Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Advanced Manufacturing Technologies (AMT): Additive Manufactured Hot Fire Planning and Testing in GRC Cell 32 Project

The objective of this project is to hot fire test an additively manufactured thrust chamber assembly TCA (injector and thrust chamber). GRC will install the additively manufactured Inconel 625 injector, two additively manufactured (SLM) water cooled Cu-Cr thrust chamber barrels and one additively manufactured (SLM) water cooled Cu-Cr thrust chamber nozzle on the test stand in Cell 32 and perform hot fire testing of the integrated TCA.

Fikes, John C.↗

Autonomous Navigation, Dynamic Path and Work Flow Planning in Multi-Agent Robotic Swarms Project

Kennedy Space Center has teamed up with the Biological Computation Lab at the University of New Mexico to create a swarm of small, low-cost, autonomous robots, called Swarmies, to be used as a ground-based research platform for in-situ resource utilization missions. The behavior of the robot swarm mimics the central-place foraging strategy of ants to find and collect resources in an unknown environment and return those resources to a central site.

Technology Portfolio System↗

The EGS Collab Project: Stimulation and Simulation

Development of Enhanced Geothermal Systems (EGS) requires accurate predictions of flow rates and temperatures at production wells over time. The concept of EGS is simple; however, complications from heterogeneity and complexity of fracture pathways may lead to channeling, short-circuiting, and premature thermal breakthrough. In the EGS Collab project, we are establishing a suite of highly monitored and well characterized intermediate-scale (~10-20 m) field test beds along with fracture stimulation and interwell flow tests to better understand processes that control formation of effective subsurface heat exchangers. EGS Collab experiments will provide a means of testing tools and concepts that could later be employed under geothermal reservoir conditions at FORGE or elsewhere. Key to the project is using numerical simulations in the experiment design and interpretation of results. Our tests will be well-controlled, in situ experiments focused on rock fracture behavior and permeability enhancement. Our pre- and post-test modeling results of each field experiment compared with detailed measurements will allow for improved model prediction and validation. We will use comprehensive instrumentation to collect high-quality and high-resolution geophysical and other fracture characterization and fluid flow data. We will analyze these data and compare them with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. We will also observe and quantify other key governing parameters that impact permeability, and will attempt to understand how these parameters might change throughout the development and operation of an EGS project with the ultimate goal of enabling commercial viability of EGS. Our first set of experiments will be performed at the Sanford Underground Research Facility (SURF) in South Dakota. Our team is well underway with building the first field experiment test bed planned for this project, which is supported by the US Department of Energy’s Geothermal Technologies Office.

EGS Collab↗

Psyche Science Planning with the Science Opportunity Analyzer

Psyche is a NASA Discovery mission intent on solving mysteries surrounding early planetary formation. The mission spacecraft will journey to (16) Psyche: a metallic asteroid believed to be the exposed core of an early planetesimal. Despite the unique nature of the target asteroid and the mission’s novel science goals, a significant portion of the project’s science planning needs may be met through the use of legacy tools. In particular, the adoption of the Jet Propulsion Laboratory’s (JPL) Science Opportunity Analyzer (SOA) promises to satisfy mission requirements with minimal development effort. Originally developed as a multi-mission science planning tool, SOA can design and visualize observations, perform geometric flight rule checking, model physical phenomena, and much more. The software has been used by the mission since its proposal phase and is expected to continue providing valuable capabilities throughout operations.

Elkins-Tanton, Linda T.↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

Cloud feedback studies with a physics grid

This project was funded by DOE in 2007 but work was initially delayed, first because a senior investigator on the original project (Stephen Thomas) took another position, and subsequently because the PI changed institutions, leaving UCLA in the summer of 2008 to join the MPI-M in Hamburg Germany. The project was moved to the MPI-M with the help of DOE staff, and after negotiating numerous logistical and administrative hurdles the project started in April 2010. Due to differences in funding the project funding was able to support roughly three person years, and our institution also agreed to supplement the support to fund the main postdoc for a third year. Due to the change of institutions, and considerable development in dynamical cores since the initiation of the project it was decided to work through the ideas using the new ICON dynamical core. The ICON dynamical core is based on a icosahedral grid and serves a prototype for dynamical cores that are being developed in a number of institutions, including at NCAR (the so called MPAS model) for a future version of the Community Earth System Model. The advantage of using ICON for these purposes is that the the ICON dynamical core is relatively stable, and is built on a hierarchical concept that naturally adapts itself to the proposed experimental strategy. Using ICON also allows the project to benefit from staff at the institute who have helped develop ICON, thus bring the main ideas more rapidly to fruition. However, because of the on-going development in the very core of the model and other issues related to pre and post processing, the project did not end in the expected manner. Although the plans in the proposed project has been achieved, to run the heterogeneous multiscale model at global scale requires very heavy computing resources which was not expected. We have found some encouraging results using the available resources on a smaller domain and we plan to investigate them further on a larger scale in near future.

54 ENVIRONMENTAL SCIENCES↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Electrochemical Membrane for Carbon Dioxide Separation and Power Generation

uelCell Energy, Inc. (FCE) has developed a novel system concept for separation of carbon dioxide (CO2) from greenhouse gas (GHG) emission sources using an electrochemical membrane (ECM). The salient feature of the ECM is its capability to produce electric power while capturing CO2 from flue gas, such as from an existing pulverized coal (PC) plant. Laboratory scale testing of the ECM has verified the feasibility of the technology for CO2 separation from simulated flue gases of PC plants as well as combined cycle power plants and other industrial facilities. Recently, FCE was awarded a contract (DE-FE0007634) from the U.S. Department of Energy to evaluate the use of ECM to efficiently and cost effectively separate CO2 from the emissions of existing coal fired power plants. The overarching objective of the project is to verify that the ECM can achieve at least 90% CO2 capture from flue gas of an existing PC plant with no more than 35% increase in the cost of electricity (COE) produced by the plant. The specific objectives and related activities planned for the project include: 1) conduct bench scale tests of a planar membrane assembly consisting of ten or more cells of about 0.8 m2 area each, 2) develop the detailed design for an ECM-based CO2 capture system applied to an existing PC plant, and 3) evaluate the effects of impurities (pollutants such as SO2, NOx, Hg) present in the coal plant flue gas by conducting laboratory scale performance tests of the membrane. The results of this project are anticipated to demonstrate that the ECM is an advanced technology, fabricated from inexpensive materials, based on proven operational track records, modular, scalable to large sizes, and a viable candidate for >90% carbon capture from existing PC plants. In this paper, the fundamentals of ECM technology including: material of construction, principal mechanisms of operation, carbon capture test results and the benefits of applications to PC plants will be presented.

Jolly, Stephen↗

Beam's-Eye-View Dosimetrics-Guided Inverse Planning for Aperture-Modulated Arc Therapy

Purpose: To use angular beam's-eye-view dosimetrics (BEVD) information to improve the computational efficiency and plan quality of inverse planning of aperture-modulated arc therapy (AMAT). Methods and Materials: In BEVD-guided inverse planning, the angular space spanned by a rotational arc is represented by a large number of fixed-gantry beams with angular spacing of approx2.5 degrees. Each beam is assigned with an initial aperture shape determined by the beam's-eye-view (BEV) projection of the planning target volume (PTV) and an initial weight. Instead of setting the beam weights arbitrarily, which slows down the subsequent optimization process and may result in a suboptimal solution, a priori knowledge about the quality of the beam directions derived from a BEVD is adopted to initialize the weights. In the BEVD calculation, a higher score is assigned to directions that allow more dose to be delivered to the PTV without exceeding the dose tolerances of the organs at risk (OARs) and vice versa. Simulated annealing is then used to optimize the segment shapes and weights. The BEVD-guided inverse planning is demonstrated by using two clinical cases, and the results are compared with those of a conventional approach without BEVD guidance. Results: An a priori knowledge-guided inverse planning scheme for AMAT is established. The inclusion of BEVD guidance significantly improves the convergence behavior of AMAT inverse planning and results in much better OAR sparing as compared with the conventional approach. Conclusions: BEVD-guidance facilitates AMAT treatment planning and provides a comprehensive tool to maximally use the technical capacity of the new arc therapeutic modality.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Southern Nevada Alternative Fuels Demonstration Project

The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this project were related to the economy and the budget cutbacks required during the project duration, which resulted in fewer bus drivers than expected the ultimate shut down of the City’s downtown bus operations.

08 HYDROGEN↗

Electrifying Subsea Infrastructure Through Ocean-Powered Systems

This paper explores the potential for electrifying subsea oil and gas infrastructure using wave-powered ocean energy systems. It details how a type of system, an Autonomous Offshore Power System (AOPS), can provide a potential solution and outlines the work and findings to data of joint industry project that integrates and co-demonstrates an AOPS with an electrified subsea asset. In this Project (Project), an AOPS will provide power and data communications to an electrified subsea asset at the PacWave South test site off the U.S. Oregon coast. Here, this paper provides a description and analysis of the system configuration, subsea asset integration process, and pre-deployment testing plans, along with projected benefits for the industry.

16 TIDAL AND WAVE POWER↗

Three-dimensional modeling: communicating risk to inform site cleanup priorities - 15238

Three-dimensional waste site models are being created at the Department of Energy's Hanford Site in southeastern Washington State as an important visualization tool for risk communication and remediation planning. When concluded, the user will have a detailed, three-dimensional subsurface view of waste sites, pipelines and facilities located in the Central Plateau portion of the site with respect to a hydrogeologic solids model of the area. This will enhance communication between the site contractor and primary points of contact, such as the government and the public. It will also allow users to plan for future projects to be completed on-site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

COTS/CRS: KSC Evolving Host Initiatives with Commercial Space Partners

NASA's Commercial Crew and Cargo Program Office (C3PO) leads the agency's commercial efforts to stimulate United States private companies as the shuttle program comes to a close. Through the Commercial Orbital Transportation Services (COTS) program, two companies, SpaceX and Orbital, were selected to demonstrate their ability to perform flights to the International Space Station. The Commercial Resupply Services (CRS) Project leverages off the COTS experience, and awarded these two private companies contracts to resupply the International Space Station after shuttle fly out. As a 2010 summer intern, I supported the COTS/CRS team in their team meetings, attended and contributed to project discussions and planning, and assisted in developing visual representations for the variety of processes and organizational endeavors required for the program to run smoothly. One aspect of the COTS/CRS program gives the involved private companies the opportunity to request available services from Kennedy Space Center (KSC); one of my projects included assisting in the development of a related Task Order Request (TOR) process. In addition, an integral part of the project was to maintain and enhance the team database for processing the variety of TORS. My experience in the project gave me great insight into the growing field of commercial space activities. The development of the TOR process involved coordinating representatives from a variety of backgrounds at KSC. A clear and concise visual representation of the TOR process in the form of a flow chart was necessary to successfully implement a task order request from one of NASA's commercial partners. The goals of the process charts were to communicate the team's ideas and foster a common thought process while at the same time allow the process to grow and evolve. It was critical that the requests from the private companies were addressed quickly and thoroughly as the process developed this summer is expected to have extensive future use.

Yohpe, Megan↗

Commercialization of a High Altitude Platform

Starting a business in any endeavor is considered to be a laborious task fraught with failure, late nights, and a spartan lifestyle. I have been honored to say that this is all true to a certain extent. It is also an extremely rewarding experience despite the difficulties encountered in such a venture. This report seeks to convey to the reader my experience of one such startup through the International Space University's Masters program and my internship at NASA Ames Space Portal. The report is divided into two primary sections which chronicle my time. Part I is comprised of “The Basics” of the project which provides background and context of the proposed business to the uninitiated. The basics needed to be redefined upon arrival at space portal and this refinement is covered in this section. Part II details “A New Direction” where we transition from the basics to a new plan for the project and the work accomplished. This section covers the second half of the internship.

high altitude platform↗

Latest Development to the Mass Tracking System (MTG)

This poster informs about the ongoing development project of the Mass Tracking System (MTG) taking place in Fuels Conditioning Complex at MFC. The information is about the MTG utilization, the possible complications in the future with the system and the solution for those complication. Furthermore, the poster reports about the progress and the future plans of the project after brief insight on how the MTG operates in the facility. Essentially, the project is separated in three different phases starting with the back-end development focusing on conversion and migration phases and finalizing with the front-end development of the website phase to provide FCF with versatile and efficient system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated Smart Distribution RD&D Project Final Technical Report

Title XIII of the Energy Independence and Security Act of 2007 (EISA), tasked OE with accelerating the commercialization, deployment and integration of advanced digital systems that are needed to modernize the nation’s electricity delivery network for enhanced interoperability and cyber security. To support this mandated task, a goal of the SGR&D Program is to develop technology with the ability to dynamically optimize grid operations and resources and incorporate demand response and consumer participation. The majority of historical research and development in the domain of distribution management systems (DMS) had focused on classical, radial and passive networks with one-way power flow from transmission to distribution systems and thus to the end customer. With the focus on customers, a bottom-up approach required a completely new thinking in real-time operations, and automation, of smart distribution systems. Thus, the GE team embarked on a project with a plan of two distinct phases. Work during the first phase concentrated on research and development (R&D) for the first three years. The second phase, lasting approximately two years, accomplished the demonstration of the use cases developed during the first phase, with further sharing and dissemination of the research at industry events. The consolidated technical scope of the project can be summarized into the following six areas: Advanced distribution modeling capability to accurately simulate/model smart grid operations. Accurate representation of the distribution system in real- or near real-time (capture real-time topology). Interoperability with, and seamless communication between, other management systems and databases used by the utility Simulation of distribution systems based on real-time operational planning to analyze the benefits of smart grid assets. Integration of network, market, and renewable resource models for next generation DMS. Management and forecasting of DER (Distributed Generation, Storage, Demand Response).

14 SOLAR ENERGY↗

Evaluating Water Assets Using Water Efficiency Framework for Infrastructure Intensive Agency

Water infrastructure-intensive organizations should incorporate sustainability principles when making decisions on infrastructure investments to ensure the long-term resilience of mission-critical equipment and components. A water efficiency evaluation framework to inform infrastructure investments is discussed and applied to three federal campuses. The methodology considered emphasizes the iterative process between data analysis and decision-making; evaluates cost-sharing solution alternatives when making final recommendations; considers both internal and external stakeholder perceptions of project outcomes and future planning; and makes explicit government and community preferences when evaluating projects. Case study findings underscore condition evaluations for infrastructure that are critical to setting a baseline for system performance and determining desired potential upgrades and sustainment strategies. Such a holistic approach has demonstrated effectiveness for understanding, classifying, and recommending innovative water asset solutions that are necessary for the public sector to consider in today’s complex, modern planning environment.

Asset Management, Alternative Water, evaluation, P↗