Tritium accountancy in fusion systems

The US Department of Energy (DOE) has clearly defined requirements for nuclear material control and accountability (MCA) of tritium whereas the International Atomic Energy Agency (IAEA) does not since tritium is not a fissile material. MCA requirements are expected for tritium fusion machines and will be dictated by the host country or regulatory body where the machine is operated. Material Balance Areas (MBA) are defined to aid in the tracking and reporting of nuclear material movements and inventories. Material sub-accounts (MSA) are established along with key measurement points (KMP) to further subdivide a MBA to localize and minimize uncertainties in the inventory difference (ID) calculations for tritium accountancy. Fusion systems try to minimize tritium inventory which may require continuous movement of material through the MSA. The ability of making meaningful measurements of these material transfers is described in terms of establishing the MSA structure to perform and reconcile ID calculations. For fusion machines, changes to the traditional ID equation will be discussed which includes breeding, burn-up, and retention of tritium in the fusion device. The concept of 'net' tritium quantities consumed or lost in fusion devices is described in terms of inventory taking strategies and how it is used to track the accumulation of tritium in components or fusion machines. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Rapid depletion analysis of flowing-pebble reactor systems at equilibrium using SCALE

Several high-temperature gas-cooled reactor concepts (and more recently, salt-cooled designs such as the fluoride salt-cooled high-temperature reactor) feature core designs employing continuously circulating fuel pebbles. These reactor designs permit both continuous online refueling of fuel elements as well as higher overall achievable discharge burnups. However, rapid calculation of time-dependent fuel isotopic inventories proves challenging for this class of dynamic systems with current analysis tools. While iterative approaches employing coupled neutron transport have been developed to solve this issue, rapid depletion analysis techniques are needed to calculate time-dependent inventories for individual pebbles and batches (and thus the construction of full- core inventory at equilibrium). We propose a depletion analysis strategy for this type of system for cores at equilibrium. Drawing upon previous neutronic analysis of the PBMR-400 equilibrium core, we demonstrate the viability of developing collapsed one-group cross section libraries suitable for performing rapid depletion analyses with SCALE. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Update of the Nuclear Criticality Slide Rule Calculations: Plutonium systems – Delayed Fission Gamma

IRSN (France), LLNL (USA) and ORNL (USA) began a long-term collaboration effort in 2015 to update the nuclear criticality Slide Rule for the emergency response to a nuclear criticality accident. The Slide Rule permits the estimation of neutron and gamma dose rates and integrated doses based upon estimated fission yields, as a function of distance from the fission source, and time after criticality accidents for different critical systems. This paper presents results from the fourth phase of the current update of the Slide Rule project, in which delayed fission-product gamma (DFG) dose rates of unreflected plutonium critical systems were compared by several modern 3D radiation transport codes (MCNP, COG, SCALE), using updated flux-to-dose conversion factors. Dose rates are calculated for fissile material at five moderation ratios (H/Pu), at 1 m above the ground as a function of distance (between 30 cm and 1,200 m) from the external surface of the source to the center of the detector, and for periods between 1 s and 1,000 min after the critical instantaneous event. Further efforts have been devoted to the determination of the delayed gamma source, by comparing the time-dependent energy spectra obtained from several methods. Overall, DFG dose rates calculated by each participant led to consistent results. Extra effort is under way to identify the cause of the remaining differences, by comparing precisely the gamma source, and particularly nuclides inventories.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

An Implementation for Transforming a Home Energy Management System to a Multi-agent System

In the United States, 41% of produced energy is consumed by the building sector, i.e. residential and commercial buildings (Building Energy Data Book, Buildings Sector, US Department of Energy, Office of Energy Efficiency and Renewable Energy, Building Technologies Office, 2012. n.d.). The anticipation is that Home Energy Management Systems (HEMS) will support energy efficiency gains through control of the devices in an optimal fashion. New opportunities are offering the ability to integrate grid type controls and the most suitable way to perform these controls is through a multi-agent system (MAS). In this paper, approaches on supporting a HEMS and MAS integration are discussed.

Zandi, Helia↗

Fermilab PIP-II machine protection system digitized data noise elimination scheme and its FPGA implementation

In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress noise across these ranges—especially 60 Hz and its harmonics, which overlap with beam loss signal frequencies—advanced digital processing beyond standard filtering is required. Several real-time functional blocks were simulated and tested on an FPGA: (1) a dual time-constant discharging integrator filter, (2) a de-ripple baseline extraction and storage block, and (3) a fast-recovery discharging integrator. The nonlinear IIR integrator filter removes high-frequency noise and feeds into the baseline extractor. Upon detecting abrupt beam loss, it switches to a longer time constant to prevent baseline distortion. The de-ripple block calculates a valid baseline by averaging over multiple 60 Hz periods, storing results in a 4096-word FPGA RAM. This baseline is subtracted from raw data before integration by the fast-recovery block, which resets quickly after use. All blocks achieved expected performance and were successfully implemented on a low-cost FPGA.

Wu, Jinyuan [Fermilab]↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Improved Meteorological Input for Atmospheric Release Decision support Systems and an Integrated LES Modeling System for Atmospheric Dispersion of Toxic Agents: Homeland Security Applications

When hazardous material is accidently or intentionally released into the atmosphere, emergency response organizations look to decision support systems (DSSs) to translate contaminant information provided by atmospheric models into effective decisions to protect the public and emergency responders and to mitigate subsequent consequences. The Department of Homeland Security (DHS)-led Interagency Modeling and Atmospheric Assessment Center (IMAAC) is one of the primary DSSs utilized by emergency management organizations. IMAAC is responsible for providing 'a single piont for the coordination and dissemination of Federal dispersion modeling and hazard prediction products that represent the Federal position' during actual or potential incidents under the National Response Plan. The Department of Energy's (DOE) National Atmospheric Release Advisory Center (NARAC), locatec at the Lawrence Livermore National Laboratory (LLNL), serves as the primary operations center of the IMAAC. A key component of atmospheric release decision support systems is meteorological information - models and data of winds, turbulence, and other atmospheric boundary-layer parameters. The accuracy of contaminant predictions is strongly dependent on the quality of this information. Therefore, the effectiveness of DSSs can be enhanced by improving the meteorological options available to drive atmospheric transport and fate models. The overall goal of this project was to develop and evaluate new meteorological modeling capabilities for DSSs based on the use of NASA Earth-science data sets in order to enhance the atmospheric-hazard information provided to emergency managers and responders. The final report describes the LLNL contributions to this multi-institutional effort. LLNL developed an approach to utilize NCAR meteorological predictions using NASA MODIS data for the New York City (NYC) region and demonstrated the potential impact of the use of different data sources and data parameterizations on IMAAC/NARAC fate and transport predictions. A case study involving coastal sea breeze circulation patterns in the NYC region was used to investigate the sensitivity of atmospheric dispersion results on the source of three-dimensional wind field data.

54 ENVIRONMENTAL SCIENCES↗

Design Specification for Beam Containment System Ion Chamber Gas Systems

Ionization chambers are used at SLAC as protection devices near collimators, dumps and areas where beam loss must be limited through engineering controls. The two detector technologies considered in this note are Protection Ionization Chambers (PICs) and Long Ionization Chambers (LIONs). The ionization chambers are typically installed in redundant pairs and are set by introducing a controlled beam loss and using the measurements to determine a trip current setting. As such, the trip setting for any installation is specific to the system and is usually reestablished following any change in the system (change of gas, operating pressure, detector placement).

Accelerators↗

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

3rd Annual Earth System Grid Federation and 3rd Annual Earth System Grid Federation and Ultrascale Visualization Climate Data Analysis Tools Face-to-Face Meeting Report December 2013

The climate and weather data science community gathered December 3–5, 2013, at Lawrence Livermore National Laboratory, in Livermore, California, for the third annual Earth System Grid Federation (ESGF) and Ultra-scale Visualization Climate Data Analysis Tools (UV-CDAT) Face-to-Face (F2F) Meeting, which was hosted by the Department of Energy, National Aeronautics and Space Administration, National Oceanic and Atmospheric Administration, the European Infrastructure for the European Network of Earth System Modelling, and the Australian Department of Education. Both ESGF and UV-CDAT are global collaborations designed to develop a new generation of open-source software infrastructure that provides distributed access and analysis to observed and simulated data from the climate and weather communities. The tools and infrastructure developed under these international multi-agency collaborations are critical to understanding extreme weather conditions and long-term climate change, while the F2F meetings help to build a stronger climate and weather data science community and stronger federated software infrastructure. The 2013 F2F meeting determined requirements for existing and impending national and international community projects; enhancements needed for data distribution, analysis, and visualization infrastructure; and standards and resources needed for better collaborations.

54 ENVIRONMENTAL SCIENCES↗

System Study: Emergency Power System 1998–2012

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. A statistically significant increasing trend was identified for unreliability (8 hour model) as a function of fiscal year. No statistically significant decreasing trend was identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

HPC Colony II: FAST_OS II: Operating Systems and Runtime Systems at Extreme Scale

HPC Colony II has been a 36-month project focused on providing portable performance for leadership class machines—a task made difficult by the emerging variety of more complex computer architectures. The project attempts to move the burden of portable performance to adaptive system software, thereby allowing domain scientists to concentrate on their field rather than the fine details of a new leadership class machine. To accomplish our goals, we focused on adding intelligence into the system software stack. Our revised components include: new techniques to address OS jitter; new techniques to dynamically address load imbalances; new techniques to map resources according to architectural subtleties and application dynamic behavior; new techniques to dramatically improve the performance of checkpoint-restart; and new techniques to address membership service issues at scale.

97 MATHEMATICS AND COMPUTING↗

Baseline System Costs for 50.0 MW Enhanced Geothermal System -- A Function of: Working Fluid, Technology, and Location, Location, Location

Substantial unexploited opportunity exists for the US, and the world, in Enhanced Geothermal Systems (EGS). As a result of US DOE investment, new drilling technology, new power generation equipment and cycles enable meaningful power production, in a compact and modular fashion; at lower and lower top side EGS working fluid temperatures and in a broader range of geologies and geographies. This cost analysis effort supports the expansion of Enhanced Geothermal Systems (EGS), furthering DOE strategic themes of energy security and sub goal of energy diversity; reducing the Nation's dependence on foreign oil while improving the environment.

15 GEOTHERMAL ENERGY↗

Low-Cost HTS Based Magnet System with an Inductively Coupled Pulsed Energy Extraction Protection System

In this project, RadiaBeam Technologies was tasked with developing a novel solution for a cost effective quench protection based on fast expansion of the normal zone. By inductively coupling a strong electromagnetic pulse via a resonant LC circuit, we attempted to demonstrate accelerated normal zone propagation. The AC field induces currents in the superconducting layer with the current density exceeding that of the critical current density, J c . This creates a large normal zone, uniformly distributing the dissipation through the magnet body. The method does not rely on thermal heating of the conductor, thus enabling nearly instantaneous protection. Through the course of the Phase II project, RadiaBeam Technologies continued extensive numerical modeling of the inductive quench system, re-designed and built several iterations of the POC system for testing and observed evidence of a transient partial quench being induced. However the final device was not fabricated. This was a consequence of the fundamentally complex nature of the energy extraction process and the challenges associated even with demonstrating the proof of concept in a bench top device.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Milestone Report - Data Requirements and Test System Needs for Development of an Integrated Off-Gas Treatment System

In fiscal year 2016 an Engineering Evaluation of an integrated off-gas system was conducted. This study resulted in a report entitled Engineering Evaluation of an Integrated Off-Gas Treatment System for Used Nuclear Fuel Reprocessing Facilities (Jubin et al. 2016a), from here referred to as the “Engineering Evaluation.” This study focused on the capture and retention of the volatile radionuclides ( 3 H, 14 C, 85 Kr, and 129 I), selected semi-volatile radionuclides, specifically 106 Ru, and chemical species like NO and NO 2 generated during the dissolution of the used nuclear fuel. The study examined the design of the combined head-end off-gas streams and the vessel off-gas stream. The study drew upon the available literature to conduct the equipment sizing and sorbent usage. A number of assumptions were required to complete this analysis and major gaps in the available data were identified that, if resolved, could increase the fidelity of the engineering design.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗