Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Dam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

DETERMINING THE TRIBUTARY SEDIMENT CONTRIBUTION TO EXPERIMENTAL FLOOD DEPOSITS ON THE COLORADO RIVER IN MARBLE CANYON, GRAND CANYON, ARIZONA

A multivariate sediment fingerprint was used in a Bayesian mixing model to determine the source contribution to experimental flood deposits along the Colorado River in the Marble Canyon reach of Grand Canyon, AZ. This study provides an independent evaluation, complementary to previous sediment mass balance and morphological studies, of the degree to which sand from the Paria River, the primary source of sand in Marble Canyon, has supplemented total sand storage since upstream dam closure in 1963. Samples of endmember and downstream mixed populations of sand were analyzed using portable XRF to measure the concentration of eleven major and trace elements, from which 55 elemental ratios were calculated. A principal components analysis consolidated those ratios eligible for use in the fingerprint into a multivariate signature used in the mixing model, MixSIAR. Twenty flood deposits from 14 sites in Marble Canyon from the 2013 and 2014 controlled floods were sampled. Six individual mixing models, using sediment fingerprints unique to each of six half-phi grain size fractions returned the percentage of sand, in each size fraction of each deposit, that was sourced from the Paria River. Paria contribution averaged 33.8 ± 4.1% in deposits from the 2013 flood, and 54.7 ± 4.3% in deposits from the 2014 flood. Individual grain size samples ranged 4.9 – 73.1% in 2013 and 9.1 – 90.2% in 2014. In general, iii the four median grain size fractions (90 – 355 μm) in both years have the highest Paria contribution; low Paria contribution in the finest 63 – 90 μm) fraction suggests significant contribution by an unaccounted-for third endmember, likely minor tributaries. The coarsest fraction, 355 – 500 μm, is the only grain size to show a trend in Paria contribution with distance traveled downstream, suggesting a transport-related fractionation effect. Overall scatter in the results speaks to the spatial heterogeneity of intra-rapid storage pools throughout the reach and their capacity, as well as the effects of local hydraulic variability between eddy deposition zones where sandbars form. Mass balance calculations determine that under conditions of constant or decreasing total storage since 1963, approximately 20-30% of the annual Paria flux would need to be retained within Marble Canyon each year to reach the observed concentration of Paria sand. From these results, we conclude that HFEs are conditionally sustainable given frequent enough occurrence to maintain sandbar deposit storage.

13 HYDRO ENERGY↗

Determination of Optimal Operating Schemes for a Multi-Reservoir System Under Environmental Constraints

In strati ed reservoirs, both dam tailwater discharge and thermal plant intake water quality and temperature can be highly dependent on structure depth. A two- dimensional laterally-averaged model allows for better prediction of water quality over time at specfi c depths. Because high- fidelity models are typically too computationally expensive for direct inclusion within optimization algorithms, water quality is incorporated using one dimensional models are simple flow requirements. Water quality predictions can be incorporated within the optimization process through using surrogate modeling methods, in this application artificial neural network (ANN) models. ANNs are flexible machine learning tools for function approximation composed of a structure of neurons assembled within a multi-layer architecture. They are capable of handling large amounts of training data and modeling nonlinear dynamic systems, making ANNs a well-suited method for this application. This report illustrates the development of ANN models to emulate the hydrodynamic and water quality modeling capabilities of the high- fidelity, two-dimensional CE-QUAL-W2 (W2) model, as well as a linked riverine reservoir system optimization process which accounts for energy generation, water balance and hydraulics, and compliance point water quality. A process for hourly hydropower generation planning is demonstrated on a pair of reservoirs linked in series. The two reservoirs are U.S. Army Corps of Engineers projects with hydropower capabilities on the Cumberland River near Nashville, Tennessee, USA.

13 HYDRO ENERGY↗

Geothermal Exploration of Mount Baker Hot Springs Through Ground-Based Magnetic and Gravity Surveys

The Washington State Division of Geology and Earth Resources (WDGER), together with the USGS, Altarock Energy Inc., Colorado College, Temple University, Innovate Geothermal Ltd., University of British Columbia, and Western Washington University(WWU), conducted phase two of a geothermal play fairway exploration at three plays (Mount Baker, Mount St. Helens seismic zone, and Wind River valley) along the Washington Cascade Range. The Mount Baker (MB) play is an ideal location for further investigation as a potential geothermal resource due to the presence of thermal features, young volcanic centers, existing geothermal leases, accessibility, and its proximity to existing transmission lines at the Baker Lake Dam. The goal of phase II exploration at all three plays is to collect geologic and geophysical data to help constrain spatial changes in subsurface lithology and structures that may be associated with the geothermal systems. Furthermore, this paper discusses the geothermal potential of the southeast flank of Mount Baker, WA by interpreting newly collected ground-based gravity and magnetic data. The Mount Baker play was surveyed from July-September, 2016 by the USGS, WDGER, and WWU. Results of a detailed magnetic and gravity surveys of the region surrounding the Baker hot springs, the primary surface expression of the hydrothermal system, are presented here. Gravity data were collected at 495 stations in the study area amounting to an area of roughly 150 square km. Approximately 93 km of line magnetometer data were collected within the study area, over a dozen magnetic susceptibility measurements were taken at 50 locations and about 50 hand samples were collected for density measurements. Preliminary data and modeling suggest pronounced magnetic anomalies trending NE/SW, generally in line with previously mapped lineaments identified in LiDAR. We present a series of preliminary two-dimensional forward models of the gravity and magnetic data as well as a 3D inversion model of magnetic susceptibility and interpret these models in terms of the structural controls influencing the Baker hot springs and hydrothermal system.

Geophysics↗

1.4.1.401 - Fish Protection Prize

The Fish Protection Prize sought new solutions, designs, and strategies to prevent fish from swimming into water infrastructure, such as water diversions and pipes and intakes at hydropower dams. Participants submitted innovative ideas to advance fish exclusion technology. WPTO collaborated with the U.S. Bureau of Reclamation on the Fish Protection Prize to inspire innovators to compete for $700,000 of combined cash prizes and voucher support to help protect fish from these threats. Five experts in fish passage and protection served as reviewers in the Pitch Contest, and represented a number of Federal and State agencies, including NOAA, USGS, ORNL, Washington Department of Fish and Wildlife, and AFS. Three finalists were selected as Grand Prize winners.

fish passage↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Scaled hydropower

A fish passage system having flexible textile materials forming a conduit to transport fish across river barriers encountered during migration. The system can include modular support structures that can be independently secured to riverbeds to form conduit supports, dams, hydropower structures, and the like.

13 HYDRO ENERGY↗

Coal mine ground control. 3rd ed.

The third edition not only completely revises and updates the original subject areas, but also is broadened to include a number of new topics such as high horizontal stresses, computer modeling, and highwall stability. The subject areas covered in this book define the current field of coal mine ground control, except for the recently emerging topic of mine seals and some conventional subjects such as coal/rock cutting and impoundment dams. It contains 1,134 references from all published sources, and archived since 1876.

01 COAL, LIGNITE, AND PEAT↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Radio-Ecological Conditions of Groundwater in the Area of Uranium Mining and Milling Facility - 13525

Manmade chemical and radioactive contamination of groundwater is one of damaging effects of the uranium mining and milling facilities. Groundwater contamination is of special importance for the area of Priargun Production Mining and Chemical Association, JSC 'PPMCA', because groundwater is the only source of drinking water. The paper describes natural conditions of the site, provides information on changes of near-surface area since the beginning of the company, illustrates the main trends of contaminators migration and assesses manmade impact on the quality and mode of near-surface and ground waters. The paper also provides the results of chemical and radioactive measurements in groundwater at various distances from the sources of manmade contamination to the drinking water supply areas. We show that development of deposits, mine water discharge, leakages from tailing dams and cinder storage facility changed general hydro-chemical balance of the area, contributed to new (overlaid) aureoles and flows of scattering paragenetic uranium elements, which are much smaller in comparison with natural ones. However, increasing flow of groundwater stream at the mouth of Sukhoi Urulyungui due to technological water infiltration, mixing of natural water with filtration streams from industrial reservoirs and sites, containing elevated (relative to natural background) levels of sulfate-, hydro-carbonate and carbonate- ions, led to the development and moving of the uranium contamination aureole from the undeveloped field 'Polevoye' to the water inlet area. The aureole front crossed the southern border of water inlet of drinking purpose. The qualitative composition of groundwater, especially in the southern part of water inlet, steadily changes for the worse. The current Russian intervention levels of gross alpha activity and of some natural radionuclides including {sup 222}Rn are in excess in drinking water; regulations for fluorine and manganese concentrations are also in excess. Possible ways to improve the situation are considered. (authors)

54 ENVIRONMENTAL SCIENCES↗

Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Challenges at the L-Bar Disposal Site - 19561

The L-Bar, New Mexico, Disposal Site is located in the northeast corner of Cibola County, 10 miles north of Laguna, and was the former site of a uranium mill and underground mine. The mill operated from 1977 to 1981 where a total of 1.9 x 10{sup 6} tonnes (2.1 million tons) of ore was processed. Solid and liquid byproduct, or tailings, from the milling process were impounded behind a dam constructed of native weathered Mancos Shale, which is a predominant geologic formation in the area. The tailings were encapsulated in place, and the resulting 40.5-hectare (100-acre) engineered disposal cell was completed in 2000. The 299-hectare (738-acre) Uranium Mill Tailings Radiation Control Act Title II site was transferred to the US Department of Energy (DOE) Office of Legacy Management under a US Nuclear Regulatory Commission general license in 2004. During reclamation activities, channels were designed and constructed into the surrounding weathered shale to protect the disposal cell from high-precipitation events. Due to the highly erodible soils and anticipated sediment deposition into the diversion channels, a sediment trap was also excavated. By excavating the channels and sediment trap, the local base elevation was altered, which exacerbated erosional forces. Recontouring surrounding drainage basins during the reclamation activities also promoted erosion by reducing natural rock armoring and vegetation that aids in soil stability. To compound the erosion issue, the L-Bar site is susceptible to short-duration, high-intensity, localized convective storms. Because the local geomorphology includes soils consisting of weathered shale, these precipitation events are not conducive to absorption into the soils, but rather to sheet flows that follow topography and concentrate in lower elevation areas where flow volumes and velocities increase. These factors result in the formation of deeply incised gullies and promote soil piping, which is an important geomorphic process in the widening of arroyos and the advancement of head-cutting, evident at the L-Bar site and surrounding areas. At the first annual inspection by DOE in 2005, it was noted that extensive erosion was occurring upgradient of the sediment trap. DOE determined that the design of the site's drainage system was the cause of extensive erosion. It is believed that by lowering the base elevation of the local drainage system through excavation of the sediment trap, the geomorphic response common to fluvial systems in a semiarid environment has increased the incision and remobilization of sediment downstream. Over time, these sediments would be deposited in the channels, which are designed to divert runoff away from the disposal cell, effectively limiting their capacities. The development of alluvial fans on one side of the channel directs flows to the opposite side of the channel, presenting the risk of cutting into the side slopes of the disposal cell. In addition, the upstream migrating gullies could intersect access roads and create hazards for adjacent stakeholders, including their grazing livestock. Current estimates conclude that potential offsite impacts could occur within the next 20 years, with gully migrations of up to 19 meters (63 feet) per year. In 2009, several erosion-control structures were constructed to reduce runoff velocities and ease the elevation differential created by the construction of the sediment trap and diversion channels. The first measurable storm events after construction occurred in August and September 2011, where one structure washed out and another structure was bypassed when runoff breached an earthen berm. DOE has conducted site assessments, continues to monitor erosion, and has applied lessons learned in the process of evaluating options to repair or modify the structures to stabilize the site and prevent potential short-term damage to adjacent properties as well as long-term damage to the disposal cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Theory and simulations of cross-beam energy transfer between speckled laser beams

In this paper, we introduce a realistic modeling of laser beams smoothed by random phase plates to investigate cross-beam energy transfer (CBET). We compute the total field of the smoothed laser beams, which allows us to perform accurate simulations and to build a model accounting for the realistic structure of the speckles. This lets us confirm the results already discussed in a previous work given by Oudin et al. [Phys. Plasmas 29, 112112 (2022)]. When CBET is induced by a plasma flow, plane wave models can predict the exchange between smoothed laser beams. By contrast, when the exchange is caused by a wavelength shift between the laser fields of each beam, plane wave models overestimate the energy transfer, even for strongly Landau-damped ion acoustic waves. We also show that the laser angular spread, which results from its focusing, affects the resonance between the ponderomotive force induced by the laser fields and the ion acoustic wave. It increases the resonance width, which weakly depends on the Landau damping rate when there is a wavelength shift and no flow. In addition, the power transfer obtained with or without a phase plate is essentially the same in the perturbative regime and for small crossing angles.

Laser plasma interactions↗

Oxygen Opacity Measurements at High-Energy-Density Conditions

We present the first benchmark measurements of oxygen opacity at high-energy-density, crucial for understanding stellar interiors. A 3–5−μm thick SiO 2 sample was heated using a Z facility x-ray source, and opacity was measured in the 5–19.5 Å range with multiple spectrometers. The electron temperature and density inferred from Si 𝐾-shell spectra were 148 ± 4 eV and 8.6 ±1.4 × 10 21 cm −3 , respectively. Six experiments showed opacity reproducibility within ±15% and 5%–25% opacity uncertainty. Measured oxygen opacity and seven different opacity models exhibit extraordinary overall agreement. Discrepancies near the H-like photon ionization threshold and in certain spectral lines suggest the need for model refinements.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

First Measurement of Z Opacity Sample Evolution near Solar Interior Conditions Using Time-Resolved Spectroscopy

Opacity model differences with Fe opacity measurements at high temperature (T>1⁢8⁢0 eV ) and high electron density (𝑛 𝑒 >3×10 22 cm −3 ) at nearly solar interior conditions have remained unresolved [Bailey et al., Nature 517, 56 (2015) and Nagayama et al., Phys. Rev. Lett. 122, 235001 (2019)]. Systematic errors from temporal gradients are one hypothesis for the discrepancy. Past data recorded on x-ray film provided spectral measurements over a time determined by the 2.8-ns backlighter duration. Here, we present the first measurements of opacity sample temporal evolution using novel hCMOS ultrafast x-ray camera technology. The measured conditions, measured backlighter time history, and modeled opacities are used to show that temporal gradients do not resolve the model-data discrepancy. The methods demonstrated provide potential advantages, including opacities at more extreme conditions, spectral line shift measurements, and improved measurements at other facilities.

atomic spectra↗