Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Additional EIPC Study Analysis: Final Report

Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Glass Coating Manufacturing Line

This project aims to enable US module manufacturers to coat glass with Enki’s state of the art tunable functionalized AR coatings at the lowest possible cost and highest possible performance by encapsulating Enki’s coating process in an integrated tool that facilitates effective process improvement through metrology and data analysis for greater quality and performance while reducing footprint, operating and capital costs. The Phase 1 objective was a fully designed manufacturing line, including fully specified equipment ready for issue of purchase requisitions; a detailed economic justification based on market prices at the end of Phase 1 and projected manufacturing costs and a detailed deployment plan for the equipment.

14 SOLAR ENERGY↗

Real Gas/Blunt Cone

In this chapter recent activity in real-gas database definition and code validation will be summarized. In the Phase I report of the Working Group (WG) 181, aerothermodynamic problems were classified, for purpose of discussion, into seven types: aerodynamic parameters, viscous/shock interaction, boundary-layer transition, forebody-heating/heat-transfer, radiation and ablation, lee and base-region flow, and low-density flow. Several of these problem types were the subject of various chapters of the Phase 1 report describing real-gas effects and ground test facility issues. In this chapter some background and objectives outlined in the real-Gas effects Chapter V of the Phase 1 report will be reviewed. The results of the blunt cone test campaign developed under the auspices of the WG18 activity to study real-gas phenomena will be summarized, including the experimental and computational programs, issues and questions, and recommendations. Further, recent progress in other real-gas areas beyond the blunt cone test campaign will be discussed. Finally, a summary in which the present status of our understanding of real-gas issues will be presented.

George S. Delwert↗

High-power converters for space applications

Phase 1 was a concept definition effort to extend space-type dc/dc converter technology to the megawatt level with a weight of less than 0.1 kg/kW (220 lb./MW). Two system designs were evaluated in Phase 1. Each design operates from a 5 kV stacked fuel cell source and provides a voltage step-up to 100 kV at 10 A for charging capacitors (100 pps at a duty cycle of 17 min on, 17 min off). Both designs use an MCT-based, full-bridge inverter, gaseous hydrogen cooling, and crowbar fault protection. The GE-CRD system uses an advanced high-voltage transformer/rectifier filter is series with a resonant tank circuit, driven by an inverter operating at 20 to 50 kHz. Output voltage is controlled through frequency and phase shift control. Fast transient response and stability is ensured via optimal control. Super-resonant operation employing MCTs provides the advantages of lossless snubbing, no turn-on switching loss, use of medium-speed diodes, and intrinsic current limiting under load-fault conditions. Estimated weight of the GE-CRD system is 88 kg (1.5 cu ft.). Efficiency of 94.4 percent and total system loss is 55.711 kW operating at 1 MW load power. The Maxwell system is based on a resonance transformer approach using a cascade of five LC resonant sections at 100 kHz. The 5 kV bus is converted to a square wave, stepped-up to a 100 kV sine wave by the LC sections, rectified, and filtered. Output voltage is controlled with a special series regulator circuit. Estimated weight of the Maxwell system is 83.8 kg (4.0 cu ft.). Efficiency is 87.2 percent and total system loss is 146.411 kW operating at 1 MW load power.

Park, J. N.↗

Large liquid rocket engine transient performance simulation system

Phase 1 of the Rocket Engine Transient Simulation (ROCETS) program consists of seven technical tasks: architecture; system requirements; component and submodel requirements; submodel implementation; component implementation; submodel testing and verification; and subsystem testing and verification. These tasks were completed. Phase 2 of ROCETS consists of two technical tasks: Technology Test Bed Engine (TTBE) model data generation; and system testing verification. During this period specific coding of the system processors was begun and the engineering representations of Phase 1 were expanded to produce a simple model of the TTBE. As the code was completed, some minor modifications to the system architecture centering on the global variable common, GLOBVAR, were necessary to increase processor efficiency. The engineering modules completed during Phase 2 are listed: INJTOO - main injector; MCHBOO - main chamber; NOZLOO - nozzle thrust calculations; PBRNOO - preburner; PIPE02 - compressible flow without inertia; PUMPOO - polytropic pump; ROTROO - rotor torque balance/speed derivative; and TURBOO - turbine. Detailed documentation of these modules is in the Appendix. In addition to the engineering modules, several submodules were also completed. These submodules include combustion properties, component performance characteristics (maps), and specific utilities. Specific coding was begun on the system configuration processor. All functions necessary for multiple module operation were completed but the SOLVER implementation is still under development. This system, the Verification Checkout Facility (VCF) allows interactive comparison of module results to store data as well as provides an intermediate checkout of the processor code. After validation using the VCF, the engineering modules and submodules were used to build a simple TTBE.

Mason, J. R.↗

The NMDA receptor NR2A subunit regulates proliferation of MKN45 human gastric cancer cells

The present study investigated proliferation of MKN28 and MKN45 human gastric cancer cells regulated by the N-methyl-D-aspartate (NMDA) receptor subunit. The NMDA receptor antagonist DL-2-amino-5-phosphonovaleric acid (AP5) inhibited proliferation of MKN45 cells, but not MKN28 cells. Of the NMDA subunits such as NR1, NR2 (2A, 2B, 2C, and 2D), and NR3 (3A and 3B), all the NMDA subunit mRNAs except for the NR2B subunit mRNA were expressed in both MKN28 and MKN45 cells. MKN45 cells were characterized by higher expression of the NR2A subunit mRNA and lower expression of the NR1 subunit mRNA, but MKN28 otherwise by higher expression of the NR1 subunit mRNA and lower expression of the NR2A subunit mRNA. MKN45 cell proliferation was also inhibited by silencing the NR2A subunit-targeted gene. For MKN45 cells, AP5 or knocking-down the NR2A subunit increased the proportion of cells in the G{sub 1} phase of cell cycling and decreased the proportion in the S/G{sub 2} phase. The results of the present study, thus, suggest that blockage of NMDA receptors including the NR2A subunit suppresses MKN45 cell proliferation due to cell cycle arrest at the G{sub 1} phase; in other words, the NR2A subunit promotes MKN45 cell proliferation by accelerating cell cycling.

60 APPLIED LIFE SCIENCES↗

Mars Global Surveyor: Aerobraking and Observations Support Using a Mars Global Circulation Model

This is a Final Report for a Joint Research Interchange (JRI) between NASA Ames Research Center and San Jose State University, Department of Meteorology. Using a global atmospheric circulation model for Mars, the focus of this JRI has been to provide support for the Mars Global Surveyor (MGS) spacecraft aerobraking activities and interpretation guidance of preliminary observations. ne primary atmospheric model applied in this investigation has been a high-top version of the NASA Ames Mars general circulation model (MGCM). Comparisons with an atmospheric model designed primarily for engineering purposes (Mars-GRAM) has also been carried out. From a suite of MGCM simulations, we have assessed plausible spatial and temporal variability in atmospheric density at high altitudes (e.g., 70-110 km) for seasonal dates and locations during Phase 1 aerobraking. Diagnostic tools have been developed to analyze circulation fields from the MGCM simulations, and these tools have been applied in the creation of a Mars climate catalogue database. Throughout Phase 1 aerobraking activities, analysis products have been provided to the MGS aerobraking atmospheric advisory group (AAG). Analyses of circulation variability at the coupling level between the MGCM and a Mars thermospheric global circulation model (MTGCM) has also been assessed. Finally, using a quasi-geostrophic dynamical formulation with the MGCM simulations, diagnosis of breaking planetary (Rossby) waves in Mars' middle atmosphere has been carried out. Titles of papers presented at scientific workshops and seminars, and a publication in the scientific literature are provided.

Hollingsworth, Jeffery L.↗

Miniature infrared data acquisition and telemetry system

The Miniature Infrared Data Acquisition and Telemetry (MIRDAT) Phase 1 study was performed to determine the technical and commercial feasibility of producing a miniaturized electro-optical telemetry system. This system acquires and transmits experimental data from aircraft scale models for realtime monitoring in wind tunnels. During the Phase 1 study, miniature prototype MIRDAT telemetry devices were constructed, successfully tested in the laboratory and delivered to the user for wind tunnel testing. A search was conducted for commercially available components and advanced hybrid techniques to further miniaturize the system during Phase 2 development. A design specification was generated from laboratory testing, user requirements and discussions with component manufacturers. Finally, a preliminary design of the proposed MIRDAT system was documented for Phase 2 development.

Stokes, J. H.↗

Findings from Large Bench-Scale Testing of Denitration Electrolyzers for the EDCGe Project

This report highlights the key findings and outcomes relevant to the processability of waste supernatant at Hanford using a denitration electrolyzer. The Electrosynthesis Company issued a Phase 1 report to the Savannah River National Laboratory (SRNL), summarizing the evaluation of large bench-scale denitration electrolyzers to support the electrochemical denitration and caustic generation (EDCGe) project. The Electrosynthesis Company’s report (attached as Appendix A) provides insights into the initial steps required to implement an electrolyzer system at Hanford. Phase 1 experiments focused on validating the denitration electrolyzer’s performance, operating parameters, and reaction products. The robustness of the electrochemical denitration process was demonstrated by two electrolyzer flow cell systems (a 100 cm 2 ElectroCell MP and a 150 cm 2 NESI NS01 cell), both of which achieved significant nitrate and nitrite removal (>50%) with a current efficiency of ~95% for both systems. Higher current densities (500 mA cm –2 ) improved nitrate and nitrite removal rates compared to lower current densities (333 mA cm –2 ), while maintaining a current efficiency of ~94%. The NS01 cell achieved a nitrate species removal rate of ~0.41 mol h –1 at 5 kA m –2 (equiv. to 500 mA cm –2 ). The primary reaction product was ammonia (NH 3 ), constituting 78.3–91.6% of the products (excluding OH – formation). NH 3 was predominantly retained in the catholyte liquid phase rather than being off-gassed. Additionally, the NS01 cell reported an NH 3 generation rate of ~0.36 mol h –1 at 5 kA m –2 . Other gas formation included ~7% N 2 , ~7% H 2 , and trace amounts of N 2 O. The estimated power requirement (extrapolated from the 0.015 m 2 cell data) for a full-scale denitration electrolyzer is approximated to be ~1.6 MW (DC-only) to treat 50% of nitrate and nitrite in a waste stream and generates ~2.1 kmol h –1 of NH 3 with an initial concentration of 4 M NO 3 – /NO 2 – at 300 gal h –1 . Simulated waste containing aluminate, carbonate, oxalate, and halogens exhibited no adverse effects on denitration performance. A preliminary experiment comparing alkaline anolyte (5 M NaOH) with a nickel based anode to acidic media (2 M H 2 SO 4 ) with a DSA-O 2 anode showed a lower operating voltage and generated less H 2 than the acid media. Maintaining a stable 5 M OH – concentration in the anolyte through periodic additions of caustic did not significantly impact denitration performance. This operational mode will be required for long-term experiments. All the experiments demonstrated that electrochemical denitration is a promising approach for treating nitrate and nitrite in simulated waste streams, achieving significant conversion and robustness across varying experimental conditions and electrochemical cell configurations. Lastly, the ability to generate a nearly pure NH 3 stream may prove advantageous for processing at other locations within the Hanford site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Wide Angle Neutron Diffractometer squared (WAND2) - Possibilities and future

The Wide Angle Neutron Diffractometer (WAND) at the High Flux Isotope Reactor (HFIR), Oak Ridge National Laboratory (ORNL) has been built and continues to be, a joint project between ORNL and the Japan Atomic Energy Agency (JAEA). Equipped with a 1-dimensional position sensitive detector (PSD), the instrument is a multi-purpose instrument for both powder and single crystal diffraction. WAND is currently in the process of a 2-phase upgrade to become a world-class, general purpose instrument. In phase 1, finished in the beginning of 2016, the whole instrument was essentially re-built from scratch, keeping only the front-end and the 1-D PSD. Phase 2 will replace the 1-D PSD with the state-of-the-art BNL120 2-D PSD which comes from the Los Alamos Neutron Science Center. Currently, the detector is integrated off-line into the data acquisition architecture at HFIR and SNS. The new instrument, WAND2, will have event mode capability, improved efficiency, and higher resolution and will be available for general users in the proposal call 2018A. This contribution presents results highlighting the improvements on WAND after phase 1. The upgraded instrument now accommodates the whole suite of available sample environment (50 mK–1500 K, magnetic fields (5 T), high pressures (4 GPa)). Also, the background could be reduced significantly by a factor of 2 through improved shielding, allowing the detection of weak signals. The phase 2 upgrade will require new electronics, data acquisition, and visualization and will result in an altogether new instrument: WAND2.

Frontzek, Matthias D.↗

NASA wide electronic publishing system: Electronic printing and duplicating. Stage 3 evaluation report

The report is presented in four sections: The Introduction describes the duplicating configuration under evaluation and the Background contains a chronological description of the evaluation segmented by phases 1 and 2. This section includes the evaluation schedule, printing and duplicating requirements, storage and communication requirements, electronic publishing system configuration, existing processes and proposed processes, billing rates, costs and productivity analysis, and the return on investment based upon the data gathered to date. The third section contains the phase 1 comparative cost and productivity analysis. This analysis demonstrated that LaRC should proceed with a 90-day evaluation of the DocuTech and follow with a phase 2 cycle to actually demonstrate that the proposed system would meet the needs of LaRC's printing and duplicating requirements, benchmark results, cost comparisons, benchmark observations, and recommendations. These are documented after the recommendations.

Tuey, Richard C.↗

Performance Metric for Cementitious Waste Form Inventory Release in the Integrated Disposal Facility

This report describes work supporting Phase 1 of the 2018 Department of Energy (DOE) Office of River Protection’s (ORP) Grand Challenge recipient proposal “Cementitious Immobilization of Treated LAW and Ancillary Benefits to Risk Reduction in Cross Site Transfer”. Phase 1 was to establish a performance metric for grout leachability against which laboratory leach data (as observed diffusivities) can be assed, followed by a comparison of historical test data against this metric. Historically, advancements in the cementitious (grout) waste form performance have been made over the last 40 years, with the majority of progress achieved within the past 8 years as part of the Washington River Protection Solutions, LLC testing program. This report presents a summary of that effort relevant to the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sister Rod Destructive Examinations (FY2021) Appendix C: Rod Internal Pressure, Void Volume, and Gas Transmission Tests

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWD/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called the sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. This Appendix C documents the status of the ORNL Phase 1 DE activities [C-2, C-3] related to rod internal pressure and void volume measurement techniques, fission gas stack flow measurements applied to selected sister rods, and fission gas release calculations in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS

In 2020, Patua Acquisition Company LLC, submitted the proposal “Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS”, in response to the DOE’s Geothermal Wells of Opportunity Funding Opportunity Announcement. The primary goal of the project was to convert an idle well, Patua 16-29, to an active producer and generate at least an additional 5 MWe at the Patua plant. The project was intended to provide an example of a reproducible methodology for well stimulation in Enhanced Geothermal Systems The project was proposed to be performed in three phases over a period of performance of four years. A first project go/no-go decision was made at the end of Phase 1 based on feasibility of the wellbore, site, and ability to realize a 5 MWe benefit from the project. Several factors were recognized that led to a no-go decision at this phase: • Electrical needs for placing the stimulated well on production were not considered in the initial scoping. Costs of pipeline costs were also underestimated in the original cost share. Easements and rights-of-way to establish a geothermal pipeline underneath or across an interstate highway were also found to be intractable on the time scale of the project. • The plant is injection limited, and no design or cost estimate was in place to handle the additional production needed to realize a 5 Mwe benefit. A new injection well would need to be drilled in addition to the other facility improvements to bring in the stimulated well. Patau Acquisition Company attempted to locate additional wells of opportunity that could realize the SOPOs goals, but was unsuccessful. As a result, this project is being terminated at the end of Phase 1.

15 GEOTHERMAL ENERGY↗

Broadening Systematic Reanalysis lntercomparisons in the SPARC-Reanalysis lntercomparison Project Phase 2 (S-RIP2): Chemical Reanalyses & Air Quality, Tropospheric Circulation, Extreme Events, and More

Reanalysis datasets are widely used to understand numerous atmospheric processes. Different reanalyses may give very different results for the same diagnostics. The Stratosphere-troposphere Processes And their Role in Climate (SPARC) Reanalysis Intercomparison Project (S-RIP, https://s-rip.github.io/) is a coordinated activity to compare key diagnostics among available reanalyses, identify differences among reanalyses and their underlying causes, provide guidance on appropriate usage of reanalyses in scientific studies, and contribute to future improvements in the reanalysis products via collaborations with reanalysis centers and data users. S-RIP Phase 1 (completed in early 2022) focused primarily on the upper troposphere through the middle atmosphere and processes linking these regions to the troposphere and surface. We look forward to broadening our efforts in Phase 2 (S-RIP2), with new foci including studies of tropospheric circulation, extreme weather events, and their links to the stratosphere, and focusing on evaluation of chemical reanalyses, both those with a stratosphere / upper troposphere focus and those that focus on air quality applications. This presentation will provide a summary of Phase 1 results and discussion of future directions for S-RIP2, emphasizing applications to composition and chemistry studies as well as fostering capacity building for Early Career Scientists.

Sean M Davis↗

Broadening Systematic Reanalysis Intercomparisons in the SPARC-Reanalysis Intercomparison Project Phase 2 (S-RIP2): Chemical Reanalyses & Air Quality, Tropospheric Circulation, Extreme Events, and More

Reanalysis datasets are widely used to understand numerous atmospheric processes. Different reanalyses may give very different results for the same diagnostics. The Stratosphere-troposphere Processes And their Role in Climate (SPARC) Reanalysis Intercomparison Project (S-RIP, https://s-rip.github.io/) is a coordinated activity to compare key diagnostics among available reanalyses, identify differences among reanalyses and their underlying causes, provide guidance on appropriate usage of reanalyses in scientific studies, and contribute to future improvements in the reanalysis products via collaborations with reanalysis centers and data users. S-RIP Phase 1 (completed in early 2022) focused primarily on the upper troposphere through the middle atmosphere and processes linking these regions to the troposphere and surface. We look forward to broadening our efforts in Phase 2 (S-RIP2), with new foci including studies of tropospheric circulation, extreme weather events, and their links to the stratosphere, and focusing on evaluation of chemical reanalyses, both those with a stratosphere / upper troposphere focus and those that focus on air quality applications. This presentation will provide a summary of Phase 1 results and discussion of future directions for S-RIP2, emphasizing applications to composition and chemistry studies as well as fostering capacity building for Early Career Scientists.

Sean M Davis↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1: Primary Results

This presentation covers the primary results of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project Terminal Operations Foundational Human-in-the-Loop (HITL) simulation. The study tasked 16 pilots (half with manned piloting experience, and the other half with unmanned piloting experience) with maintaining "well clear" from other traffic while performing three different types of approaches into the Santa Rosa airport. A detect and avoid (DAA) system was provided to pilots to assist their ability to manage separation. The DAA system used in this test conformed to the criteria defined by RTCA Special Committee 228 (SC-228) in their Phase 1 Minimum Operational Performance Standards (MOPS) for UAS intending to operate in the NAS. The Phase 1 system was not designed to account for terminal operations, focusing instead on en route operations. To account for this, three different alerting and guidance configurations were presently tested in order to determine their effect on pilots operating the system in the terminal area. Results indicated that pilots with the alerting and guidance condition that provided the least amount of assistance (fewer alert levels and guidance types) experienced slightly increased pilot response times and rates of losses of separation. Additional data is presented on the effects of approach type and descriptive data on pilot maneuver preferences and ATC interoperability.

terminal environmen↗

Range Fuels Inc/ Range Fuels Soperton Plant LLC Final Technical Report

Range Fuels Soperton Plant LLC (Recipient) signed an amended TIA with the DOE to help facilitate the design, construction, and operation of a commercial scale biorefinery for production of biofuels and other products in a replicable, commercial, integrated biorefinery process that will meet or exceed DOE requirement as required in the FOA for processing at least 700 dry (metric) tonnes per day (772 dry short tons per day) of lignocellulosic feedstocks from forestry waste and timber. Construction of the Project was to be carried out in two distinct phases. During Phase 1, a module with a Design Capacity of 125 dry tons per day was to be constructed and operated to demonstrate commercial scale operational and technological viability and provide data for Project design optimization. Phase 2 would consist of five additional modules with a combined Design Capacity of at least 650 dry tons per day incorporating Phase 1 into an integrated facility with a total Design Capacity of 775 dry tons per day meeting or exceeding DOE's commercial throughput requirements for the Project. This funding is intended to partially reimburse the initial construction, commissioning and startup, and operating costs for this first-of-its-kind integrated biorefinery and enable the development of a biofuels industry. This purpose is consistent with Section 932 of the Energy Policy Act of 2005. The plant was built on schedule and under budget.

09 BIOMASS FUELS↗