EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the first training in a four-part series and serves as an introductory training. This training covers fundamental topics such as EV and charging technology, utility basics, and financial considerations for EVs. Additionally, this session introduces the Federal Fleet ZEV Ready Center framework, a one-stop location for federal fleet electrification resources. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure. Visit the Federal Fleet ZEV Ready Center website to learn more about the ZEV Ready Center process. EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals will enable attendees to: Identify EV and EV charging technology fundamentals; Recognize EV market and GSA Schedule options; Identify utility basics, incentives, and rates as they relate to EV charging; and Identify methods to calculate life cycle costs for EVs and gasoline vehicles.

30 DIRECT ENERGY CONVERSION↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Vacuum Insulated Panels in a Roofing Application, Camden U.S. Post Office and Courthouse, Camden, New Jersey

The U.S. General Services Administration (GSA) Public Buildings Service (PBS) acquires space on behalf of the Federal Government through new construction and leasing and acts as a steward for federal properties across the country. PBS has jurisdiction, custody, and control over 9,624 federally owned and leased assets and maintains an inventory of more than 370.2 million square feet of workspace and because of this has enormous potential for implementing energy efficient and renewable energy technologies to reduce energy and water use and associated emissions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

5G integrated edge computing platform for efficient component monitoring in coal-fired power plants

This project developed a cutting-edge 5G-integrated edge computing framework to enhance operational efficiency and reliability in coal-fired power plants through real-time component monitoring and anomaly detection. The initiative focused on leveraging distributed machine learning, federated learning, and 5G-based dynamic network slicing to support scalable, fault-tolerant monitoring environments to meet the operational requirements in industrial control systems. With a Distributed Edge Computing Service (DECS) orchestration, this project enabled federated learning at edge for condition monitoring and introduced adaptive client selection strategies to minimize communication overhead. Scalable distributed training was achieved using the Horovod framework, thus enhancing performance across edge nodes. In the realm of 5G networking, the project designed and deployed reconfigurable, QoS-aware network slicing tailored for operational technology (OT) environments, integrating software-defined networks to bolster cyber-resilience and enabling dynamic slicing for federated learning workloads. A significant milestone was the development of a virtualized ICS environment with 5G core integration—which allowed elastic and fault tolerant distributed training on real-world datasets such as NASA Bearings, Hydraulic Systems, and TEP. To broaden the impact of the project, a TRL-3 virtualized ICS testbed for research and education was designed. This project engaged several graduate and undergraduate students to conduct research on the cutting-edge technology, and it resulted in one PhD dissertation, one MS thesis, and over 14 peer-reviewed publications. With the support of this project students also participated in national cybersecurity competitions to improve their professional development skills.

20 FOSSIL-FUELED POWER PLANTS↗

Hanford Site Bald Eagle Monitoring Report for Fiscal Year 2014

The Bald Eagle (Haliaeetus leucocephalus) plays an important predatory role in the ecosystem and also serves as a national symbol for the United States of America. In 2007, the U.S. Fish and Wildlife Service (USFWS) determined that the population of bald eagles in the lower 48 States had sufficiently recovered, so the species could be removed from the federal endangered and threatened species list. The State of Washington also down-listed Bald Eagles from threatened to sensitive. Federal laws including the Bald and Golden Eagle Protection Act of 1940 and the Migratory Bird Treaty Act of 1918 still provide protection for eagles, their nest trees, and communal night roosts. The National Bald Eagle Management Guidelines, produced by the U.S. Fish and Wildlife Service, provides monitoring and management guidance for Bald Eagles (USFWS 2007). The Department of Energy (DOE) Richland Operations Office has the Bald Eagle Management Plan for the Hanford Site, South-Central Washington (DOE 2013), which defines appropriate protection measures for nests and roost sites based on federal and state guidelines. Monitoring is essential to maintain current biological information about bald eagle abundance and distribution on the Hanford Site, to ensure compliance with protection regulations, and to inform future protection and management efforts.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Bald Eagle Monitoring Report for Fiscal Year 2013

The Bald Eagle (Haliaeetus leucocephalus) plays an important predatory role in the ecosystem and also serves as a national symbol for the United States of America. In 2007 the U.S. Fish and Wildlife Service (USFWS) determined that the population of bald eagles in the lower 48 States had sufficiently recovered, so the species could be removed from the federal endangered and threatened species list. The State of Washington also down-listed Bald Eagles from threatened to sensitive. Federal laws including the Bald and Golden Eagle Protection Act of 1940 and the Migratory Bird Treaty Act of 1918 still provide protection for eagles, their nest trees, and communal night roosts. The National Bald Eagle Management Guidelines, produced by the U.S. Fish and Wildlife Service, provides monitoring and management guidance for Bald Eagles (USFWS 2007). The Department of Energy Richland Operations Office (DOE) has the Bald Eagle Management Plan for the Hanford Site, South-Central Washington (DOE 2009) that defines appropriate protection measures for nests and roost sites based on federal and state guidelines. Monitoring is essential to maintain current biological information about bald eagle abundance and distribution on the Hanford Site, to ensure compliance with protection regulations, and to inform future protection and management efforts.

54 ENVIRONMENTAL SCIENCES↗

Bald Eagle Monitoring Report for Fiscal Year 2012

The Bald Eagle (Haliaeetus leucocephalus) plays an important predatory role in the ecosystem and serves as a national symbol for the United States of America. In 2007 the U.S. Fish and Wildlife Service (USFWS) determined that the population of bald eagles in the lower 48 States had sufficiently recovered, so the species could be removed from the federal endangered and threatened species list. The State of Washington also down-listed Bald Eagles from threatened to sensitive. However, Federal laws including the Bald and Golden Eagle Protection Act of 1940 and the Migratory Bird Treaty Act of 1918 still provide protection for eagles, their nest trees, and communal night roosts. The U.S. Fish and Wildlife Service, The National Bald Eagle Management Guidelines (USFWS 2007), provides monitoring and management guidance for Bald Eagles. The U.S. Department of Energy (DOE), Richland Operations Office (RL) has a Hanford Site bald eagle management plan (DOE 2009) that defines appropriate protection measures for nests and roost sites based on federal and state guidelines. Monitoring is essential to maintain current biological information about bald eagle abundance and distribution on the Hanford Site, to ensure compliance with protection regulations, and to inform future protection and management efforts.

54 ENVIRONMENTAL SCIENCES↗

Summary of Analytical Services for the Hanford Site Radionuclide NESHAP Program

This document is a summary of the point source analytical requirements used to demonstrate compliance for the Department of Energy (DOE) Hanford Site operations with 40 Code of Federal Regulations (CFR) Part 61, “National Emission Standards for Hazardous Air Pollutants,” (NESHAP) Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities,” and the Washington Administrative Code (WAC) 246-247, “Radiation Protection – Air Emissions.” This reference collects information from multiple source documents and is not intended to create, supersede, replace or over-ride any existing contractual, DOE, federal or state statutes, regulations, compliance agreements, orders, permits, licenses or other requirements. The requirement source document governs where any difference may exist. The Hanford Mission Integration Solutions (HMIS) Environmental organization has been contracted by DOE to manage and report data collected from the sampling and monitoring of radioactive air emissions point sources, colloquially called stacks. The Environmental organization coordinates the analyses and reporting of samples collected at various facilities across the Hanford Site. These facilities operate approximately 52 stacks that require sampling, monitoring or estimating radioactive air emissions. The stacks are operated by Bechtel National, Inc. (BNI), Central Plateau Cleanup Company (CPCCo), Hanford Tank Waste Operations & Closure (H2C), Hanford Laboratory Management and Integration (HLMI), and Pacific Northwest National Laboratory (PNNL). Stack samples from CPCCo, HLMI and H2C facilities are collected by the operating contractor staff, delivered to HMIS, and then shipped to an offsite contracted laboratory for analyses. The field and laboratory sample data uploaded into the Sample Management and Analytical Results Tracking (SMART) database are used to calculate sample volumes and concentrations. Sample concentrations are evaluated for compliance with federal and state regulations, permits, and license requirements. The SMART database also calculates total curies released for sampled point sources and stacks. Point source effluent concentrations and releases are published annually in publicly available reports. The BNI and PNNL operate several DOE-Hanford Field Office (HFO) stacks subject to the requirements of 40 CFR 61, Subpart H and WAC 246-247. The concentrations, curies released and dose modeling evaluation for these stacks are included in the DOE-HFO annual radionuclide NESHAP report. The sample collection, analyses and emissions estimates for these stacks are outside the scope of HMIS contracted responsibilities and not addressed further in this document.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet and ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 556. • Corrective Action Unit 556 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Shaking Up the Residential PV Market: Implications of Recent Changes to the ITC

On August 8, 2005, the Energy Policy Act of 2005 (EPAct 2005) increased the Section 48 investment tax credit (ITC) for commercial photovoltaic (PV) systems from 10% to 30% of the project's 'tax credit basis' (i.e., the dollar amount to which the ITC applies), and also created in Section 25D of the Internal Revenue Code a new 30% ITC (capped at $2,000) for residential solar systems. Both changes went into effect on January 1, 2006, for an initial period of two years, and in late 2006 both credits were extended 'as is' for an additional year (through 2008). In early 2006, Berkeley Lab published an LBNL/CESA case study that examined the financial impact of EPAct 2005's solar tax credits on PV system owners, in light of the $2,000 cap on the residential credit, as well as the fact that most PV systems in the U.S. also receive cash incentives from state-, local-, or utility-administered PV programs, and that these cash incentives may reduce the value of federal tax credits in certain situations. That case study was subsequently revised in February 2007 to reflect new Internal Revenue Service (IRS) guidance. The findings of that case study, which are briefly recapped in the next section, remained relevant up until October 2008, when the Energy Improvement and Extension Act of 2008 extended both solar credits for an unprecedented eight years, removed the $2,000 cap on the residential credit, and eliminated restrictions on the use of both credits in conjunction with the Alternative Minimum Tax (AMT). These significant changes, which apply to systems placed in service on or after January 1, 2009, will increase the value of the solar credits for residential system owners in particular, and are likely to spur significant growth in residential, commercial, and utility-scale PV installations in the years ahead. In light of these substantial changes to the solar ITC, this report takes a fresh look at the value of these revised credits, focusing specifically on the Section 25D residential credit. After first setting the stage by briefly reviewing our previous findings, the document proceeds to cover four specific areas in which the removal of the $2,000 cap on the residential ITC will have significant implications for PV program administrators, PV system owners, and the PV industry that go beyond the obvious market growth potential created by these more-lucrative federal incentives. These four areas include: (1) The financial implications of whether or not residential cash rebates are considered to be taxable income; (2) The role of low-interest loan programs and other forms of 'subsidized energy financing' under an uncapped ITC; (3) The degree to which taxable and nontaxable rebate levels might be reduced in response to the extra value provided by an uncapped ITC; and (4) The impact of an uncapped ITC on third-party financing and ownership models that are just beginning to emerge in the residential sector. The document concludes by highlighting a common thread that runs throughout: the need for PV program managers to understand whether or not their rebates are considered to be taxable income before they can react in an appropriate manner to the recent changes in federal solar policy and, if financing programs are offered, the need to understand whether the IRS considers these programs to be 'subsidized'. Finally, we note that this paper is based on current law; future legislative changes to the ITC could, of course, alter the conclusions reached here.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

4th Annual DOE-ERSP PI Meeting: Abstracts

This contains abstracts from the 2009 Annual Environmental Remediation Sciences Program (ERSP) Principal Investigators (PI) Meeting. The ERSP seeks to advance fundamental science to understand, predict, and mitigate the impacts of environmental contamination from past nuclear weapons production and provide a scientific basis for the long-term stewardship of nuclear waste disposal. These ambitious goals cannot be achieved by any one project alone. Therefore, ERSP funds a combination of research programs at the DOE national laboratories, individual projects at universities and federal agencies, and large long(er)-term field site research. Integration of these activities to advance the ERSP goals is a constant challenge, but made significantly simpler by bringing together all funded ERSP researchers once a year to discuss the very latest research results. It is at these meetings where new ideas and/or scientific advancements in support of ERSP goals can be discussed and openly debated among all PIs in the program. The ERSP thrives, in part, on the new ideas, concepts, scientific connections, and collaborations generated as a result of these meetings. The annual PI Meeting is very much a working meeting with three major goals: (1) to provide opportunities for scientific interaction among the ERSP scientists, a critical element for the program; (2) to provide the ERSP program staff with an opportunity to evaluate the progress of each program and project; and (3) to showcase the ERSP to interested parties within DOE and within other federal agencies In addition to program managers from within OBER, there will be representatives from other offices within DOE and other federal agencies in attandance at the meeting.

54 ENVIRONMENTAL SCIENCES↗

Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco x (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.

13 HYDRO ENERGY↗

Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production would be the most likely way to produce the most rapid sustainable improvement in chum runs. Specifically, it was assumed that improving habitat conditions would promote efficient natural production, and that the most rapid way to rebuild the run would be to combine releases of an appropriate stock into the improved habitat. WDFW's recovery strategy for LCR chum salmon, as outlined in the WDFW Grays River and Washougal Hatchery Genetic Management Plans (HGMP), is as follows. First, determine if remnant populations of chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration that include the creation of spawning refugias, supplementation where necessary, and a habitat and fish monitoring and evaluation plan.

13 HYDRO ENERGY↗

State Clean Energy Policies Analysis (SCEPA): State Tax Incentives

As a policy tool, state tax incentives can be structured to help states meet clean energy goals. Policymakers often use state tax incentives in concert with state and federal policies to support renewable energy deployment or reduce market barriers. This analysis used case studies of four states to assess the contributions of state tax incentives to the development of renewable energy markets. State tax incentives that are appropriately paired with complementary state and federal policies generally provide viable mechanisms to support renewable energy deployment. However, challenges to successful implementation of state tax incentives include serving project owners with limited state tax liability, assessing appropriate incentive levels, and differentiating levels of incentives for technologies with different costs. Additionally, state tax incentives may result in moderately higher federal tax burdens. These challenges notwithstanding, state tax incentives that consider certain policy design characteristics can support renewable energy markets and state clean energy goals.The scale of their impact though is directly related to the degree to which they support the renewable energy markets for targeted sectors and technologies. This report highlights important policy design considerations for policymakers using state tax incentives to meet clean energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation Report on "The Department's Unclassified Cyber Security Program"

Industry experts report that security challenges and threats are continually evolving as malicious activity has become more web-based and attackers are able to rapidly adapt their attack methods. In addition, the number of data breaches continues to rise. In an effort to mitigate and address threats and protect valuable information, the Department of Energy anticipated spending about $275 million in Fiscal Year (FY) 2009 to implement cyber security measures necessary to protect its information technology resources. These systems and data are designed to support the Department's mission and business lines of energy security, nuclear security, scientific discovery and innovation, and environmental responsibility. The Federal Information Security Management Act of 2002 (FISMA) provides direction to agencies on the management and oversight of information security risks, including design and implementation of controls to protect Federal information and systems. As required by FISMA, the Office of Inspector General conducts an annual independent evaluation to determine whether the Department's unclassified cyber security program adequately protects its information systems and data. This memorandum and the attached report present the results of our evaluation for FY 2009. The Department continued to make incremental improvements in its unclassified cyber security program. Our evaluation disclosed that most sites had taken action to address weaknesses previously identified in our FY 2008 evaluation report. They improved certification and accreditation of systems; strengthened configuration management of networks and systems; performed independent assessments; and, developed and/or refined certain policies and procedures. In addition, the Department instituted a centralized incident response organization designed to eliminate duplicative efforts throughout the Department. As we have noted in previous reports, the Department continued to maintain strong network perimeter defenses against malicious intruders and other externals threats. These are positive accomplishments. However, in our judgment, additional action is required to further enhance the Department's unclassified cyber security program and help reduce risks to its systems and data. For example, our current review identified opportunities for improvements in areas such as security planning and testing, systems inventory, access controls, and configuration management. In particular, we issued a number of findings at sites managed by the National Nuclear Security Administration (NNSA). We also identified weaknesses across various Department program elements. Issues that warrant further attention include: (1) Weaknesses such as outdated security plans and not completing annual security control self-assessments were identified at several sites; (2) The Department had not yet resolved systems inventory issues and had yet to deploy a complex-wide automated asset management tool to help track information technology resources and identify interfaces between systems or networks; (3) Although certain improvements had been made to enhance access controls, we noted deficiencies such as a lack of periodic account reviews and inadequate password management at a number of sites; and (4) Previously identified weaknesses in configuration management had been corrected, however, we found problems related to weak administrator account settings and failure to install software patches, as well as incomplete implementation of the Federal Desktop Core Configuration. These internal control weaknesses existed, at least in part, because certain cyber security roles and responsibilities were not clearly delineated. Program officials also had not effectively performed monitoring and review activities essential for evaluating the adequacy of cyber security performance. In some cases, officials had not ensured that weaknesses discovered during audits and other evaluations were recorded and tracked to resolution in the organizations' Plans of Action and Milestones. Our testing disclosed that about 39 percent of existing corrective action milestones had missed estimated remediation dates, with many exceeding planned completion dates by at least one year. As a consequence, the risk of compromise to the Department's information and systems remained higher than necessary. To assist the continuing efforts to improve, we made several recommendations designed to help the Department's managers to strengthen the unclassified cyber security program and, thereby, protect its computer resources from unauthorized modification, loss, or disclosure of information. Due to security considerations, information on specific vulnerabilities and locations has been omitted from this report. Management officials at the sites evaluated were provided with detailed information regarding identified vulnerabilities, and, in many instances, initiated corrective actions.

99 GENERAL AND MISCELLANEOUS↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.