Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Cassini Titan Science Integration: Getting a 'Jumpstart' on the Process

The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.

Steadman, Kimberly B.↗

Closed Loop Requirements and Analysis Management

Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.

Lamoreaux, Michael↗

Parameter Impact on Sharing Studies Between UAS CNPC Satellite Transmitters and Terrestrial Systems

In order to provide a control and non-payload communication (CNPC) link for civil-use unmanned aircraft systems (UAS) when operating in beyond-line-of-sight (BLOS) conditions, satellite communication links are generally required. The International Civil Aviation Organization (ICAO) has determined that the CNPC link must operate over protected aviation safety spectrum allocations. Although a suitable allocation exists in the 5030-5091 MHz band, no satellites provide operations in this band and none are currently planned. In order to avoid a very lengthy delay in the deployment of UAS in BLOS conditions, it has been proposed to use existing satellites operating in the Fixed Satellite Service (FSS), of which many operate in several spectrum bands. Regulatory actions by the International Telecommunications Union (ITU) are needed to enable such a use on an international basis, and indeed Agenda Item (AI) 1.5 for the 2015 World Radiocommunication Conference (WRC) was established to decide on the enactment of possible regulatory provisions. As part of the preparation for AI 1.5, studies on the sharing FSS bands between existing services and CNPC for UAS are being contributed by NASA and others. These studies evaluate the potential impact of satellite CNPC transmitters operating from UAS on other in-band services, and on the potential impact of other in-band services on satellite CNPC receivers operating on UAS platforms. Such studies are made more complex by the inclusion of what are essentially moving FSS earth stations, compared to typical sharing studies between fixed elements. Hence, the process of determining the appropriate technical parameters for the studies meets with difficulty. In order to enable a sharing study to be completed in a less-than-infinite amount of time, the number of parameters exercised must be greatly limited. Therefore, understanding the impact of various parameter choices is accomplished through selectivity analyses. In the case of sharing studies for AI 1.5, identification of worst-case parameters allows the studies to be focused on worst-case scenarios with assurance that other parameter combinations will yield comparatively better results and therefore do not need to be fully analyzed. In this paper, the results of such sensitivity analyses are presented for the case of sharing between UAS CNPC satellite transmitters and terrestrial receivers using the Fixed Service (FS) operating in the same bands, and the implications of these analyses on sharing study results.

air traffic control↗

Soil Moisture Active Passive (SMAP) Microwave Radiometer Radio-Frequency Interference (RFI) Mitigation: Initial On-Orbit Results

The Soil Moisture Active Passive (SMAP) mission, launched in January 2015, provides global measurements of soil moisture using a microwave radiometer. SMAPs radiometer passband lies within the passive frequency allocation. However, both unauthorized in-band transmitters as well as out-of-band emissions from transmitters operating at frequencies adjacent to this allocated spectrum have been documented as sources of radio frequency interference (RFI) to the L-band radiometers on SMOS and Aquarius. The spectral environment consists of high RFI levels as well as significant occurrences of low level RFI equivalent to 0.1 to 10 K. The SMAP ground processor reports the antenna temperature both before and after RFI mitigation is applied. The difference between these quantities represents the detected RFI level. The presentation will review the SMAP RFI detection and mitigation procedure and discuss early on-orbit RFI measurements from the SMAP radiometer. Assessments of global RFI properties and source types will be provided, as well as the implications of these results for SMAP soil moisture measurements.

radiometers↗

Preserving the Science Legacy from the Apollo Missions to the Moon

Six Apollo missions landed on the Moon from 1969-72, returning to Earth 382 kg of lunar rock, soil, and core samples-among the best documented and preserved samples on Earth that have supported a robust research program for 45 years. From mission planning through sample collection, preliminary examination, and subsequent research, strict protocols and procedures are followed for handling and allocating Apollo subsamples. Even today, 100s of samples are allocated for research each year, building on the science foundation laid down by the early Apollo sample studies and combining new data from today's instrumentation, lunar remote sensing missions and lunar meteorites. Today's research includes advances in our understanding of lunar volatiles, lunar formation and evolution, and the origin of evolved lunar lithologies. Much sample information is available to researchers at curator.jsc.nasa.gov. Decades of analyses on lunar samples are published in LPSC proceedings volumes and other peer-reviewed journals, and tabulated in lunar sample compendia entries. However, for much of the 1969-1995 period, the processing documentation, individual and consortia analyses, and unpublished results exist only in analog forms or primitive digital formats that are either inaccessible or at risk of being lost forever because critical data from early investigators remain unpublished. We have initiated several new efforts to rescue some of the early Apollo data, including unpublished analytical data. We are scanning NASA documentation that is related to the Apollo missions and sample processing, and we are collaborating with IEDA to establish a geochemical database called Moon DB. To populate this database, we are working with prominent lunar PIs to organize and transcribe years of both published and unpublished data. Other initiatives include micro-CT scanning of complex lunar samples to document their interior structure (e.g. clasts, vesicles); linking high-resolution scans of Apollo film products to samples; and new procedures for systematic high resolution photography of samples before additional processing, enabling detailed 3D reconstructions of the samples. All of these efforts will provide comprehensive access to Apollo samples and support better curation of the samples for decades to come.

Evans, Cindy↗

Rescue and Preservation of Sample Data from the Apollo Missions to the Moon

Six Apollo missions landed on the Moon from 1969-72, returning to Earth 382 kg of lunar rock, soil, and core samples. These samples are among the best documented and preserved samples on Earth that have supported a robust research program for 45 years. From mission planning through sample collection, preliminary examination, and subsequent research, strict protocols and procedures are followed for handling and allocating Apollo subsamples, resulting in the production of vast amounts of documentation. Even today, hundreds of samples are allocated for research each year, building on the science foundation laid down by the early Apollo sample studies and combining new data from today's instrumentation, lunar remote sensing missions and lunar meteorites. Much sample information is available to researchers at curator.jsc.nasa.gov. Decades of analyses on lunar samples are published in LPSC proceedings volumes and other peer-reviewed journals, and tabulated in lunar sample compendia entries. However, for much of the 1969-1995 period, the processing documentation, individual and consortia analyses, and unpublished results exist only in analog forms or primitive digital formats that are either inaccessible or at risk of being lost forever because critical data from early investigators remain unpublished.

Todd, Nancy S.↗

The Cassini Solstice Mission: Streamlining Operations by Sequencing with PIEs

The Cassini Solstice Mission (CSM) is the second extended mission phase of the highly successful Cassini/Huygens mission to Saturn. Conducted at a much-reduced funding level, operations for the CSM have been streamlined and simplified significantly. Integration of the science timeline, which involves allocating observation time in a balanced manner to each of the five different science disciplines (with representatives from the twelve different science instruments), has long been a labor-intensive endeavor. Lessons learned from the prime mission (2004-2008) and first extended mission (Equinox mission, 2008-2010) were utilized to design a new process involving PIEs (Pre-Integrated Events) to ensure the highest priority observations for each discipline could be accomplished despite reduced work force and overall simplification of processes. Discipline-level PIE lists were managed by the Science Planning team and graphically mapped to aid timeline deconfliction meetings prior to assigning discrete segments of time to the various disciplines. Periapse segments are generally discipline-focused, with the exception of a handful of PIEs. In addition to all PIEs being documented in a spreadsheet, allocated out-of-discipline PIEs were entered into the Cassini Information Management System (CIMS) well in advance of timeline integration. The disciplines were then free to work the rest of the timeline internally, without the need for frequent interaction, debate, and negotiation with representatives from other disciplines. As a result, the number of integration meetings has been cut back extensively, freeing up workforce. The sequence implementation process was streamlined as well, combining two previous processes (and teams) into one. The new Sequence Implementation Process (SIP) schedules 22 weeks to build each 10-week-long sequence, and only 3 sequence processes overlap. This differs significantly from prime mission during which 5-week-long sequences were built in 24 weeks, with 6 overlapping processes.

Vandermey, Nancy↗

UAS CNPC Satellite Link Performance - Sharing Spectrum with Terrestrial Systems

In order to provide for the safe integration of unmanned aircraft systems into the National Airspace System, the control and non-payload communications (CNPC) link connecting the ground-based pilot with the unmanned aircraft must be highly reliable. A specific requirement is that it must operate using aviation safety radiofrequency spectrum. The 2012 World Radiocommunication Conference (WRC-12) provided a potentially suitable allocation for radio line-of-sight (LOS), terrestrial based CNPC link at 5030-5091 MHz. For a beyond radio line-of-sight (BLOS), satellite-based CNPC link, aviation safety spectrum allocations are currently inadequate. Therefore, the 2015 WRC will consider the use of Fixed Satellite Service (FSS) bands to provide BLOS CNPC under Agenda Item 1.5. This agenda item requires studies to be conducted to allow for the consideration of how unmanned aircraft can employ FSS for BLOS CNPC while maintaining existing systems. Since there are terrestrial Fixed Service systems also using the same frequency bands under consideration in Agenda Item 1.5 one of the studies required considered spectrum sharing between earth stations on-board unmanned aircraft and Fixed Service station receivers. Studies carried out by NASA have concluded that such sharing is possible under parameters previously established by the International Telecommunications Union. As the preparation for WRC-15 has progressed, additional study parameters Agenda Item 1.5 have been proposed, and some studies using these parameters have been added. This paper examines the study results for the original parameters as well as results considering some of the more recently proposed parameters to provide insight into the complicated process of resolving WRC-15 Agenda Item 1.5 and achieving a solution for BLOS CNPC for unmanned aircraft.

Pilotless aircraft↗

Analysis of Terrestrial Interference Protection from UAS CNPC Satellite Transmitters

Unmanned aircraft (UA) are projected to have a major impact on future aviation. Larger UA operating at altitudes above 3000 feet will require at least occasional access to non-segregated, that is, controlled airspace. In order for unmanned aircraft to be integrated into the airspace and operate with other commercial aircraft, a very reliable command and control (a. k. a. control and non-payload communications, (CNPC)) link is required. For operations covering large distances or over remote locations, a beyond-line-of-sight (BLOS) CNPC link implemented through a satellite will almost always be required. Protected aviation spectrum (aeronautical mobile satellite (route) service, or AMS(R)S) would normally be used for such a safety-critical link, however studies have shown that currently available aviation safety satellite spectrum is inadequate to support the projected BLOS CNPC link bandwidth requirements. To address this inadequacy, the 2015 World Radio communication Conference studied the possible use of the Fixed Satellite Service (FSS) to provide CNPC, including possible allocations in Ku-Band and Ka-Band, under Agenda Item (AI) 1.5. Although UA CNPC satellite links in these bands were shown to meet operational availability and continuity requirements, a serious complication exists in that there are also terrestrial service allocations in these bands, in particular, Fixed Service (FS) point-to-point and point-to-multipoint microwave digital links. During the WRC-15 study cycle, much opposition to AI 1.5 was generated based on fears that UA CNPC satellite transmitters in these bands would impose unacceptable levels of interference to the FS receivers. NASA analyzed the possible interference from the UA transmitters based on probable UA transmission and FS receiver characteristics, and UA traffic distributions and densities to determine conditions under which UA could operate without imposing unacceptable interference levels to the FS. Ultimately, UA power flux density transmission limits were proposed as a way to insure protection of FS receivers and further studies were prepared on the various proposals. This paper presents the results of these studies and discusses possible implications on future UA BLOS operations.

aircraft communications↗

Outcomes of the 2015 World Radiocommunication Conference for Aeronautical Spectrum and Applications

At the conclusion of a nearly four year study cycle following the closing of the 2012 World Radiocommunication Conference (WRC-12), the 2015 WRC in November of 2015 considered a number of agenda items and issues relevant to systems and spectrum allocations supporting communications, navigation and surveillance for the operation of civil aviation. Among a number of WRC-15 agenda items and issues, the key agenda items affecting civil aviation included: unmanned aircraft systems use of the Fixed Satellite Service for command and control communications; global flight tracking; new allocations to International Mobile Telecommunications (IMT); and protection of the Fixed Satellite Service to support safe operation of aircraft. A number of other agenda items affecting or potentially affecting civil aviation were also addressed by WRC-15. In this paper we describe the outcomes of WRC-15 for these civil aeronautical-relevant issues. We then outline the civil aviation-related agenda items and issues that will be considered at the upcoming 2019 WRC.

air traffic control↗

Integrating Communication and Navigation: Next Generation Broadcast Service (NGBS)

NASA Goddard has been investing in technology demonstrations of a beacon service, now called Next Generation Broadcast Services (NGBS). NGBS is a global, space-based, communications and navigation service for users of Global Navigation Satellite Systems (GNSS) and the Tracking and Data Relay Satellite System (TDRSS). NGBS will provide an S-band beacon messaging source and radio navigation available to users at orbital altitudes 1400 km and below, increasing the autonomy and resiliency of onboard communication and navigation. NGBS will deliver both one-way radiometric (Doppler and pseudorange) and fast forward data transport services to users. Portions of the overall forward data volume will be allocated for fixed message types while the remaining data volume will be left for user forward command data. The NGBS signal will reside within the 2106.43 MHz spectrum currently allocated for the Space Networks multiple access forward (MAF) service and a live service demonstration is currently being planned via the 2nd and 3rd generation TDRS satellites.

Navigation↗

Micropulsed Plasma Thrusters for Attitude Control of a Low-Earth-Orbiting CubeSat

This study presents a 3-Unit CubeSat design with commercial-off-the-shelf hardware, Teflon-fueled micropulsed plasma thrusters, and an attitude determination and control approach. The micropulsed plasma thruster is sized by the impulse bit and pulse frequency required for continuous compensation of expected maximum disturbance torques at altitudes between 400 and 1000 km, as well as to perform stabilization of up to 20 deg /s and slew maneuvers of up to 180 deg. The study involves realistic power constraints anticipated on the 3-Unit CubeSat. Attitude estimation is implemented using the q method for static attitude determination of the quaternion using pairs of the spacecraft-sun and magnetic-field vectors. The quaternion estimate and the gyroscope measurements are used with an extended Kalman filter to obtain the attitude estimates. Proportional-derivative control algorithms use the static attitude estimates in order to calculate the torque required to compensate for the disturbance torques and to achieve specified stabilization and slewing maneuvers or combinations. The controller includes a thruster-allocation method, which determines the optimal utilization of the available thrusters and introduces redundancy in case of failure. Simulation results are presented for a 3-Unit CubeSat under detumbling, pointing, and pointing and spinning scenarios, as well as comparisons between the thruster-allocation and the paired-firing methods under thruster failure.

Gatsonis, Nikolaos A.↗

Spaceport Command and Control System Software Development

During the course of this internship, software was developed to ensure the efficient management and allocation of an employee to an area of their expertise or experience that may otherwise have gone unnoticed. This directly affects any future missions prescribed to the SLS by allowing management to easily see where employees can be re-allocated to different mission specific projects or assist a project that may be lacking in a specific field. This software is intended to provide proof of NASA's diligence and deliberation in hiring new employees and in providing training and guidance to employees who may have fallen short of expectations. Allowing management to more easily statistically track and monitor the supply and demand of employees with specific experience will help introduce a beneficial culture where employees are given the ability to grow and hone skills which might otherwise atrophy over time. With this new system in place, NASA can prove the employees they hire and already have are exemplary and will remain exemplary to serve the nation as a whole.

Kessluk, Jonathan↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Human-Automation Cooperation for Separation Assurance in Future NextGen Environments

A 2012 Human-In-The-Loop air traffic control simulation investigated a gradual paradigm-shift in the allocation of functions between operators and automation. Air traffic controllers staffed five adjacent high-altitude en route sectors, and during the course of a two-week experiment, worked traffic under different function-allocation approaches aligned with four increasingly mature NextGen operational environments. These NextGen time-frames ranged from near current-day operations to nearly fully-automated control, in which the ground systems automation was responsible for detecting conflicts, issuing strategic and tactical resolutions, and alerting the controller to exceptional circumstances. Results indicate that overall performance was best in the most automated NextGen environment. Safe operations were achieved in this environment for twice todays peak airspace capacity, while being rated by the controllers as highly acceptable. However, results show that sector operations were not always safe; separation violations did in fact occur. This paper will describe in detail the simulation conducted, as well discuss important results and their implications.

air traffic control↗

The Radio Frequency Environment at 240-270 MHz with Application to Signal-of-Opportunity Remote Sensing

Low frequency observations are desired for soil moisture and biomass remote sensing. Long wavelengths are needed to penetrate vegetation and Earths land surface. In addition to the technical challenges of developing Earth observing spaceflight instruments operating at low frequencies, the radio frequency spectrum allocated to remote sensing is limited. Signal-of-opportunity remote sensing offers the chance to use existing signals exploiting their allocated spectrum to make Earth science measurements. We have made observations of the radio frequency environment around 240-270 MHz and discuss properties of desired and undesired signals.

Soil Moisture↗

Multi-Objective Reinforcement Learning-Based Deep Neural Networks for Cognitive Space Communications

Future communication subsystems of space exploration missions can potentially benefit from software-defined radios (SDRs) controlled by machine learning algorithms. In this paper, we propose a novel hybrid radio resource allocation management control algorithm that integrates multi-objective reinforcement learning and deep artificial neural networks. The objective is to efficiently manage communications system resources by monitoring performance functions with common dependent variables that result in conflicting goals. The uncertainty in the performance of thousands of different possible combinations of radio parameters makes the trade-off between exploration and exploitation in reinforcement learning (RL) much more challenging for future critical space-based missions. Thus, the system should spend as little time as possible on exploring actions, and whenever it explores an action, it should perform at acceptable levels most of the time. The proposed approach enables on-line learning by interactions with the environment and restricts poor resource allocation performance through virtual environment exploration. Improvements in the multiobjective performance can be achieved via transmitter parameter adaptation on a packet-basis, with poorly predicted performance promptly resulting in rejected decisions. Simulations presented in this work considered the DVB-S2 standard adaptive transmitter parameters and additional ones expected to be present in future adaptive radio systems. Performance results are provided by analysis of the proposed hybrid algorithm when operating across a satellite communication channel from Earth to GEO orbit during clear sky conditions. The proposed approach constitutes part of the core cognitive engine proof-of-concept to be delivered to the NASA Glenn Research Center SCaN Testbed located onboard the International Space Station.

space archtiecture↗

Implementation of a Space Communications Cognitive Engine

Although communications-based cognitive engines have been proposed, very few have been implemented in a full system, especially in a space communications system. In this paper, we detail the implementation of a multi-objective reinforcement-learning algorithm and deep artificial neural networks for the use as a radio-resource-allocation controller. The modular software architecture presented encourages re-use and easy modification for trying different algorithms. Various trade studies involved with the system implementation and integration are discussed. These include the choice of software libraries that provide platform flexibility and promote reusability, choices regarding the deployment of this cognitive engine within a system architecture using the DVB-S2 standard and commercial hardware, and constraints placed on the cognitive engine caused by real-world radio constraints. The implemented radio-resource allocation-management controller was then integrated with the larger spaceground system developed by NASA Glenn Research Center (GRC).

reinforcement learning↗