Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Using XML Configuration-Driven Development to Create a Customizable Ground Data System

The Mission data Processing and Control Subsystem (MPCS) is being developed as a multi-mission Ground Data System with the Mars Science Laboratory (MSL) as the first fully supported mission. MPCS is a fully featured, Java-based Ground Data System (GDS) for telecommand and telemetry processing based on Configuration-Driven Development (CDD). The eXtensible Markup Language (XML) is the ideal language for CDD because it is easily readable and editable by all levels of users and is also backed by a World Wide Web Consortium (W3C) standard and numerous powerful processing tools that make it uniquely flexible. The CDD approach adopted by MPCS minimizes changes to compiled code by using XML to create a series of configuration files that provide both coarse and fine grained control over all aspects of GDS operation.

Nash, Brent↗

Mass property control of a spin stabilized spacecraft with restrictive mission and weight constraints

In the primary experiment of the spin stabilized San Marco D/L spacecraft, the drag effects on a light spherical shell coupled to a relatively massive center body will be measured. To achieve the precise mass property control, the centroids of both the shell and the center body must coincide with each other and with the center of pressure of the shell. Precise spin balancing is needed for launch and orbital stability, and the deployable antennas need accurate alignment. Corrective measures, developed after the preliminary mass measurements showed flaws in the mass property control, are described in detail. Inertia booms and a yo-yo despin system were developed as add-on units, spin balance measurements about all three geometric axes were used to define weight minimized correction within the outer shell envelope, and boom tip mass differentials were optimized for the most favorable inertia ratio margin achievable within the mission weight constraints. The weight versus orbital lifetime trade-offs were also considered.

Lang, W. E.↗

STS-94 Day 12 Highlights

On this twelfth day of the STS-94 mission, the flight crew, Cmdr. James D. Halsell, Jr., Pilot Susan L. Still, Payload Cmdr. Janice E. Voss, Mission Specialists Michael L. Gernhardt and Donald A. Thomas, and Payload Specialists Gregory T. Linteris and Roger K. Crouch focus on developing better methods for the efficient use of fossil fuels while reducing emissions and air pollutants. The seven-astronaut crew -- divided into two teams -- provides on-orbit assistance to ground controllers throughout the mission conducting these, and as many as 30 other experiments in the Spacelab pressurized module. The goal is to emulate what laboratory work will be like on the future International Space Station.

Source record↗

Integrated Modeling of Advanced Opto-Mechanical Systems

The design of optical hardware for space applications is particularly challenging when developing high performance, novel systems that have no precedent. Integrated modeling and analysis of such opto-mechanical systems seeks to describe the end-to-end performance of the hardware using mission-relevant metrics. This multidisciplinary analysis might start with thermal disturbances from observation maneuvers, compute the system temperatures, compute the distorted positions and shapes of the hardware and compute the resulting optical performance. Dynamic disturbances such as reaction wheel imbalance or inertia imbalance of optical delay lines might be applied to a structural dynamic model and used in a guidance and control analysis. Mission-relevant science metrics might include wavefront quality, pointing error or imaging stability. Assembling a tool chain that can be both nimble and effective when scaled to the high fidelity models of detail design has been challenging. An integrated thermal, mechanical and optical analysis capability suitable for detail design has been developed and verified through experimental measurement. This capability was used in the design of flight-like breadboard hardware and development of a test apparatus that established both the level of performance of the hardware and the validity of the analysis. The analysis includes prediction of the thermal environment of the test chamber, detailed temperature distributions on the breadboard hardware, fine scale deformations of the optical elements, and computation of the wavefront quality using geometric optics. A battery of tests were conducted to assess the experiment data acquisition, measurement and control system and to establish the performance of the hardware design and accuracy of the integrated modeling. Thermal loads that represent operational observing maneuvers were imposed and the hardware optical performance was measured and compared to analytical predictions.

optomechanical analysis↗

AE-C attitude determination and control prelaunch analysis and operations plan

A description of attitude control support being supplied by the Mission and Data Operations Directorate is presented. Included are descriptions of the computer programs being used to support the missions for attitude determination, prediction, and control. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

Werking, R. D.↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

A two-level trajectory decomposition algorithm featuring optimal intermediate target selection

A decomposition algorithm is presented that optimizes complex missions by partitioning the trajectory into natural segments such as ascent or entry. Each segment defines a full-rank targeting subproblem. These are solved sequentially using the Newton-Raphson algorithm. The master problem, representing the complete mission, is to determine subproblem targets and master-problem controls that optimize the mission objective subject to intersegment constraints. The gradient projection algorithm solves this problem using derivatives obtained analytically from finite-difference subproblem sensitivities. Thus, the mission is optimized by coordinating the solution of tractible subproblems. Computational results for a synchronous equatorial mission are included.

Petersen, F. M.↗

A two-level trajectory decomposition algorithm featuring optimal intermediate target selection

A decomposition algorithm is presented which optimizes complex missions by partitioning the trajectory into natural segments such as ascent or entry. Each segment defines a full-rank targeting subproblem. These are solved sequentially using the Newton-Raphson algorithm. The master problem, representing the complete mission, is to determine subproblem targets and master-problem controls that optimize the mission objective subject to intersegment constraints. The gradient projection algorithm solves this problem using derivatives obtained analytically from finite-difference subproblem sensitivities. Thus, the mission is optimized by coordinating the solution of tractible subproblems. Computational results for a synchronous equatorial mission are included.

Petersen, F. M.↗

Analysis of Data in Accordance with Space Flight Mission Environmental Requirements

The Environmental Assurance Program sets forth standards to ensure that all flight hardware is compatible with the environments that will be encountered during a spacecraft mission. It outlines the design, test and analysis, and risk control standards for the mission and certifies that it will survive in any external or self-induced environments that the spacecraft may experience. The Environmental Requirements Document (ERD) is the most important document in the Environmental Assurance Program, providing the design and test requirements for the project's flight system, subsystems, assemblies, and instruments. This summer's project was to assist Environmental Requirements Engineers (ERE's) in completing the Environmental Assurance Program Summary Report for both the Juno Project and Mars Science Laboratory (MSL) Project. The Summary Report is a document summarizing the environmental tests and analyses of each spacecraft at both the assembly and system level. It compiles a source of all relevant information such as waivers and Problem/Failure Reports (PFRs) into a single report for easy reference of how well the spacecraft met the requirements of the project.

Jupiter properties↗

Intelligent (Autonomous) Power Controller Development for Human Deep Space Exploration

As NASAs Evolvable Mars Campaign and other exploration initiatives continue to mature they have identified the need for more autonomous operations of the power system. For current human space operations such as the International Space Station, the paradigm is to perform the planning, operation and fault diagnosis from the ground. However, the dual problems of communication lag as well as limited communication bandwidth beyond GEO synchronous orbit, underscore the need to change the operation methodology for human operation in deep space. To address this need, for the past several years the Glenn Research Center has had an effort to develop an autonomous power controller for human deep space vehicles. This presentation discusses the present roadmap for deep space exploration along with a description of conceptual power system architecture for exploration modules. It then contrasts the present ground centric control and management architecture with limited autonomy on-board the spacecraft with an advanced autonomous power control system that features ground based monitoring with a spacecraft mission manager with autonomous control of all core systems, including power. It then presents a functional breakdown of the autonomous power control system and examines its operation in both normal and fault modes. Finally, it discusses progress made in the development of a real-time power system model and how it is being used to evaluate the performance of the controller and well as using it for verification of the overall operation.

Power Systems↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Disruption of postural readaptation by inertial stimuli following space flight

Postural instability (relative to pre-flight) has been observed in all shuttle astronauts studied upon return from orbital missions. Postural stability was more closely examined in four shuttle astronaut subjects before and after an 8 day orbital mission. Results of the pre- and post-flight postural stability studies were compared with a larger (n = 34) study of astronauts returning from shuttle missions of similar duration. Results from both studies indicated that inadequate vestibular feedback was the most significant sensory deficit contributing to the postural instability observed post flight. For two of the four IML-1 astronauts, post-flight postural instability and rate of recovery toward their earth-normal performance matched the performance of the larger sample. However, post-flight postural control in one returning astronaut was substantially below mean performance. This individual, who was within normal limits with respect to postural control before the mission, indicated that recovery to pre-flight postural stability was also interrupted by a post-flight pitch plane rotation test. A similar, though less extreme departure from the mean recovery trajectory was present in another astronaut following the same post-flight rotation test. The pitch plane rotation stimuli included otolith stimuli in the form of both transient tangential and constant centripetal linear acceleration components. We inferred from these findings that adaptation on orbit and re-adaptation on earth involved a change in sensorimotor integration of vestibular signals most likely from the otolith organs.

NASA Center JSC↗

F-18 high alpha research vehicle: Lessons learned

The F-18 High Alpha Research Vehicle has proven to be a useful research tool with many unique capabilities. Many of these capabilities are to assist in characterizing flight at high angles of attack, while some provide significant research in their own right. Of these, the thrust vectoring system, the unique ability to rapidly reprogram flight controls, the reprogrammable mission computer, and a reprogrammable onboard excitation system have allowed an increased utility and versatility of the research being conducted. Because of this multifaceted approach to research in the high angle of attack regime, the capabilities of the F-18 High Alpha Research Vehicle were designed to cover as many high alpha technology bases as the program would allow. These areas include aerodynamics, controls, handling qualities, and propulsion.

Bowers, Albion H.↗

STS-77 Flight Day 4

On this fourth day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., turned their attention to the deployment of a small technology demonstration satellite known as PAMS. The Passive Aerodynamically Stabilized Magnetically-damped Satellite uses aerodynamic stabilization to orient itself properly and demonstrates a technique that could prolong the lifetime of a satellite by reducing or eliminating the requirement for attitude control propellants. After Mission Specialist Mario Runco deploys the satellite from a canister in the rear of Endeavour's payload bay, it drifts away from the orbiter in a rotating, unstable attitude by design to evaluate how quickly and effectively the spacecraft can stabilize itself using the aerodynamic stabilization method rather than by thrusters. Later in the day, the crew is seen being interviewed by Canadian Television.

Source record↗

2007 Ikhana Western States and Southern California Emergency UAS Fire Missions

Four demonstration and four emergency fire imaging missions completed: a) Thermal infrared imagery delivered in near real-time (5 to 15 minutes) to: 1) SoCal Emergency: FEMA, NIFC, NorthCom, California EOC; 2) Demo Flights: NIFC, Individual Fire Incident Commands. Imagery used for tactical and strategic decision making. Air Traffic Control gave excellent support. Mission plans flown in reverse. Real time requests for revisits of active fires. Added new fire during mission. Moved fire loiter points as fires moved. Real-time reroute around thunderstorm activity. Pre & Post flight telecons with FAA were held to review mission and discuss operational improvements. No issues with air traffic control during the 8 fire missions flown.

Cobleigh, Brent↗

Effects of Space Flight on Neutrophil Functions in Astronauts

Neutrophil phagocytosis, oxidative burst, degranulation, and the expression of selected surface markers were studied in 25 astronauts following 4 space shuttle missions. Space flight duration ranged from 5 to 11 days. Blood specimens were obtained 10 days before launch, immediately after landing, and again at 3 days after landing. The number of neutrophils increased at landing by 85%. Phagocytosis of Escherichia coli (E. coli) and oxidative burst following the medium length (9 to 11 days) missions were lower than the control mean values. Whereas, following the short-duration (5 days) mission, these functions were unchanged from control values. No consistent changes in degranulation were observed following either short or medium length space missions. The expression of CD16, CD32, CD11a, CD11b, CD11c, L-selectin and CD36 were measured and found to be variable. Specifically, CD16 and CD32 did not correlate with the changes in oxidative burst. Mission duration appears to be a factor in phagocytic and oxidative functions.

Kaur, Indreshpal↗

CELSS simulations for a lunar outpost

The paper describes a five-year simulation of two mission scenarios consisting of 14 different 'events' that could take place at a lunar outpost. The time-dependent status of the life support consumables was calculated in response to the two selected mission scenarios. This application demonstrates that complex sequences of events are reproducible for understanding of integrated mission operations. A Controlled Ecological Life Support System (CELSS) can regenerate air, water, and food from the wastes generated in the habitat and do so with safety and reliability. The CELSS Emulator is under development at the NASA's Johnson Space Center with a purpose of investigating computer simulations of integrated CELSS operations involving humans, plants, process machinery, and reservoirs. The Emulator Version 2.0 has been implemented to provide a mission-scenario-analysis capability. Thus, the future space exploration missions, lunar or Mars, can be analyzed by using 'events' to build mission timelines.

Cullingford, H. S.↗