controlled solid rocket booster nozzle plugs, ground operations for Centaur orbital transfer vehicle, parachute drying, STS hazardous waste disposal and recycle, toxic waste technology and control concepts, fast analytical densitometry study, shuttle inventory management system, operational intercommunications system improvement, and protective garment ensemble. Terrestrial applications are also covered, including LANDSAT applications to water resources, satellite freeze forecast system, application of ground penetrating radar to soil survey, turtle tracking, evaluating computer drawn ground cover maps, sparkless load pulsar, and coupling a microcomputer and computing integrator with a gas chromatograph.

Source record↗

National Space Transportation Systems Program mission report

The STS 41-C National Space Transportation Systems Program Mission Report contains a summary of the major activities and accomplishments of the eleventh Shuttle flight and fifth flight of the OV-099 vehicle, Challenger. Also summarized are the significant problems that occurred during STS 41-C, and a problem tracking list that is a complete list of all problems that occurred during the flight. The major objectives of flight STS 41-C were to successfully deploy the LDEF (long duration exposure facility) and retrieve, repair and redeploy the SMM (Solar Maximum Mission) spacecraft, and perform functions of IMAX and Cinema 360 cameras.

Collins, M. A., Jr.↗

The Space Transportation System

The accomplishments and present budget concerns of the Space Transportation System (STS) program are discussed. The Shuttle, with the most advanced operational engine in the world and the largest rocket motor and external tank ever developed, is shown to be a successful, state-of-the-art achievement with enormous capabilities for future exploitation. The readjusted price of $71M (1982$) for a dedicated mission for the period FY 86-FY 88 is nearly twice the price estimated at the beginning of the 12-year program. Additional flights above the sixteen plus missions necessary for the U.S. government's NASA and DOD National Security payloads, are offered to U.S. and foreign, commercial and civil customers, to help recover the marginal costs of anticipated future payloads. Aspects of the present bid scheme, with a $74.0M (82$) minimum bid commencing with FY 1989, are discussed.

Lee, C. M.↗

Characterization of the Ignition Over-Pressure/Sound Suppression Water in the Space Launch System Mobile Launcher Using Volume of Fluid Modeling

The Space Launch System (SLS) Vehicle consists of a Core Stage with four RS-25 engines and two Solid Rocket Boosters (SRBs). This vehicle is launched from the Launchpad using a Mobile Launcher (ML) which supports the SLS vehicle until its liftoff from the ML under its own power. The combination of the four RS-25 engines and two SRBs generate a significant Ignition Over-Pressure (IOP) and Acoustic Sound environment. One of the mitigations of these environments is the Ignition Over-Pressure/Sound Suppression (IOP/SS) subsystem installed on the ML. This system consists of six water nozzles located parallel to and 24 inches downstream of each SRB nozzle exit plane as well as 16 water nozzles located parallel to and 53 inches downstream of the RS-25 nozzle exit plane. During launch of the SLS vehicle, water is ejected through each water nozzle to reduce the intensity of the transient pressure environment imposed upon the SLS vehicle. While required for the mitigation of the transient pressure environment on the SLS vehicle, the IOP/SS subsystem interacts (possibly adversely) with other systems located on the Launch Pad. One of the other systems that the IOP/SS water is anticipated to interact with is the Hydrogen Burn-Off Igniter System (HBOI). The HBOI system's purpose is to ignite the unburned hydrogen/air mixture that develops in and around the nozzle of the RS-25 engines during engine start. Due to the close proximity of the water system to the HBOI system, the presence of the IOP/SS may degrade the effectiveness of the HBOI system. Another system that the IOP/SS water may interact with adversely is the RS-25 engine nozzles and the SRB nozzles. The adverse interaction anticipated is the wetting, to a significant degree, of the RS-25 nozzles resulting in substantial weight of ice forming and water present to a significant degree upstream of the SRB nozzle exit plane inside the nozzle itself, posing significant additional blockage of the effluent that exits the nozzle upon motor start leading to detrimental effects. The purpose of the CFD simulations were to i) characterize the location of the IOP/SS water after it is ejected from the IOP/SS nozzles, ii) characterize the interaction of the IOP/SS system with the HBOI system and iii) characterize the interaction of the IOP/SS water with the RS-25 nozzles and the SRB nozzles.

West, Jeff↗

Post-Flight Reconstruction Approach for Space Launch System Artemis I Mission

Upon completion of the first Space Launch System flight, NASA personnel will begin post-flight analyses. Telemetry from across the vehicle will be combined with external radar tracking and environmental observation data in order to close validation criteria and generate a best estimated trajectory (BET). This paper will describe the approach taken by the SLS team to integrate flight data from multiple flights sources into BET, pre-flight simulation and testing results, primary sources of uncertainty, and path towards processing flight results. This paper also includes a brief description of algorithms and approaches to estimate as-flown vehicle parameters such as booster specific impulse, booster (and core) thrust multipliers and dry mass.

Evan John Anzalone↗

A Computational Study of Plume Modeling For Space Launch System Abort Scenarios

This extended abstract details work on Space Launch System (SLS) core stage drag during abort scenarios that is currently being conducted. In the final paper, viscous computational fluid dynamic simulations will be used to study the axial force coefficient on the SLS core stage as a function of its distance to the upstream crew module and launch abort system, the freestream conditions, and the chemical model used to represent the launch abort system abort motor and attitude control motor plumes. In addition, the computational expense of each method will be studied in order to help determine the appropriate trade-off between fidelity and simulation turn around time.

CFD↗

Space Launch System Day of Launch Loads for Artemis I

NASA’s Space Launch System (SLS) was successfully launched on November 16, 2022. During the years leading up to the first flight, Artemis I, a DOLILU (Day of Launch I-Load Update) process was developed to design, verify, and upload the first stage flight trajectory on day-of-launch to ensure a safe flight. The evaluation of integrated vehicle loads is a key component of the DOLILU process. The SLS Artemis I DOL loads project has involved methodology development, software development, software testing and certification, operator training, and simulation and launch support. The resulting DOL process successfully calculated loads for all launch opportunities within the window, with the robust nature of the process contributing to all opportunities being go for loads.

SLS↗

Force and Moment Analysis for the High Reynolds Number Wind Tunnel Test of the Space Launch System at Ascent Conditions

A high Reynolds number test of the Space Launch System was performed at the NASA Langley National Transonic Facility (NTF). The objective of the test was to use the cryogenic testing capabilities of the NTF to acquire data over the largest range of Reynolds numbers possible with a specific focus on the Reynolds numbers closest to flight conditions. The test was performed at Mach numbers from 0.50 to 0.95 which corresponds to the ascent portion of flight for the SLS vehicle. Force and moment data showed that pitching and yawing moment were sensitive to Reynolds number effects over the full range of Mach and Reynolds numbers tested. Axial force also showed sensitivity to Reynolds number with the largest differences seen between Mach 0.50 to 0.90. Surface pressure data showed the highest sensitivity to Reynolds number in the vicinity of the solid rocket booster forward attach region.

Space Launch System↗

Force and Moment Analysis for the High Reynolds Number Wind Tunnel Test of the Space Launch System at Ascent Conditions

A high Reynolds number test of the Space Launch System was performed at the NASA Langley National Transonic Facility (NTF). The objective of the test was to use the cryogenic testing capabilities of the NTF to acquire data over the largest range of Reynolds numbers possible with a specific focus on the Reynolds numbers closest to flight conditions. The test was performed at Mach numbers from 0.50 to 0.95, which corresponds to the ascent portion of flight for the SLS vehicle. Force and moment data showed that pitching and yawing moment were sensitive to Reynolds number effects over the full range of Mach and Reynolds numbers tested. Axial force also showed sensitivity to Reynolds number with the largest differences seen between Mach 0.50 to 0.90. Surface pressure data showed the highest sensitivity to Reynolds number in the vicinity of the solid rocket booster forward attach region.

Space Launch System↗

Large space-based systems for dealing with global environment change

Increased concern over the effects of global climate change and depletion of the ozone layer has resulted in support for the Global Change Research Program and the Mission to Planet Earth. Research to understand Earth system processes is critical, but it falls short of providing ways of mitigating the effects of change. Geoengineering options and alternatives to interactively manage change need to be developed. Space-based concepts for dealing with changes to the environment should be considered in addition to Earth-based actions. 'Mission for Planet Earth' describes those space-based geoengineering solutions that may combine with an international global change program to stabilize the Global environment. Large space systems that may be needed for this response challenge guidance and control engineering and technology. Definition, analysis, demonstration, and preparation of geoengineering technology will provide a basis for policy response if global change consequences are severe.

Jenkins, Lyle M.↗

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗

Requirements for particulate monitoring system for Space Station

We recommend that a stereo camera system be utilized as a diagnostic for the particulate environment surrounding the Space Station. This system should have sufficient sensitivity to identify contaminated periods, to isolate the effects of sources and activities and to determine optical clearing times. A reasonable compromise between sensitivity and other operational constraints is recommended. Sensitivity comparable to the film camera systems should suffice, but long periods of unattended operation and remotely controlled exposure sequences are essential requirements.

Green, Byron David↗

Friction Stir Weld Tooling Development for Application on the 2195 Al-Cu-Li Space Transportation System External Tank

Friction Stir Welding (FSW) is a new and innovative solid-state joining process which can be applied to difficult-to- weld aluminum alloys. However, the large forces involved with the process have posed a production tooling challenge. Lockheed Martin Michoud Space Systems has overcome many of these challenges on the Super Lightweight External Tank (ET) program. Utilizing Aluminum-Copper-Lithium alloy 2195 in the form of plate and extrusions, investigations of FSW process parameters have been completed. Major loading mechanisms are discussed in conjunction with deflection measurements. Since the ET program is a cryogenic application, a brief comparison of cryogenic material properties with room temperature material properties is offered for both FSW and fusion welds. Finally, a new approach to controlling the FSW process from a load perspective is introduced. Emphasis will be put on tooling development, as well as the impact of tooling design and philosophy on Friction Stir Weld success probability.

Loftus, Zachary↗

A vehicle health monitoring system for the Space Shuttle Reaction Control System during reentry

A general two tier framework for vehicle health monitoring of Guidance Navigation and Control (GN&C) system actuators, effectors, and propulsion devices is presented. In this context, a top level monitor that estimates jet thrust is designed for the Space Shuttle Reaction Control System (RCS) during the reentry phase of flight. Issues of importance for the use of estimation technologies in vehicle health monitoring are investigated and quantified for the Shuttle RCS demonstration application. These issues include rate of convergence, robustness to unmodeled dynamics, sensor quality, sensor data rates, and information recording objectives. Closed loop simulations indicate that a Kalman filter design is sensitive to modeling error and robust estimators may reduce this sensitivity. Jet plume interaction with the aerodynamic flowfield is shown to be a significant effect adversely impacting the ability to accurately estimate thrust.

Rosello, Anthony David↗

The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

Hornstein, Rhoda S.↗