Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Distributed and Centralized Conflict Management Under Traffic Flow Management Constraints

Current air transportation in the United States relies on a system born half a century ago. While demand for air travel has kept increasing over the years, technologies at the heart of the National Airspace System (NAS) have not been able to follow an adequate evolution. For instance, computers used to centralize flight data in airspace sectors run a software developed in 1972. Safety, as well as certification and portability issues arise as major obstacles for the improvement of the system. The NAS is a structure that has never been designed, but has rather evolved over time. This has many drawbacks, mainly due to a lack of integration and engineering leading to many inefficiencies and losses of performance. To improve the operations, understanding of this complex needs to be built up to a certain level. This work presents research done on Air Traffic Management (ATM) at the level of the en-route sector.

Feron, Eric↗

Command and Control Software Development Memory Management

This internship was initially meant to cover the implementation of unit test automation for a NASA ground control project. As is often the case with large development projects, the scope and breadth of the internship changed. Instead, the internship focused on finding and correcting memory leaks and errors as reported by a COTS software product meant to track such issues. Memory leaks come in many different flavors and some of them are more benign than others. On the extreme end a program might be dynamically allocating memory and not correctly deallocating it when it is no longer in use. This is called a direct memory leak and in the worst case can use all the available memory and crash the program. If the leaks are small they may simply slow the program down which, in a safety critical system (a system for which a failure or design error can cause a risk to human life), is still unacceptable. The ground control system is managed in smaller sub-teams, referred to as CSCIs. The CSCI that this internship focused on is responsible for monitoring the health and status of the system. This team's software had several methods/modules that were leaking significant amounts of memory. Since most of the code in this system is safety-critical, correcting memory leaks is a necessity.

Programmin↗

A Model-Predictive Hierarchical-Control Framework for Aggregating Residential DERs to Provide Grid Regulation Services

This paper develops a hierarchical control frame-work to aggregate and to manage behind-the-meter distributed energy resources (DERs), which will be ubiquitous in future distribution systems. In the proposed framework, firstly, each controller in the hierarchy determines the flexibility of the DERs such that the obtained flexibility is feasible with respect to its operational purview. For example, the operational purview of a home energy management system may only consider consumer comfort preferences, while that for an aggregator or a grid controller may consider network voltage management as well. Based on the feasible flexibility, optimal setpoints for the DERs is then determined by the hierarchical controllers to help the distribution power network in voltage regulation, coordination issues with existing transmission-level conventional generators, etc. Therefore, the proposed strategy, which is based on model-predictive control, can be effectively utilized by the distribution network to coordinate several DERs to provide grid regulation services. Numerical simulations performed on the IEEE 37-bus test system demonstrate the efficacy of the proposed approach.

behind-the-meter↗

A Voltage Inference Framework for Real-Time Observability in Active Distribution Grids

Active distribution grids are gaining traction to meet the growing environmental, socio-economic, and sustainability targets. Various advanced smart grid technologies facilitate the integration of Distributed Energy Resources (DERs) by supporting the bi-directional power flow. The limited observability of distribution grids, primarily related to their location at the very edge of power system infrastructure, brings challenges to optimal grid management. Moreover, only a limited number of measurements at regular intervals are usually available. This paper presents a novel inference framework, referred to as “Voltage Inference”, to overcome the observability issues. The proposed framework employs a prediction step based on the Multivariate Taylor series approximation, followed by a corrector step that minimizes the estimation error to infer the otherwise unknown voltages from the available measurements. Furthermore, numerical results on the IEEE 13-bus test feeder validate the accuracy and computational performance of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Paraview-MCP

This project provides a streamlined way for users to interact with and control powerful scientific visualization software (ParaView) through a conversational interface. By developing an automated "Model Context Protocol" (MCP) server with a Python-based ParaView manager, the system allows users to seamlessly load and visualize complex datasets, explore visualization options with AI assistance, and optimize visualization output in a close loop. This is achieved by issuing intuitive, natural-language commands. The result is a user-friendly interface that integrates high-level conversation and scriptable data visualization, making scientific visualization tools more accessible to a broad audience.

Liu, Shusen [Lawrence Livermore National Laborator↗

Data Steward Team Wall-To-Wall Inventory Status Update July - September 2023 [Slides]

8 Wall-to-wall inventories were completed between July 3rd – September 20th, 2023. The scheduling was broken down by FODs, and the team completed UI and IF. The team viewed 12 sites across 7 technical areas. A total of 249 containers were verified against current WCATS data. 2 containers were unable to be verified due to lack of WMC response. We worked with WMCs and Environmental Stewardship teams this quarter to schedule the wall-to-wall inventories. Discrepancies that were found were fixed by the WMCs in a timely manner. Most of the discrepancies were Labeling issues which were resolved the day of the walk down or within a week.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design representation and consistency maintenance needs

Two major issues of data base support for large-scale engineering design are considered. The first deals with the need to support multidisciplinary, hierarchical and interactive design without imposing a priori constraints on the sequence of design decisions. An abstract logical model of the data base capable of such support is outlined. The second issue deals with the role the data base must play in maintaining integrity and consistency among the data representing the emerging design. A tentative model implementing a number of consistency management functions is presented.

Eastman, C. M.↗

Telescience in the Space Station era

Telescience refers to the development of systems where participants involved in research in space can access their fellow scientists and the appropriate NASA services before flight, during flight, and after flight, preferably from their home institutions and through the same equipment. Telescience requires integration of available technologies to develop computer environments that maintain interoperability across different disciplines and different portions of the lifetimes of space experiments, called teledesign, teleoperations, and teleanalysis. Participants in the NASA Telescience Testbed Program are using a rigid prototyping approach to evaluate the necessary technologies and select the options and tradeoffs that best suit their accustomed modalities. The concept of transaction management is described, where the emphasis is placed on the effects of commands, whether event-generated onboard the spacecraft or sent up from the ground. Interoperability, security, and privacy issues are also discussed, and the Telescience Testbed Pilot Program is described.

Schmerling, E. R.↗

Ground equipment for the support of packet telemetry and telecommand

This paper describes ground equipment for packet telemetry and telecommand which has been recently developed by industry for the European Space Agency. The architectural concept for this type of equipment is outlined and the actual implementation is presented. Focus is put on issues related to cross support and telescience as far as they affect the design of the interfaces to the users of the services provided by the equipment and to the management entities in charge of equipment control and monitoring.

Hell, Wolfgang↗

Estimating the costs of human space exploration

The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

Mandell, Humboldt C., Jr.↗

Monitoring with Trackers Based on Semi-Quantitative Models

In three years of NASA-sponsored research preceding this project, we successfully developed a technology for: (1) building qualitative and semi-quantitative models from libraries of model-fragments, (2) simulating these models to predict future behaviors with the guarantee that all possible behaviors are covered, (3) assimilating observations into behaviors, shrinking uncertainty so that incorrect models are eventually refuted and correct models make stronger predictions for the future. In our object-oriented framework, a tracker is an object which embodies the hypothesis that the available observation stream is consistent with a particular behavior of a particular model. The tracker maintains its own status (consistent, superceded, or refuted), and answers questions about its explanation for past observations and its predictions for the future. In the MIMIC approach to monitoring of continuous systems, a number of trackers are active in parallel, representing alternate hypotheses about the behavior of a system. This approach is motivated by the need to avoid 'system accidents' [Perrow, 1985] due to operator fixation on a single hypothesis, as for example at Three Mile Island. As we began to address these issues, we focused on three major research directions that we planned to pursue over a three-year project: (1) tractable qualitative simulation, (2) semiquantitative inference, and (3) tracking set management. Unfortunately, funding limitations made it impossible to continue past year one. Nonetheless, we made major progress in the first two of these areas. Progress in the third area as slower because the graduate student working on that aspect of the project decided to leave school and take a job in industry. I enclosed a set of abstract of selected papers on the work describe below. Several papers that draw on the research supported during this period appeared in print after the grant period ended.

Kuipers, Benjamin↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

Cognitive Functioning in Space Exploration Missions: A Human Requirement

Solving cognitive issues in the exploration missions will require implementing results from both Human Behavior and Performance, and Space Human Factors Engineering. Operational and research cognitive requirements need to reflect a coordinated management approach with appropriate oversight and guidance from NASA headquarters. First, this paper will discuss one proposed management method that would combine the resources of Space Medicine and Space Human Factors Engineering at JSC, other NASA agencies, the National Space Biomedical Research Institute, Wyle Labs, and other academic or industrial partners. The proposed management is based on a Human Centered Design that advocates full acceptance of the human as a system equal to other systems. Like other systems, the human is a system with many subsystems, each of which has strengths and limitations. Second, this paper will suggest ways to inform exploration policy about what is needed for optimal cognitive functioning of the astronaut crew, as well as requirements to ensure necessary assessment and intervention strategies for the human system if human limitations are reached. Assessment strategies will include clinical evaluation and fitness-to-perform evaluations. Clinical intervention tools and procedures will be available to the astronaut and space flight physician. Cognitive performance will be supported through systematic function allocation, task design, training, and scheduling. Human factors requirements and guidelines will lead to well-designed information displays and retrieval systems that reduce crew time and errors. Means of capturing process, design, and operational requirements to ensure crew performance will be discussed. Third, this paper will describe the current plan of action, and future challenges to be resolved before a lunar or Mars expedition. The presentation will include a proposed management plan for research, involvement of various organizations, and a timetable of deliverables.

Fiedler, Edan↗

Multiphase Flow Technology Impacts on Thermal Control Systems for Exploration

The Two-Phase Flow Facility (TPHIFFy) Project focused on bridging the critical knowledge gap by developing and demonstrating critical multiphase fluid products for advanced life support, thermal management and power conversion systems that are required to enable the Vision for Space Exploration. Safety and reliability of future systems will be enhanced by addressing critical microgravity fluid physics issues associated with flow boiling, condensation, phase separation, and system stability. The project included concept development, normal gravity testing, and reduced gravity aircraft flight campaigns, in preparation for the development of a space flight experiment implementation. Data will be utilized to develop predictive models that could be used for system design and operation. A single fluid, two-phase closed thermodynamic loop test bed was designed, assembled and tested. The major components in this test bed include: a boiler, a condenser, a phase separator and a circulating pump. The test loop was instrumented with flow meters, thermocouples, pressure transducers and both high speed and normal speed video cameras. A low boiling point surrogate fluid, FC-72, was selected based on scaling analyses using preliminary designs for operational systems. Preliminary results are presented which include flow regime transitions and some observations regarding system stability.

McQuillen, John↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

Mars Express Forward Link Capabilities for the Mars Relay Operations Service (MaROS)

This software provides a new capability for landed Mars assets to perform forward link relay through the Mars Express (MEX) European Union orbital spacecraft. It solves the problem of standardizing the relay interface between lander missions and MEX. The Mars Operations Relay Service (MaROS) is intended as a central point for relay planning and post-pass analysis for all Mars landed and orbital assets. Through the first two phases of implementation, MaROS supports relay coordination through the Odyssey orbiter and the Mars Reconnaissance Orbiter (MRO). With this new software, MaROS now fully integrates the Mars Express spacecraft into the relay picture. This new software generates and manages a new set of file formats that allows for relay request to MEX for forward and return link relay, including the parameters specific to MEX. Existing MEX relay planning interactions were performed via email exchanges and point-to-point file transfers. By integrating MEX into MaROS, all transactions are managed by a centralized service for tracking and analysis. Additionally, all lander missions have a single, shared interface with MEX and do not have to integrate on a mission-by mission basis. Relay is a critical element of Mars lander data management. Landed assets depend largely upon orbital relay for data delivery, which can be impacted by the availability and health of each orbiter in the network. At any time, an issue may occur to prevent relay. For this reason, it is imperative that all possible orbital assets be integrated into the overall relay picture.

Allard, Daniel A.↗

Two Air Quality Regimes in Total Column NO2 over the Gulf of Mexico in May 2019: Shipboard and Satellite Views

The Satellite Coastal and Oceanic Atmospheric Pollution Experiment (SCOAPE) cruise in the Gulf of Mexico was conducted in May 2019 by NASA and the Bureau of Ocean Energy Management to determine the feasibility of using satellite data to measure air quality in a region of concentrated oil and natural gas (ONG) operations. SCOAPE addressed both technological and scientific issues related to measuring NO2 columns over the Outer Continental Shelf. Featured were nitrogen dioxide (NO 2 ) instruments (Pandora, Teledyne API analyzer) at Cocodrie, LA (29.26°, -90.66°), and on the Research Vessel Point Sur operating off the Louisiana coast with measurements of ozone, carbon monoxide and volatile organic compounds (VOC). The findings: (1) All NO 2 observations revealed two atmospheric regimes over the Gulf, the first influenced by tropical air in 10-14 May, the second influenced by flow from urban areas on 15-17 May; (2) Comparisons of OMI v4 and TROPOMI v1.3 TC (total column) NO 2 data with shipboard Pandora NO 2 column observations averaged 13% agreement with the largest difference during 15-17 May (~20%). At Cocodrie, the satellite-Pandora agreement was ~5%. (3) Three new-model Pandora instruments displayed a TC NO 2 precision of 0.01 Dobson Units (~5%); (4) Regions of smaller, older natural gas operations showed high methane readings from leakage; elevated VOC were also detected. Neither satellite nor spectrometer captured the magnitude of ambient NO 2 variability near ONG platforms. Given an absence of regular air quality monitoring over the Gulf of Mexico, SCOAPE data constitute a baseline against which future observations can be compared.

Nitrogen dioxide↗

A Model-Predictive Hierarchical-Control Framework for Aggregating Residential DERs to Provide Grid Regulation Services

This paper develops a hierarchical control frame-work to aggregate and to manage behind-the-meter distributed energy resources (DERs), which will be ubiquitous in future distribution systems. In the proposed framework, firstly, each controller in the hierarchy determines the flexibility of the DERs such that the obtained flexibility is feasible with respect to its operational purview. For example, the operational purview of a home energy management system may only consider consumer comfort preferences, while that for an aggregator or a grid controller may consider network voltage management as well. Based on the feasible flexibility, optimal setpoints for the DERs is then determined by the hierarchical controllers to help the distribution power network in voltage regulation, coordination issues with existing transmission-level conventional generators, etc. Therefore, the proposed strategy, which is based on model-predictive control, can be effectively utilized by the distribution network to coordinate several DERs to provide grid regulation services. Numerical simulations performed on the IEEE 37-bus test system demonstrate the efficacy of the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗