Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “presentation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

2011 MARS Refresher Presentation (2 of 3)

Information sessions that shall outline the general principles of the 2011 annual Merit, Appraisal and Recognition Scheme (MARS). Presentation will be given in English.

FEEDBACK↗

2010 MARS Refresher Presentation (3 of 3)

Information sessions that shall outline the general principles of the 2010 annual Merit, Appraisal and Recognition Scheme (MARS). Presentation will be given in English.

ADVANCEMENTS↗

HR Presentation - New Contract Policy

Presentation on CERN's contract policy as of 2009. Topics covered include: staff member survey, work environment, career development, financial and social benefits, HR department activities and policy analysis.

99 GENERAL AND MISCELLANEOUS↗

Investigation of Various Wind Turbine Drivetrain Condition Monitoring Techniques (Presentation)

This presentation was given at the 2011 Wind Turbine Reliability Workshop sponsored by Sandia National Laboratories in Albuquerque, NM on August 2-3, 2011. It discusses work for the Gearbox Reliability Collaborative including downtime caused by turbine subsystems, annual failure frequency of turbine subsystems, cost benefits of condition monitoring (CM), the Gearbox Reliability Collaborative's condition monitoring approach and rationale, test setup, and results and observations.

17 WIND ENERGY↗

Present Status of the ILC Project and Development

The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

43 PARTICLE ACCELERATORS↗

Present Status And First Results of the Final Focus Beam Line at the KEK Accelerator Test Facility

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.

43 PARTICLE ACCELERATORS↗