Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Multi-Sensors Observations of Pre-Earthquake Signals. What We Learned from the Great Tohoku Earthquake?

The lessons learned from the Great Tohoku EQ (Japan, 2011) will affect our future observations and an analysis is the main focus of this presentation. Multi-sensors observations and multidisciplinary research is presented in our study of the phenomena preceding major earthquakes Our approach is based on a systematic analysis of several physical and environmental parameters, which been reported by others in connections with earthquake processes: thermal infrared radiation; temperature; concentration of electrons in the ionosphere; radon/ion activities; and atmospheric temperature/humidity [Ouzounov et al, 2011]. We used the Lithosphere-Atmosphere-Ionosphere Coupling (LAIC) model, one of several possible paradigms [Pulinets and Ouzounov, 2011] to interpret our observations. We retrospectively analyzed the temporal and spatial variations of three different physical parameters characterizing the state of the atmosphere, ionosphere the ground surface several days before the March 11, 2011 M9 Tohoku earthquake Namely: (i) Outgoing Long wave Radiation (OLR) measured at the top of the atmosphere; (ii) Anomalous variations of ionospheric parameters revealed by multi-sensors observations; and (iii) The change in the foreshock sequence (rate, space and time); Our results show that on March 8th, 2011 a rapid increase of emitted infrared radiation was observed and an anomaly developed near the epicenter with largest value occurring on March 11 at 07.30 LT. The GPS/TEC data indicate an increase and variation in electron density reaching a maximum value on March 8. Starting from this day in the lower ionosphere there was also observed an abnormal TEC variation over the epicenter. From March 3 to 11 a large increase in electron concentration was recorded at all four Japanese ground-based ionosondes, which returned to normal after the main earthquake. We use the Japanese GPS network stations and method of Radio Tomography to study the spatiotemporal structure of ionospheric perturbations, and to distinguish ionospheric responses to processes of EQ preparation against the effects of other factors. The 2-D snapshots of the electron density over Japan showed abnormal increase over the maximum stress during the night, a few hours before the main shock. Our results from recording atmospheric and ionospheric conditions during the earthquake indicate the presence of anomalies in the atmosphere and ionospheres occurring consistently over regions of maximum stress near the epicenter. Due to their long duration (hours and days) and spatial appearance (only over the Sendai region) these results do not appear to be caused by meteorological or magnetic activity. They reveal the existence of atmospheric and ionospheric phenomena occurring prior to the earthquake, which indicates new evidence of a distinct coupling between the lithosphere and atmosphere/ionosphere. Similar results have been reported before the catastrophic events in Chile (M8.8, 2010), Italy (M6.3, 2009) and Sumatra (M9.3, 2004).

Ouzonounov, D.↗

Assessment of Mars Phoenix EDL Performance

Entry, Descent, and Landing (EDL) is an especially risky phase of a planetary mission, and detailed information on the performance of a lander's EDL design is critical to mitigating the risks of future missions. 12However, the study of actual EDL performance and comparison with the pre-entry predictions has not typically been given a high priority following spacecraft landings, mainly for budgetary reasons. Because Mars Phoenix inherited hardware and design elements from a similar mission that appears to have failed during Mars EDL, NASA was particularly interested in identifying the reasons for the Phoenix mission success. Therefore, NASA sponsored a reconstruction and analysis of the downlinked Phoenix telemetry that would tell the story of this critical event sequence--focusing on the 14 minutes from cruise stage separation to landing--and identify lessons learned.

Mars Phoenix↗

Cassini Distributed Instrument Operations: What We've Learned Since Saturn Orbit Insertion

The Cassini mission to Saturn is complex with 12 science teams conducting distributed operations across the United States and Europe. Each Team includes scientists from around the world who actively participate in operations, including observation design, instrument commanding, downlink processing, and archiving. This represents a change in how JPL complex deep-space missions have been operated. Since Saturn Orbit Insertion (SOI), the Cassini Project has spent 17 months conducting science operations and has gained real-world experience that has tested the assumptions and rationale for this approach. We have learned that many of the expected benefits have been realized, but there were numerous unexpected challenges as well. This paper will discuss the lessons learned from the Cassini Tour experience to date. It will revisit the assumptions and rationale behind the distributed instrument operations design and will describe the results, good and bad, of implementing this method of operations. We will describe how Instrument Teams are structured, their roles and responsibilities, what challenges they faced going into orbital operations (the 'tour') and what creative solutions were proposed when funding limitations and schedule milestones prevented optimum solutions. We will also discuss the problems that have been encountered both on the ground and with the instruments, how these problems and anomalies were overcome, and what was learned along the way about the characteristics of distributed instrument operations.

Cassini↗

NASA Engineering and Safety Center Technical Bulletin No. 15-01: Preventing Incorrect Installation of Polarized Capacitors

Even though NASA’s Lessons Learned Information System has an entry on the reverse installation of polarized capacitors, this error keeps reoccurring and is a “lesson not learned.” The purpose of this bulletin is to discuss some of the reasons this keeps happening as well as offer best practices to prevent this error in the future.

Preventing Incorrect Installation of Polarized Cap↗

A Discussion of the Software Quality Assurance Role

The basic idea underlying this paper is that the conventional understanding of the role of a Software Quality Assurance (SQA) engineer is unduly limited. This is because few have asked who the customers of a SQA engineer are. Once you do this, you can better define what tasks a SQA engineer should perform, as well as identify the knowledge and skills that such a person should have. The consequence of doing this is that a SQA engineer can provide greater value to his or her customers. It is the position of this paper that a SQA engineer providing significant value to his or her customers must not only assume the role of an auditor, but also that of a software and systems engineer. This is because software engineers and their managers particularly value contributions that directly impact products and their development. These ideas are summarized as lessons learned, based on my experience at Jet Propulsion Laboratory (JPL).

experience↗

Dressing for Altitude: U.S. Aviation Pressure Suits--Wiley Post to Space Shuttle

Since its earliest days, flight has been about pushing the limits of technology and, in many cases, pushing the limits of human endurance. The human body can be the limiting factor in the design of aircraft and spacecraft. Humans cannot survive unaided at high altitudes. There have been a number of books written on the subject of spacesuits, but the literature on the high-altitude pressure suits is lacking. This volume provides a high-level summary of the technological development and operational use of partial- and full-pressure suits, from the earliest models to the current high altitude, full-pressure suits used for modern aviation, as well as those that were used for launch and entry on the Space Shuttle. The goal of this work is to provide a resource on the technology for suits designed to keep humans alive at the edge of space. Hopefully, future generations will learn from the hard-fought lessons of the past. NASA is committed to the future of aerospace, and a key component of that future is the workforce. Without these men and women, technological advancements would not be possible. Dressing for Altitude is designed to provide the history of the technology and to explore the lessons learned through years of research in creating, testing, and utilizing today s high-altitude suits. It is our hope that this information will prove helpful in the development of future suits. Even with the closeout of the Space Shuttle and the planned ending of the U-2 program, pressure suits will be needed for protection as long as humans seek to explore high frontiers. The NASA Aeronautics Research Mission Directorate is committed to the training of the current and future aerospace workforce. This book and the other books published by the NASA Aeronautics Research Mission Directorate are in support of this commitment. Hopefully, you will find this book a valuable resource for many years to come.

Jenkins, Dennis R.↗

Kennedy Space Center: Swamp Works

When I began my internship with the Granular Mechanics and Regolith Operations laboratory (GMRO), also known as Swamp Works, I was given the unique opportunity to shadow many teams working on various projects, and decide what projects I wanted to take part in. Before I go into details of my experiences at Swamp Works, I would like to take a moment to explain what I discovered Swamp Works to be. Swamp Works is a family of hardworking, dedicated, and driven people from various backgrounds and skill sets. These people all work to advance technologies and make science fiction science fact through means of rapid prototyping. They support and encourage failure as an option when learning new things, as long as lesson learned from said failure. In fact, their motto states "Fail, Fast, Forward." What this means is, not if but when one fails he or she must do so quickly and spring forward from the failure so that his or her progress is not delayed. With this acceptance, it provided me the confidence to dive into a multitude of projects working in various fields and with a wide range of skill sets. The first project I joined was Badger. My motivation for taking on this project was the opportunity I would have to obtain valuable experience working with 3D modeling and 3D printing technologies. Badger was a digging apparatus to be used in a highly dusty environment in a material known as Regolith. Regolith is a scientific term for the dirt or top soil found on planetary bodies. Regolith contains a large quantity of sediments less than lOppm and as a result poses a challenge of keeping it out of any cracks and crevices. Furthermore, regolith can create high levels of electrostatic energy, which can prove damaging to sensitive electrical hardware. With these characteristics in mind, I decided to take on the task of designing and manufacturing a dust proof cover for the sensitive electrical hardware. When I began this project, I did not have the slightest idea as to how to use 3D modeling software or a means of manufacturing a viable product. As I went along with variants of the design, I became very proficient with a 3D modeling program known as CREO 2.0. Upon completion of my 3D design, I then had the task of manufacturing and having, in my hands, a usable model. To do this I had to work with additive printing technologies also known as 3D printing. Through my experiences working with Badger, I realized that 3D modeling is the focal point in much of engineering. With this in mind, I have embraced this fact and decided to further my experience with this software so that I may become a more valuable asset to any firm later in my career. Mid-way through work with Badger, I picked up another project in which I found much interest. I ha~ the opportunity to work side by side with a materials and composites guru in manufacturing carbon composite coupons (test strips) for performing stress, strain, and sheer analysis on. Being from a surfing, kiteboarding, and other water sport background I have always been interested in board design. With this in mind, it is no wonder why I found interest in such a project. I had the opportunity to refine Mold preparatory, composite layup, and composite curing techniques. Following manufacturing of these composite strips, I then performed various stress tests and logged my results. With these results, future teams could create lighter, stronger, and more cost effective composite structures for use in varieties of applications. After my experiences with materials and composites testing, I have obtained crucial appreciation for detailed documentation and analysis that material sciences involve. However, as interesting as composite materials testing has been, I do not feel this is where my future career lies. Another, more on the side, project I have been involved in is building a 626 cubic foot regolith containment chamber for doing full scale testing of robotic systems. This chamber is built of high strength aluminum scaffold materials, 80/20, and massive panels of Lexan. Once the chamber is completed, it is be filled with 120 tons of regolith and dubbed the largest regolith test chamber in the world. Through my experiences with building "Big Bin" as we called it, I discovered my demand for engaging and hands on activities. Through all of my incredible experiences working with the Swamp Works at Kennedy Space Center; I have obtained crucial knowledge, insights, and experiences that have fuelled, shaped, and will continue to drive me toward my ultimate goal of obtaining not only a degree in Engineering, but obtaining a job that I can call a career. I want to give much thanks to all of those who mentored me along my journey, and to all who made this opportunity a reality.

DeFilippo, Anthony Robert↗

PV Reliability Development Lessons from JPL's Flat Plate Solar Array Project

Key reliability and engineering lessons learned from the 20-year history of the Jet Propulsion Laboratory's Flat-Plate Solar Array Project and thin film module reliability research activities are presented and analyzed. Particular emphasis is placed on lessons applicable to evolving new module technologies and the organizations involved with these technologies. The user-specific demand for reliability is a strong function of the application, its location, and its expected duration. Lessons relative to effective means of specifying reliability are described, and commonly used test requirements are assessed from the standpoint of which are the most troublesome to pass, and which correlate best with field experience. Module design lessons are also summarized, including the significance of the most frequently encountered failure mechanisms and the role of encapsulate and cell reliability in determining module reliability. Lessons pertaining to research, design, and test approaches include the historical role and usefulness of qualification tests and field tests.

photovoltaics↗

From BERTopic to SysML: Informing Model-Based Failure Analysis With Natural Language Processing for Complex Aerospace Systems

The development of emerging complex aerospace systems will require new approaches for capturing safety incident scenarios as early as possible in the design phase. However, for novel systems, relevant data available is limited. In this work, we propose a framework informing model-based mission assurance activities with historical incident reports, lessons learned, or other relevant engineering documents using natural language processing. In doing so, we investigate whether there is useful information in data sets that are relevant, if not identical, to the system under design and whether, through rigorous systems engineering practice, this information can be effectively leveraged through model-based failure analysis. In a worked case study, we apply state-of-the-art topic modeling techniques to two data sets, a mission relevant data set and a system relevant data set. The sets of topics are merged and interpreted to form a preliminary list of failure topics that can be used to inform the identification of off-nominal modes in the model-based failure modes and effects analysis development. Once data from the system in operation is available, it can be used to update the topics identified. By extracting information about likely failures from relevant historical data sets and utilizing model-based mission assurance to ensure relevance and rigor, unanticipated failures can be reduced, and projects can more effectively learn from past missions.

Failure Analysis↗

From BERTopic to SysML: Informing Model-Based Failure Analysis With Natural Language Processing for Complex Aerospace Systems

The development of emerging complex aerospace systems will require new approaches for capturing safety incident scenarios as early as possible in the design phase. However, for novel systems, relevant data available is limited. In this work, we propose a framework informing model-based mission assurance activities with historical incident reports, lessons learned, or other relevant engineering documents using natural language processing. In doing so, we investigate whether there is useful information in data sets that are relevant, if not identical, to the system under design and whether, through rigorous systems engineering practice, this information can be effectively leveraged through model-based failure analysis. In a worked case study, we apply state-of-the-art topic modeling techniques to two data sets, a mission relevant data set and a system relevant data set. The sets of topics are merged and interpreted to form a preliminary list of failure topics that can be used to inform the identification of off-nominal modes in the model-based failure modes and effects analysis development. Once data from the system in operation is available, it can be used to update the topics identified. By extracting information about likely failures from relevant historical data sets and utilizing model-based mission assurance to ensure relevance and rigor, unanticipated failures can be reduced, and projects can more effectively learn from past missions.

Failure Analysis↗

CLDP/ISS Glovebox Technical Interchange Meeting

This presentation is designed to provide a high-level overview of the Microgravity Science Glovebox (MSG) and the Life Sciences Glovebox (LSG) facilities onboard the International Space Station. In addition, it provides metrics and lessons-learned information intended for the Commercial Low-Earth Orbit Development Program (CLDP) Partners.

glovebox↗

Work Term Assignment Spring 2017

My tour in the Engineering Robotics directorate exceeded my expectations. I learned lessons about Creo, manufacturing and assembly, collaboration, and troubleshooting. During my first tour, last spring, I used Creo on a smaller project, but had limited experience with it before starting in the Dynamic Systems Test branch this spring. I gained valuable experience learning assembly design, sheet metal design and designing with intent for manufacturing and assembly. These skills came from working both on the hatch and the floor. I also learned to understand the intent of other designers on models I worked with. While redesigning the floor, I was modifying an existing part and worked to understand what the previous designer had done to make it fit with the new model. Through working with the machine shop and in the mock-up, I learned much more about manufacturing and assembly. I used a Dremel, rivet gun, belt sander, and countersink for the first time. Through taking multiple safety training for different machine shops, I learned new machine shop safety skills specific to each one. This semester also gave me new collaborative opportunities. I collaborated with engineers within my branch as well as with Human Factors and the building 10 machine shop. This experience helped me learn how to design for functionality and assembly, not only for what would be easiest in my designs. In addition to these experiences, I learned many lessons in troubleshooting. I was the first person in my office to use a Windows 10 computer. This caused unexpected issues with NASA services and programs, such as the Digital Data Management Server (DDMS). Because of this, I gained experience finding solutions to lockout and freeze issues as well as Creo specific settings. These will be useful skills to have in the future and will be implemented in future rotations. This co-op tour has motivated me more to finish my degree and pursue my academic goals. I intend to take a machining Career Gateway Elective in the Fall to improve my skills in building as well as designing with manufacturing intent. I am also inspired to take more mechatronics CGE courses before I graduate to learn more about the crossover between mechanical and electrical engineering. This semester, I worked on multiple projects and had the opportunity to learn from engineers of different disciplines. I became proficient in Creo 2.0, a program I had not used significantly before. I finished modifying the hatch for 3D print and made sizeable modifications to the nose floor support design. I also gained hands-on experience that will be useful in my engineering career in the future. I would consider all of these major achievements from this spring semester. Lastly, I learned to ask more questions and to search for the right people to find answers which I know will be a valuable skill in the future. This summer, I will be completing my last rotation in the Flight Operations Directorate at Ellington Air Field. After this last tour, I will be returning to school for the Fall, Spring and Summer. I will graduate in August of 2018. I am looking forward to learning more about the different jobs available to engineers. This division works directly with many different types of aircrafts and I am excited to learn more about this focus of engineering. The Aircraft Operations Division values team work greatly and I intend to improve my interpersonal skills by working with them this summer.

Sico, Mallory↗

PTC MathCAD and Workgroup Manager: Implementation in a Multi-Org System

In this presentation, the presenter will review what was done at Kennedy Space Center to deploy and implement PTC MathCAD and PTC Workgroup Manager in a multi-org system. During the presentation the presenter will explain how they configured PTC Windchill to create custom soft-types and object initialization rules for their custom numbering scheme and why they choose these methods. This presentation will also include how to modify the EPM default soft-type file in the PTC Windchill server codebase folder. The presenter will also go over the code used in a start up script to initiate PTC MathCAD and PTC Workgroup Manager in the proper order, and also set up the environment variables when running both PTC Workgroup Manager and PTC Creo. The configuration.ini file the presenter used will also be reviewed to show you how to set up the PTC Workgroup Manager and customized it to their user community. This presentation will be of interest to administrators trying to create a similar set-up in either a single org or multiple org system deployment. The big take away will be ideas and best practices learned through implementing this system, and the lessons learned what to do and not to do when setting up this configuration. Attendees will be exposed to several different sets of code used and that worked well and will hear some limitations on what the software can accomplish when configured this way.

Multi-Org System↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately 10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a Near Earth Asteroid (NEA). Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a near earth asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems and advance solutions. Though finite element analysis was performed during this process in an attempt to quantify forces present within the mechanism during deployment, both the boom and the sail materials do not lend themselves to achieving high-confidence results. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented here will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approx.10 cm x 20 cm x 30 cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System, will utilize a solar sail as its main method of propulsion throughout its approx.3-year mission to a Near Earth Asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗