Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “appendix”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

APPLICATION OF THE FAVOR-OCI FRACTURE MECHANICS COMPUTER PROGRAM TO ASME CODE SECTION XI, IWB-3610 FLAW ACCEPTANCE CRITERIA EVALUATIONS

This paper presents an overview of added features in a new version of the FAVOR (Fracture Analysis of Vessels Oak Ridge) computer code called FAVOR-OCI. The original FAVOR code was developed at the US Department of Energy’s Oak Ridge National Laboratory (ORNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). FAVOR is applied by US and international nuclear power industries to perform deterministic and probabilistic fracture mechanics analyses of commercial nuclear reactor pressure vessels (RPVs). Appli-cations of FAVOR are focused on insuring that the structural integrity of aging, and increasingly embrittled, RPVs is main-tained throughout their licensed service life. Based on the final ORNL release of FAVOR, v16.1, FAVOR-OCI extends existing deterministic features of FAVOR while preserving all prev-iously-existing probabilistic capabilities of FAVOR.The objective of this paper is to describe new deterministic features in FAVOR-OCI that can be applied to analytical evaluations of planar flaws. These evaluations are consistent with the acceptance criteria of ASME Code, Section XI, Article IWB-3610, including Subarticles IWB-3611 (acceptance based on flaw size) and IWB-3612 (acceptance based on applied stress intensity factor). The linear elastic fracture mechanics (LEFM) capabilities of FAVOR-OCI also incorporate the analytical procedures presented in the Nonmandatory Appendix A, Analysis of Flaws, Article A-3000, Method of KI Determination, for both surface and subsurface (embedded) flaws.The paper describes a computational methodology for determining critical values of fracture-related parameters that satisfy ASME Code Section XI acceptance criteria for flaws exposed to multiple thermal-hydraulic transients. These com-pute-intensive analyses can be carried out with a single execution of FAVOR-OCI. The new methodology determines critical values by solving for either the point of tangency or point of intersection between applied KI versus time histories and a user-selected fracture toughness material property (e.g., ASME KIc, FAVOR Weibull KIc, or Master Curve Weibull KJc) for surface or subsurface flaws. Situations where warm prestress conditions apply can also be addressed. The paper highlights a need for this new capability via applications to a recent independent review of safety cases for RPVs in two Belgian nuclear power plants (NPPs). That review required ASME Section XI assessments of several thousand embedded, quasi-laminar flaws in the wall of each RPV. Analysis results provided by the new capability contributed to the technical bases compiled from several sources by the Belgian nuclear regulatory agency (FANC) and eventually used by FANC to justify the restart of these NPPs.

Dickson, Terry L.↗

Commercial SNF Pickup Queue Under the Standard Contact and Analysis of Hypothetical Alternate Acceptance Strategies

The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961) establishes the terms and conditions under which the U.S. Department of Energy (DOE) will make available nuclear waste disposal services to the owners and generators of spent nuclear fuel (SNF) and high-level radioactive waste (HLW), as provided in section 302 of the Nuclear Waste Policy Act of 1982 (NWPA) as amended, and by which DOE will take title to, transport, and dispose of SNF and/or HLW delivered to DOE by those owners or generators who execute the contract. The Standard Contract establishes the process for allocating the federal government’s finite waste acceptance capacity among those various owners/generators. This acceptance allocation, also known as the acceptance queue, orders acceptance and transportation priority in accordance with the principle of “oldest fuel first” (OFF). Under the OFF methodology, the oldest SNF, as measured from the date of permanent discharge from the reactor, is given the highest priority in the acceptance queue. While the date of discharge of spent fuel forms the basis of allocations, the owner/generator can send an equivalent Metric Tons of Uranium (MTU) of SNF that the owner/generator owns in its place, as long as it meets the “Standard Fuel” specifications in Appendix E of the Standard Contract. This is a technical paper that does not take into account the contractual limitations under the Standard Contract. This paper also does not specify the party or parties responsible for any costs discussed herein. This paper provides analysis of hypothetical strategies for accepting SNF and no inferences should be drawn from this paper regarding future actions by DOE. To the extent that discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail.

Joseph III, Robby↗

NONLINEAR SOIL-STRUCTURE INTERACTION ANALYSIS USING CO-SIMULATION

Nonlinear soil-structure interaction (NLSSI) analysis methods are currently being developed at Idaho National Laboratory. Appendix B in ASCE (2016) includes a framework for performing NLSSI analysis. For NLSSI analysis to be widely implemented in industry, it is important to demonstrate that accurate response in dynamically loaded, nonlinear models can be achieved in an efficient manner. Both explicit and implicit dynamic solvers are applicable to NLSSI. When considering cpu time, an explicit dynamic solver is often desirable for large models with no features (e.g. small elements, stiff elements, or stiffness damping) that can drive the time step unreasonably small. An implicit dynamic solver may be desirable in models not well suited for an explicit solver. A further option is co-simulation where a portion of the model is run with an explicit dynamic solver and the rest of the model is run with an implicit dynamic solver. This study explores NLSSI examples where co-simulation could be the most cpu efficient modelling strategy.

99 GENERAL AND MISCELLANEOUS↗

An Assessment of U.S.-Based Electron-Ion Collider Science

The Committee on U.S.-Based Electron-Ion Collider Science Assessment was asked by the Department of Energy (DOE), in its statement of task, to assess the scientific justification for a U.S. domestic electron-ion collider (EIC) facility and to evaluate the importance and urgency of the science that an EIC would address to both nuclear science and the physical sciences more broadly. The committee’s task also included assessing the role of an EIC in the global context, including its relationship to other facilities within the United States and around the world. Lastly, the committee was asked to assess the broader impacts of an EIC, including on U.S. science leadership. The full statement of task is included in Appendix A. In summary, the committee finds a compelling scientific case for such a facility. The science questions that an EIC will answer are central to completing an understanding of atoms as well as being integral to the agenda of nuclear physics today. In addition, the development of an EIC would advance accelerator science and technology in nuclear science; it would also benefit other fields of accelerator-based science and society, from medicine through materials science to elementary particle physics.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Release Notes, QuickView Software

These software release notes for QuickView Software will be used as an appendix in a user manual (which will also be STIPped when completed).

97 MATHEMATICS AND COMPUTING↗

Efficient and Reliable Power Takeoff for Ocean Wave Energy Harvesting

The project goal is to significantly improve the current ocean wave energy harvesting through innovative Power Take-off (PTO) design, advanced power electronics, and novel wave capture structures. The objective of the project is to design and demonstrate system-agnostic components for application across multiple MHK systems, and complete component designs, build scaled prototypes, and perform testing and analysis for metric validation of 25% increase in component rating/per unit cost and 50% reduction in failure rate. The major innovation of the PTO is the Mechanical Motion Rectifier (MMR) mechanism that rectifies the bi-directional oscillatory motion of the input from waves into a steady unidirectional rotation output to directly drive the electrical generator. Through this mechanism, the efficiency and the fatigue life of the PTO can be significantly improved to benefit the energy absorption and lifespan of the wave energy converters (WEC). During the period of performance, the component and system design are completed, the scaled prototypes are developed and performed testing. It is validated that the 25% increase in a component rating/per unit cost. The 50% reduction in failure rate is not directly validated by experiments, however, it can be explained qualitatively with analysis. Besides, 8 journal articles, 13 conference proceedings, 1 patent, 3 Master thesis and two Ph.D. dissertations are published based on the work related to this project. The list of all the publications can be found at the end of the project as an appendix. Over 30 students and postdocs were trained through this project. Three prototypes of 100W and 500W WECs and 10KW PTO were designed, built, and tested in ocean wave tank and using the NREL dynamometer. This project demonstrated 50-80% PTO efficiency, 90-98% power electronics efficiency, up to 66% capture width ratio in irregular waves, and 34% overall efficiency in regular waves.

16 TIDAL AND WAVE POWER↗

National Emission Standards for Hazardous Air Pollutants – Radionuclide Emissions Calendar Year 2020

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) operates the Nevada National Security Site (NNSS) and the North Las Vegas Facility (NLVF). From 1951 through 1992, the NNSS was the continental testing location for U.S. nuclear weapons. Radionuclides in air from NNSS activities have been monitored since the initiation of atmospheric testing. After 1962, testing was limited to underground detonations, which greatly reduced radiation exposure to the public. Since the end of nuclear testing in 1992, radiation monitoring has focused on detecting airborne radionuclides from historically contaminated soils because this sources dominates the potential offsite dose. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of legacy-related tritium are also emitted to air at the NLVF, an NNSS support complex in North Las Vegas. To protect the public from harmful levels of manmade radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP), specifically the National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities (40 CFR 61, Subpart H, 2020) limits the release of radioactivity from a DOE facility to that which would cause 10 millirem per year (mrem/y) effective dose equivalent (EDE) to any member of the public. This limit does not include radiation unrelated to NNSS activities. Unrelated doses could come from naturally occurring radioactive elements, from sources such as medically or commercially used radionuclides, or from sources outside of the United States, such as Japan’s Fukushima nuclear power plant, which was damaged in 2011. NNSA/NFO demonstrates compliance with the NESHAP limit by reporting environmental measurements of radionuclide air concentrations at critical receptor locations on the NNSS. This alternative was proposed and formerly submitted to the U.S. Environmental Protection Agency (EPA) in 2001 (EPA 2001a) and has been the method used to demonstrate compliance with the 40 CFR 61.92 dose standard since 2005. Six locations on the NNSS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are closer to radionuclide releases than where the public resides so they act as protective substitutes for public receptor locations. Compliance is demonstrated if the measured annual average concentration is less than the NESHAP Concentration Level (CL) for Environmental Compliance listed in Table 2 of 40 CFR 61, Appendix E. For multiple radionuclides, compliance is demonstrated when the sum of the fractions (determined by dividing each radionuclide’s concentration by its CL and then adding the fractions together) is less than 1.0. The EPAapproved air transport model, called the Clean Air Package 1988 (CAP88-PC) is also used to calculate the effective dose equivalent to the maximally exposed individual from NNSS air emissions. CAP88-PC was also used to calculate the population dose, or the collective EDE (expressed as person-rem [roentgen equivalent man] per year [person-rem/y]) for all individuals combined who reside within 80 kilometers (km) of NNSS emission sources. In 2020, the potential dose from radiological emissions to air from both current and past NNSS activities was well below the 10 mrem/y dose limit. This is demonstrated by both the air sampling data collected at critical receptor air monitoring stations and CAP88-PC modeling. The average concentrations of radioactivity at air critical receptor stations ranged from 0.2% to a maximum of 4.2% of the allowed NESHAP limit. CAP88-PC modeling of all 2020 NNSS radionuclide emissions showed the maximally exposed individual to be in Amargosa Valley and this individual received a potential dose of 0.063 mrem/y. The collective dose was calculated to be 0.29 person-rem/year for the 521,300 people who lived within 80 km of NNSS emission sources.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Procedures and Acceptance Criteria for in-situ Structural Materials Surveillance for MSR

This report describes the initial development of the technical basis for a materials surveillance technology that, when fully developed and validated, can be used by stakeholders to develop and implement a materials surveillance program to manage materials degradation during reactor operations. The procedures described in this report aim to bound the detrimental effects of the reactor environment on the creep-fatigue life of the reactor components through materials surveillance. Specifically, the report describes procedures for selecting critical locations within the reactor components for surrogate materials surveillance and the sizing and placements of passively-actuated materials surveillance test articles under development by the US Department of Energy, Advanced Reactor Technologies Program. These test articles apply cyclic thermomechanical load to a surrogate sample of the component structural material passively through thermal expansion mismatch within the articles, without requiring any penetrations in the reactor coolant boundary. The procedures can be used to size materials surveillance test articles so that they will fail before the corresponding structural component. These articles would be exposed to the component operating environment, located to experience a bounding radiation fluence and representative coolant exposure. They can be monitored during reactor operations to ensure that they have not failed under the combination of creep-fatigue damage and environmental degradation. The report describes the key technical decisions and the corresponding rational for using these procedures to provide advanced warning of any impending material failure. An appendix describes the technical basis and the procedure for sizing a family of passively-actuated test articles. Finally, the report describes future work needed to complete the technical basis underlying this materials surveillance technology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Incorporation of Thermal Hydraulic Models for Thermal Power Dispatch into a PWR Power Plant Simulator

This report describes the development, modeling, and results of a generic pressurized water reactor power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process located approximately one kilometer from the nuclear power plant. The simulator is a commercial PWR simulator that has been modified to include thermal power dispatch as described in past milestone reports [ , ]. The commercial PWR simulator is a generic simulator available from GSE SYSTEMS® (Sykesville, MD, USA) that is built using RELAP5-HDTM Real-Time Solution and in-house software developed by GSE Systems. This generic PWR (GPWR) simulator performs real-time simulation of the complete power plant from the reactor neutronics to the electricity generation and distribution. All primary, secondary, and auxiliary systems are modeled including all control logic in order to provide the most accurate representation of actual nuclear power plant (NPP) operation, and the simulator results have been rigorously verified by an actual NPP operating at approximately 1 GWe. This report is a continuation of worked performed in previous years, and supplemental information from previous reports is included in the appendix for reference.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

All Hands On Deck: Raising the Bar on Whole Building Performance-Based Code Compliance and Above-Code Programs

In 2019 a large-scale national effort was launched with support from U.S. Department of Energy, Pacific Northwest National Laboratory and Northwest Energy Efficiency Alliance (NEEA). The project aimed to develop a long-term vision and a roadmap for achieving a practical application of whole building performance-based code and above code program compliance in commercial buildings. The work was aided by engaging over 70 stakeholders across the country representing jurisdictions, above-code programs such as LEED and ENERGY STAR Multifamily Program, members of the ASHRAE Standard 90.1 and other Standard committees, IBPSA and software developers. The performance path requires whole building energy modeling and is gaining momentum. Many see it as the future of the commercial energy codes and the main pathway for achieving zero energy buildings. The paper describes the findings from a stakeholder survey funded by NEEA on the current state of performance-based path, its market penetration, trends, implementation practices and adoption challenges. It discusses the patterns revealed by experience of the states with decades-long history of performance-based compliance such as Florida and California and opportunities for taking advantage of the synergies between code and above-code programs. In addition, the paper provides an overview of the tools and resources developed as part of the effort including the compliance form for ASHRAE Standard 90.1 Section 11 and Appendix G, modeling submittal review manual, and modeler and reviewer qualification requirements. The tools and resources would help remove market barriers, deliver immediate benefits to jurisdictions and rating authorities, and achieve energy efficiency through whole-building performance path.

TSPR, Performance Based Complinace, Washington Sta↗

Initial ASME code rule analysis on Simple and Full assessment

ASME & ASTM codes present simple and full assessment methodologies to qualify nuclear grade graphite components. This report explains the theory behind the statistical portion of the codes and describes the issues discussed in a 2020 workshop in the simple assessment, as well as the full assessment. The methodology for the full assessment was developed by Hindley []. He used a validation methodology to match the experimental average failure load of test specimens from several geometries to the calculated 50% POF load to tune the grouping criteria parameters based on an RMSE penalty function. The grouping criteria consists of a minimum volume to satisfy the weakest link theory of the Weibull distribution and a minimum stress range parameter. Hindley’s work found a minimum link volume of 10 times the grain size and a stress range parameter of 7% [satisfy the validation requirements. Several studies found that the link volume of 10 times the grain size was not satisfactory for the volume grouping criteria for graphite grades with fine grains. ASME 2021 code adopted a new volume grouping criteria based on fracture toughness for calculation of the process zone volume. However, errors were found in the ASME 2021 code process zone volume equation and the question is now open as to what volume grouping criteria is satisfactory. This report presents results from sensitivity studies that were done to evaluate the volume grouping criteria effect on the full assessment POF. This report also presents results from sensitivity studies on other aspects of the code that affect the POF, the mesh size and the choice of the Weibull threshold parameter. All three sensitivity studies: the volume grouping criteria, the mesh size, and the threshold parameter choice are found to affect the component qualification decision for components of structural reliability class 1 (SRC-1). The sensitivity analysis results are presented in the body of the report for NBG-18, which is the same grade of graphite as Hindley used in his thesis. Results from NBG-17, IG-110, 2114, and PCEA are presented in the Appendix. For NBG-18, it was found that increasing the threshold increases the POF, finer meshes result in higher POFs, and that smaller link volume requirements lead to higher POFs (which is inconsistent with Hindley’s findings). This report proposes a new validation study similar to Hindley’s []. The purpose of the new validation study is to tune the threshold, mesh size and grouping criteria based on results from multiple grades of graphite, including finer grain graphites T220 (1-3 microns) and NG-CT-50 (5 microns). The test specimens will be broken at 3 labs, such that we can measure between lab measurement variability, with at least 5 test specimens per lab such that the within lab uncertainty can also be measured. Hindley’s validation method tried matching the average experimental load with the median. The future study will attempt to match failures at lower percentiles, which would be closer to the SRC POF limit. We are currently looking into what geometries make sense and the best method to measure multi-axial stress states. These design decisions are still being set.

36 MATERIALS SCIENCE↗

Initial Development of Variable Design Lifetimes and Creep-Fatigue Evaluations for ASME Section III, Division 5, Class B Code Rules

This report summarizes the initial development of new ASME Section III, Division 5, Class B rules to address the gaps identified for new high temperature reactor designs. The overall objective is to introduce the design-by-analysis approach, the variable design lifetimes for primary load design, and the strain limits and creep-fatigue damage evaluations for Class B components. It is also desired that the new evaluation procedures do not require stress classification and stress linearization. Further, the data requirements to support the development of design parameters for the new Class B rules would not be overly burdensome, and less extensive than those supporting Class A rules. We have identified the Elastic, Perfectly Plastic (EPP) method as the design by-analysis approach for primary load design, and developed allowable stress criteria for variable design lifetimes, up to 500,000 hours, that only require data typical for the allowable stresses in Section II, Part D, Tables 1A and 1B. We have also adapted the elastic analysis approach from HBB-T-1400 and Section III, Mandatory Appendix XIII, XIII-2400 and XIII-3520(e) for the new Class B creep-fatigue evaluation procedure. A new elastic follow-up-based Isochronous Stress Strain Curve (ISSC) stress relaxation procedure has been developed to provide adequate conservatism commensurate with Class B constructions. No stress classification and stress linearization are required in the new procedure. Future work needed to complete the development is also summarized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASME Section III, Division 5, High Temperature Reactors

Section III, Division 5 stands ready to support near-term deployment of advanced reactors. Progress on improving design rules, extending design lifetimes, adding more materials, and adding advanced component fabrication methods. Lessons-learned from Alloy 617 Code Case effort have streamlined the balloting workflow for Class A material code cases. After requester submitted material design parameters and supporting data package to ASME, Division 5 could turn around a material code case in about three Code Week cycles (less than a year). Data requirements for new materials are described in Division 5, “Nonmandatory Appendix HBB-Y, Guidelines For Design Data Needs For New Materials”.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CyTRICS Impact-Based Prioritization Process

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS prioritization process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS prioritization process was premised largely upon the impact which could result to an energy sector industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. CyTRICS has termed this process the “CyTRICS Impact-based Prioritization Process.” This paper describes the factors identified for use in the Impact-based Prioritization process and identifies the rationale for inclusion. During development, three National Laboratories piloted this prioritization process and generated prioritization scores for seven systems. Following the piloting of the process, laboratory subject matter experts (SME) validated that the numerical scores generated by the prioritization process were consistent with their knowledge of the impact that may occur should any of these systems be disrupted. The following document explains how to perform the prioritization process to generate prioritization scores for energy sector systems. After outlining assumptions required to conduct the process, it describes how to identify and elicit data which can be leveraged to evaluate a system and assign numerical values for each factor. The prioritization process uses different weights on different factors; rationale for each weight is included within the paper. Additionally, the paper includes some recommendations for future enhancements to prioritization, including lessons learned from developing and piloting the process. Finally, a comprehensive appendix includes example documents to be leveraged by those looking to execute the prioritization process.

99 GENERAL AND MISCELLANEOUS↗

ADRIANA project: Identification of research infrastructures for the SFR, within the frame of European industrial initiative for sustainable nuclear fission

Fast neutron reactors have a large potential as sustainable energy source. In particular, Sodium Fast Reactors (SFR) with a closed fuel cycle and potential for minor actinide burning may allow minimization of volume and heat load of high level waste and provide improved use of natural resources (as compared to only 1% energy recovery in the current once-through fuel cycle, with Thermal Reactors, such as EPR). The coordinating action ADRIANA (Advanced Reactor Initiative And Network Arrangement) has been initiated to set up a network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The Project sets these objectives for the following reactor systems and related technologies: Sodium Fast Reactor (SFR), Lead Fast Reactor (LFR), Gas Fast Reactor (GFR, including very high temperature technologies), Instrumentation, diagnostics and experimental devices, Irradiation facilities and hot laboratories, Zero power reactors. Among the fast reactor systems, the sodium cooled reactor has the most comprehensive technological basis as result of the experience gained from worldwide operation of several experimental, prototype and commercial size reactors, since the forties (see Appendix I). This concept is currently considered as the reference, within the European strategy. Innovations are needed to further enhance safety, reduce capital cost and improve efficiency reliability and operability, making the Generation IV SFR an attractive option for electricity production. Currently, in France, a moderate (500 to 600 MWe) power demonstrator named ASTRID (Advanced Sodium Test Reactor for Industrial Demonstration) has been proposed and endorsed by EU. Presently, the reference configuration is a pool concept. General R and D needs have been identified and experimental facilities required to satisfy these needs have been listed for the following domains: material and coolant, thermal-hydraulics and safety, severe accidents, systems and components validation, instrumentation and Education and Training. Then, the contributors have detailed the different types of experimental facilities, existing as well as lacking facilities. A ranking procedure of the facilities has been carried out, then a list of priorities and a road-map for investment has been established. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of BWR OPRM plant data and detection algorithms with DSSPP

All U.S. BWRs are required to have licensed stability solutions that satisfy General Design Criteria (GDC) 10 and 12 of 10 CFR 50 Appendix A. Implemented solutions are either detect and suppress or preventive in nature. Detection and suppression of power oscillations is accomplished by specialized hardware and software such as the Oscillation Power Range Monitor (OPRM) utilized in Option III and Detect and Suppress Solution - Confirmation Density (DSS-CD) stability Long-Term Solutions (LTSs). The detection algorithms are designed to recognize a Thermal-Hydraulic Instability (THI) event and initiate control rod insertion before the power oscillations increase much higher above the noise level that may threaten the fuel integrity. Option III is the most widely used long-term stability solution in the US and has more than 200 reactor years of operational history. DSS-CD represents an evolutionary step from the stability LTS Option III and its licensed domain envelopes the Maximum Extended Load Line Limit Analysis Plus (MELLLA +) domain. In order to enhance the capability to investigate the sensitivity of key parameters of stability detection algorithms, GEH has developed a new engineering analysis code, namely DSSPP (Detect and Suppress Solution Post Processor), which is introduced in this paper. The DSSPP analysis tool represents a major advancement in the method for diagnosing the design of stability detection algorithms that enables designers to perform parametric studies of the key parameters relevant for THI events and to fine tune these system parameters such that a potential spurious scram might be avoided. Demonstrations of DSSPPs application are also presented in this paper utilizing actual plant THI data. A BWR/6 plant had a plant transient that included unplanned recirculation pump transfer from fast to slow speed resulting in about 100% to {approx}40% rated power decrease and about 99% to {approx}30% rated core flow decrease. As the feedwater temperature is reduced to equilibrium conditions, the power increased from about {approx}40% to about {approx}60% with little change inflow. A THI event developed and subsequently, an OPRM initiated scram occurred with Option III. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP WAC Equivalence Support Measurements for Low-Level Sludge Waste at Los Alamos National Laboratory - 12242

Los Alamos National Laboratory (LANL) uses the Nevada National Security Site (NNSS) as an off-site disposal facility for low-level waste (LLW), including sludge waste. NNSS has issued a position paper that indicates that systems that are not certified by the Carlsbad Field Office (CBFO) for Waste Isolation Pilot Plant (WIPP) disposal of Transuranic (TRU) waste must demonstrate equivalent practices to the CBFO certified systems in order to assign activity concentration values to assayed items without adding in the Total Measurement Uncertainty (TMU) when certifying waste for NNSS disposal. Efforts have been made to meet NNSS requirements to accept sludge waste for disposal at their facility. The LANL LLW Characterization Team uses portable high purity germanium (HPGe) detector systems for the nondestructive assay (NDA) of both debris and sludge LLW. A number of performance studies have been conducted historically by LANL to support the efficacy and quality of assay results generated by the LANL HPGe systems, and, while these detector systems are supported by these performance studies and used with LANL approved procedures and processes, they are not certified by CBFO for TRU waste disposal. Beginning in 2009, the LANL LLW Characterization Team undertook additional NDA measurements of both debris and sludge simulated waste containers to supplement existing studies and procedures to demonstrate full compliance with the NNSS position paper. Where possible, Performance Demonstration Project (PDP) drums were used for the waste matrix and PDP sources were used for the radioactive sources. Sludge drums are an example of a matrix with a uniform distribution of contaminants. When attempting to perform a gamma assay of a sludge drum, it is very important to adequately simulate this uniform distribution of radionuclides in order to accurately model the assay results. This was accomplished by using a spiral radial source tube placement in a sludge drum rather than the standard three source tubes seen in debris PDP drums. Available line sources (Eu-152) were placed in the spiral tubes to further accomplish the desired uniform distribution of radionuclides. The standard PDP drum (PDP matrix drum 005) and PDP sources were used to determine the lower limits of detection (LLD) and TMU. Analysis results for the sludge drum matrix case for two HPGe detectors were tabulated and evaluated. NNSS has accepted the methodology and results of the measurements towards demonstrating equivalence to CBFO certified systems. In conclusion, the WES-WGS and CMR-OPS gamma spectroscopy teams at LANL have defined and performed measurements that serve to establish and demonstrate equivalency with the processes used by CBFO certified NDA systems. The supplemental measurements address four key areas in Appendix A of DOE/WIPP-02-3122: Annual Calibration Confirmation and Performance Check measurements; LLD determination; and TMU definition. For these measurements the containers, matrices and activity loadings are selected to represent items being assayed in real LLW cases. The LLD and the TMU bounding measurements are to be performed one time and will not be required to be repeated in future campaigns. The annual calibration and performance check measurements were performed initially and planned to repeat in annual campaigns in order to maintain NNSS certification. PDP sources and a PDP sludge drum as well as Eu-152 line sources and a spiral sludge drum were used for the measurements. In all cases, the results for accuracy and precision (%R and %RSD, respectively) were within allowable ranges as defined by the WIPP PDP program. LLD (or MDC) results were established for all the ten WIPP reportable radionuclides and U-235, and the MDC for Pu-239 was established in all cases to be well under 100 nCi/g. Useful results for reducing estimated uncertainties were established and an interesting unexpected case of high bias was observed and will be applied toward this end. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗