Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space networking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Measurement of the power spectral density of phase of the hydrogen maser

Hydrogen masers are being developed for the Deep Space Network as improved frequency standards, in order to achieve better timing accuracies, reduced Doppler residuals, and lower phase noise in the tracking system. Performance data for the masers are given in two forms: time domain performance, useful for analyzing time keeping systems and Doppler systems; and frequency domain performance, useful for analyzing tracking systems. Particular attention is given to frequency domain performance, as obtained from both time domain measurements and direct measurements.

Sward, A.↗

Precision signal power measurement

Accurate estimation of signal power is an important Deep Space Network (DSN) consideration. Ultimately, spacecraft power and weight is saved if no reserve transmitter power is needed to compensate for inaccurate measurements. Spectral measurement of the received signal has proved to be an effective method of estimating signal power over a wide dynamic range. Furthermore, on-line spectral measurements provide an important diagnostic tool for examining spacecraft anomalies. Prototype equipment installed at a 64-m-diameter antenna site has been successfully used to make measurements of carrier power and sideband symmetry of telemetry signals received from the Mariner Mars 1971 spacecraft.

Winkelstein, R.↗

Probes for measuring noise current in an electronic cable

Electromagnetic interference in deep-space network receiver is often caused by stray coupling from power lines. These stray signals create potential differences between ground terminals, which leads to excessive noise in receiver circuits. Pair of probes detect and measure noise currents in conductors.

Lundy, C. C.↗

Tracking and data system support for the Mariner Mars 1971 mission. Volume 3: Orbit insertion through end of primary mission

The Tracking and Data System (TDS) Support for the Mariner Mars 1971 Mission final report contains the deep space tracking and data acquisition activities in support of orbital operations. During this period a major NASA objective was accomplished: completion of the 180th revolution and 90th day of data gathering with the spacecraft about the planet Mars. Included are presentations of the TDS flight support pass chronology data for each of the Deep Space Stations used, and performance evaluation for the Deep Space Network Telemetry, Tracking, Command, and Monitor Systems. With the loss of Mariner 8 at launch, Mariner 9 assumed the mission plan of Mariner 8, which included the TV mapping cycles and a 12-hr orbital period. The mission plan was modified as a result of a severe dust storm on the surface of Mars, which delayed the start of the TV mapping cycles. Thus, the end of primary mission date was extended to complete the TV mapping cycles.

Barnum, P. W.↗

Determination of normal points for the relativity test of the celestial mechanics experiment

The relativity test is based on Mariner 9 tracking data acquired by the Deep Space Network. These data consist of two types of measurements: (1) two-way frequency difference (Doppler) measurements that are proportional to the tracking station-spacecraft range rate, and (2) signal round trip time-delay measurements that are proportional to the station-spacecraft range. A data compression scheme has been employed to alleviate accuracy and cost difficulties by (1) using the Doppler data to solve for the spacecraft orbit and to relate spacecraft position to the center of mass of Mars; and (2) combining this result with the station-spacecraft range measurements to obtain measurements of the Earth-Mars distance, called normal points, that contain all of the information pertinent to a detailed knowledge of the Earth-Mars motion.

Jordan, J. F.↗

System design of the Pioneer Venus spacecraft. Volume 8: Command/data handling subsystems studies

Study tasks for the command and data handling subsystems have been directed to: (1) determining ground data systems, (GDS) interfaces and deep space network (DSN) changes, if required, (2) defining subsystem requirements, (3) surveying existing hardware that could be used or modified to meet subsystem requirements, and (4) establishing a baseline design. Study of the existing GDS led to the conclusion that the Viking configuration GDS can be used with only minor changes required for the Pioneer Venus baseline. Those changes required are associated with providing a predetection recording capability used during probe entry and descent. Subsystem requirements were first formulated with sufficient latitude so that surveys of existing hardware could lead to low cost hardware which, in turn, could modify more narrowly defined subsystem requirements.

Vesely, D. D.↗

Introduction

A description is given of the navigation of Mariner 9, which included not only precision flight path control but also pointing of the scientific instruments mounted on a two-degree of freedom scan platform. Flight path control involved the determination of the spacecraft trajectory and the design and execution of the propulsive maneuvers required to effect the necessary changes in the trajectory. Radiometric tracking data provided by the Deep Space Network (DSN) were the principal data type used in the orbit determination process. During the Mars approach phase, optical tracking data were also used, but only on an experimental basis.

Oneil, W. J.↗

Satellite orbit determination

A historic account of the activities of the Satellite OD Group during the MM'71 mission is given along with an assessment of the accuracy of the determined orbit of the Mariner 9 spacecraft. Preflight study results are reviewed, and the major error sources described. Tracking and data fitting strategy actually used in the real time operations is itemized, and Deep Space Network data available for orbit fitting during the mission and the auxiliary information used by the navigation team are described. A detailed orbit fitting history of the first four revolutions of the satellite orbit of Mariner 9 is presented, with emphasis on the convergence problems and the delivered solution for the first orbit trim maneuver. Also included are a solution accuracy summary, the history of the spacecraft orbit osculating elements, the results of verifying the radio solutions with TV imaging data, and a summary of the normal points generated for the relativity experiment.

Jordan, J. F.↗

The NASA/JPL 64-meter-diameter antenna at Goldstone, California: Project report, technical staff, tracking and data acquisition organization

The significant management and technical aspects of the JPL Project to develop and implement a 64-meter-diameter antenna at the Goldstone Deep Space Communications Complex in California, which was the first of the Advanced Antenna Systems of the National Aeronautics and Space Administration/Jet Propulsion Laboratory Deep Space Network are described. The original need foreseen for a large-diameter antenna to accomplish communication and tracking support of NASA's solar system exploration program is reviewed, and the translation of those needs into the technical specification of an appropriate ground station antenna is described. The antenna project is delineated by phases to show the key technical and managerial skills and the technical facility resources involved. There is a brief engineering description of the antenna and its closely related facilities. Some difficult and interesting engineering problems, then at the state-of-the-art level, which were met in the accomplishment of the Project, are described. The key performance characteristics of the antenna, in relation to the original specifications and the methods of their determination, are stated.

Source record↗

Preliminary estimates of range measurements to a spacecraft by means of ground digitally controlled oscillators

Range measurements to the Pioneer 10 and Mariner 10 spacecraft were made, without the use of a ranging system per se, by using the Jet Propulsion Laboratory Deep Space Network's new digitally controlled oscillator (DCO) device. These measurements were accomplished by controlling the linear ramps of the transmitted carrier frequency with a recently installed DCO instrument at the Goldstone facility and analyzing the received linearly ramped Doppler data with a computer program. The accuracy of these range measurements is on the order of 1.5 km.

Liu, A.↗

Time frequency requirements for radio interferometric earth physics

Two systems of VLBI (Very Long Baseline Interferometry) are now applicable to earth physics: an intercontinental baseline system using antennas of the NASA Deep Space Network, now observing at one-month intervals to determine UTI for spacecraft navigation; and a shorter baseline system called ARIES (Astronomical Radio Interferometric Earth Surveying), to be used to measure crustal movement in California for earthquake hazards estimation. On the basis of experience with the existing DSN system, a careful study has been made to estimate the time and frequency requirements of both the improved intercontinental system and of ARIES. Requirements for the two systems are compared and contrasted.

Thomas, J. B.↗

Publications of the Jet Propulsion Laboratory, January through December 1974

Formalized technical reporting is described and indexed, which resulted from scientific and engineering work performed, or managed, by the Jet Propulsion Laboratory. The five classes of publications included are technical reports, technical memorandums, articles from the bimonthly Deep Space Network Progress Report, special publications, and articles published in the open literature. The publications are indexed by author, subject, and publication type and number.

Source record↗

Viking Mars encounter

Various phases of planetary operations related to the Viking mission to Mars are described. Topics discussed include: approach phase, Mars orbit insertion, prelanding orbital activities, separation, descent and landing, surface operations, surface sampling and operations starting, orbiter science and radio science, Viking 2, Deep Space Network and data handling.

Source record↗

Pioneer 10 and 11 mission support

Possible improvements in the Deep Space Network and their potential effect on the telecommunications limit of Pioneer 10 and on Pioneer 11 Saturn encounter are discussed.

Miller, R. B.↗

ALSEP: Quasar differential VLBI

A program of Apollo Lunar Surface Experiments Package (ALSEP)-Quasar Very Long Baseline Interferometry (VLBI) is being reported. These observations primarily employ a 4 antenna technique, whereby simultaneous observations with two antennas at each end of an intercontinental baseline are used to derive the differential interferometric phase between a compact extragalactic radio source (usually a quasar) and a number of ALSEP transmitters on the lunar surface. A continous ALSEP-quasar differential phase history over a few hour period leads to extremely high angular accuracy in measuring the lunar position against the quasar reference frame. This application of the 4 antenna technique has been underway for more than a year and is now producing high quality data utilizing Deep Space Network (DSN) stations in Australia, Spain, and Goldstone, California, as well as the Spaceflight Tracking and Data Network (STDN) Apollo station at Goldstone.

Slade, M. A.↗

Simulation and modeling of the deep space receiver interaction with channel decoding performance

Computer models were developed in an attempt to reproduce the sequential decoder computation curve of Deep Space Network (DSN) ground station receivers, by simulation of the binary data output of the Gaussian channel with the carrier phaselock loop and the subcarrier demodulator assembly. Simulations were run at bit rates equal to the powers of 2 from 8 to 2,048, and agreement with DSN data was generally good above 32 bits per second. Simulation results at data rates of 8, 16, and 32 bits per second did not closely match experimental data. This simulation provides a more accurate prediction of DSN computation lengths than either current mathematical models or simulations without both the subcarrier demodulator and carrier loop.

Jones, H. W., Jr.↗

Viking X-band telemetry experiment

In order to uncover operational and design problems in the use of X-band by the 1977 Mariner Jupiter-Saturn mission and future spacecraft using the Deep Space Network, the Viking X-band telemetry experiment was conducted. The experiment was conducted during the months of December 1975 and January 1976. During each of the five successful passes, a periodic sequence (in lieu of ranging) was transmitted to the spacecraft and returned by the spacecraft transponder on both S- and X-bands. These telemetry-like signals were received, demodulated, and detected. From a variety of measurements at the station, four independent measurements were made of the received signal-to-noise ratio (SNR). These four SNRs were later compared with each other and the predicted SNR. The principal result of the experiment is that X-band telemetry works as expected. That is, the measured SNRs were consistent relative to each other and to the predicted values within the accuracy of the experiment.

Weber, W. J., III↗