Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DSN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Global and Local Gravity Field Models of the Moon Using GRAIL Primary and Extended Mission Data

The Gravity Recovery and Interior Laboratory (GRAIL) mission was designed to map the structure of the lunar interior from crust to core and to advance the understanding of the Moon's thermal evolution by producing a high-quality, high-resolution map of the gravitational field of the Moon. The mission consisted of two spacecraft, which were launched in September 2011 on a Discovery-class NASA mission. Ka-band tracking between the two satellites was the single science instrument, augmented by tracking from Earth using the Deep Space Network (DSN).

Moon↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing Radio Frequency (RF) propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. However, the maturity level of this protocol stack is insufficient for mission inclusion at this time. This Space Data System prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of this protocol set. In order to reduce costs, future missions can take advantage of these standard protocols, which will result in increased interoperability between control centers. This prototype demonstrates these capabilities by implementing a realistic space data system in which telemetry is published to control center applications at the Jet Propulsion Lab (JPL), the Marshall Space Flight Center (MSFC), and the Johnson Space Center (JSC). Reverse publishing paths for commanding from each control center are also implemented. The target vehicle consists of realistic flight computer hardware running Core Flight Software (CFS) in the integrated Power, Avionics, and Power (iPAS) Pathfinder Lab at JSC. This prototype demonstrates a potential upgrade path for future Deep Space Network (DSN) modification, in which the automatic error recovery and communication gap compensation capabilities of DTN would be exploited. In addition, SM&C provides architectural flexibility by allowing new service providers and consumers to be added efficiently anywhere in the network using the common interface provided by SM&C's Message Abstraction Layer (MAL). In FY 2015, this space data system was enhanced by adding telerobotic operations capability provided by the Robot API Delegate (RAPID) family of protocols developed at NASA. RAPID is one of several candidates for consideration and inclusion in a new international standard being developed by the CCSDS Telerobotic Operations Working Group. Software gateways for the purpose of interfacing RAPID messages with the existing SM&C based infrastructure were developed. Telerobotic monitor, control, and bridge applications were written in the RAPID framework, which were then tailored to the NAO telerobotic test article hardware, a product of Aldebaran Robotics.

Rich, Thomas M.↗

The Role of Margin in Link Design and Optimization

Link analysis is a system engineering process in the design, development, and operation of communication systems and networks. Link models that are mathematical abstractions representing the useful signal power and the undesirable noise and attenuation effects (including weather effects if the signal path transverses through the atmosphere) that are integrated into the link budget calculation that provides the estimates of signal power and noise power at the receiver. Then the link margin is applied which attempts to counteract the fluctuations of the signal and noise power to ensure reliable data delivery from transmitter to receiver. (Link margin is dictated by the link margin policy or requirements.) A simple link budgeting approach assumes link parameters to be deterministic values typically adopted a rule-of-thumb policy of 3 dB link margin. This policy works for most S- and X-band links due to their insensitivity to weather effects. But for higher frequency links like Ka-band, Ku-band, and optical communication links, it is unclear if a 3 dB link margin would guarantee link closure. Statistical link analysis that adopted the 2-sigma or 3-sigma link margin incorporates link uncertainties in the sigma calculation. (The Deep Space Network (DSN) link margin policies are 2-sigma for downlink and 3-sigma for uplink.) The link reliability can therefore be quantified statistically even for higher frequency links. However in the current statistical link analysis approach, link reliability is only expressed as the likelihood of exceeding the signal-to-noise ratio (SNR) threshold that corresponds to a given bit-error-rate (BER) or frame-error-rate (FER) requirement. The method does not provide the true BER or FER estimate of the link with margin, or the required signalto-noise ratio (SNR) that would meet the BER or FER requirement in the statistical sense. In this paper, we perform in-depth analysis on the relationship between BER/FER requirement, operating SNR, and coding performance curve, in the case when the channel coherence time of link fluctuation is comparable or larger than the time duration of a codeword. We compute the "true" SNR design point that would meet the BER/FER requirement by taking into account the fluctuation of signal power and noise power at the receiver, and the shape of the coding performance curve. This analysis yields a number of valuable insights on the design choices of coding scheme and link margin for the reliable data delivery of a communication system - space and ground. We illustrate the aforementioned analysis using a number of standard NASA error-correcting codes.

Cheung, K.↗

Thomas Leps Internship Abstract

An optical navigation system is being flown as the backup system to the primary Deep Space Network telemetry for navigation and guidance purposes on Orion. This is required to ensure Orion can recover from a loss of communication, which would simultaneously cause a loss of DSN telemetry. Images taken of the Moon and Earth are used to give range and position information to the navigation computer for trajectory calculations and maneuver execution. To get telemetry data from these images, the size and location of the moon need to be calculated with high accuracy and precision. The reentry envelope for the Orion EM-1 mission requires the centroid and radius of the moon images to be determined within 1/3 of a pixel 3 sigma. In order to ensure this accuracy and precision can be attained, I was tasked with building precise dot grid images for camera calibration as well as building a hardware in the loop test stand for flight software and hardware proofing. To calibrate the Op-Nav camera a dot grid is imaged with the camera, the error between the image dot location and the actual dot location can be used to build a distortion map of the camera and lens system so that images can be fixed to display truth locations. To build the dot grid images I used the Electro Optics Lab optical bench Bright Object Simulator System, and gimbal. The gimbal was slewed to a series of elevations and azimuths. An image of the collimated single point light source was then taken at each position. After a series of 99 images were taken at different locations the single light spots were extracted from each image and added to a composite image containing all 99 points. During the development of these grids it was noticed that an intermittent error in the artificial "star" locations occurred. Prior to the summer this error was attributed to the gimbal having glitches in it's pointing direction and was going to be replaced, however after further examining the issue I determined it to be a software issue. I have since narrowed the likely source of the error down to a Software Development Kit released by the camera supplier PixeLink. I have since developed a workaround in order to build star grids for calibration until the software bug can be isolated and fixed. I was also tasked with building a Hardware in the Loop test stand in order to test the full Op-Nav system. A 4k screen displays simulated Lunar and Terrestrial images from a possible Orion trajectory. These images are then projected through a collimator and then captured with an Op-Nav camera controlled by an Intel NUC computer running flight software. The flight software then analyzes the images to determine attitude and position, this data is then reconstructed into a trajectory and matched to the simulated trajectory in order to determine the accuracy of the attitude and position estimates. In order for the system to work it needs to be precisely and accurately aligned. I developed an alignment procedure that allows the screen, collimator and camera to be squared, centered and collinear with each other within a micron spatially and 5 arcseconds in rotation. I also designed a rigid mount for the screen that was machined on site in Building 10 by another intern. While I was working in the EOL we received a $500k Orion startracker for alignment procedure testing. Due to my prior experience in electronics development, as an ancillary duty, I was tasked with building the cables required to operate and power the startracker. If any errors are made building these cables the startracker would be destroyed, I was honored that the director of the lab entrusted such a critical component with me. This internship has cemented my view on public space exploration. I always preferred public sector to privatization because, as a scientist, the most interesting aspects of space for me are not necessarily the most profitable. I was concerned that the public sector was faltering however, and that in order to improve human space exploration I would be forced into private sector. I now know that, at least at JSC, human spaceflight is still progressing, and exciting work is still being done. I am now actively seeking employment at JSC after I complete my Ph.D and have met with my branch chiefs and mentor to discuss transitioning to a grad Co-op position.

Leps, Thomas↗

Interplanetary CubeSat Navigational Challenges

CubeSats are miniaturized spacecraft of small mass that comply with a form specification so they can be launched using standardized deployers. Since the launch of the first CubeSat into Earth orbit in June of 2003, hundreds have been placed into orbit. There are currently a number of proposals to launch and operate CubeSats in deep space, including MarCO, a technology demonstration that will launch two CubeSats towards Mars using the same launch vehicle as NASA's Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) Mars lander mission. The MarCO CubeSats are designed to relay the information transmitted by the InSight UHF radio during Entry, Descent, and Landing (EDL) in real time to the antennas of the Deep Space Network (DSN) on Earth. Other CubeSatts proposals intend to demonstrate the operation of small probes in deep space, investigate the lunar South Pole, and visit a near Earth object, among others. Placing a CubeSat into an interplanetary trajectory makes it even more challenging to pack the necessary power, communications, and navigation capabilities into such a small spacecraft. This paper presents some of the challenges and approaches for successfully navigating CubeSats and other small spacecraft in deep space.

MarCo↗

An Updated Process for Automated Deepspace Conjunction Assessment

There is currently a high level of interest in the areas of conjunction assessment and collision avoidance from organizations conducting space operations. Current conjunction assessment activity is mainly focused on spacecraft and debris in the Earth orbital environment [1]. However, collisions are possible in other orbital environments as well [2]. This paper will focus on the current operations of and recent updates to the Multimission Automated Deep Space Conjunction Assessment Process (MADCAP) used at the Jet Propulsion Laboratory for NASA to perform conjunction assessment at Mars and the Moon. Various space agencies have satellites in orbit at Mars and the Moon with additional future missions planned. The consequences of collisions are catastrophically high. Intuitive notions predict low probability of collisions in these sparsely populated environments, but may be inaccurate due to several factors. Orbits of scientific interest often tend to have similar characteristics as do the orbits of spacecraft that provide a communications relay for surface missions. The MADCAP process is controlled by an automated scheduler which initializes analysis based on a set timetable or the appearance of new ephemeris files either locally or on the Deep Space Network (DSN) Portal. The process then generates and communicates reports which are used to facilitate collision avoidance decisions. The paper also describes the operational experience and utilization of the automated tool during periods of high activity and interest such as: the close approaches of NASA's Lunar Atmosphere & Dust Environment Explorer (LADEE) and Lunar Reconnaissance Orbiter (LRO) during the LADEE mission. In addition, special consideration was required for the treatment of missions with rapidly varying orbits and less reliable long term downtrack estimates; in particular this was necessitated by perturbations to MAVEN's orbit induced by the Martian atmosphere. The application of special techniques to non-operational spacecraft with large uncertainties is also studied. Areas for future work are also described. Although the applications discussed in this paper are in the Martian and Lunar environments, the techniques are not unique to these bodies and could be applied to other orbital environments.

collision↗

A Journey with MOM

In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.

Mars orbiter↗

Navigation Strategies for Primitive Solar System Body Rendezvous and Proximity Operations

A wealth of scientific knowledge regarding the composition and evolution of the solar system can be gained through reconnaissance missions to primitive solar system bodies. This paper presents analysis of a baseline navigation strategy designed to address the unique challenges of primitive body navigation. Linear covariance and Monte Carlo error analysis was performed on a baseline navigation strategy using simulated data from a· design reference mission (DRM). The objective of the DRM is to approach, rendezvous, and maintain a stable orbit about the near-Earth asteroid 4660 Nereus. The outlined navigation strategy and resulting analyses, however, are not necessarily limited to this specific target asteroid as they may he applicable to a diverse range of mission scenarios. The baseline navigation strategy included simulated data from Deep Space Network (DSN) radiometric tracking and optical image processing (OpNav). Results from the linear covariance and Monte Carlo analyses suggest the DRM navigation strategy is sufficient to approach and perform proximity operations in the vicinity of the target asteroid with meter-level accuracy.

Getzandanner, Kenneth M.↗

Stationkeeping, Orbit Determination, and Attitude Control for Spacecraft in Near Rectilinear Halo Orbits

Final document is attached. From a Near Rectilinear Halo Orbit (NRHO), NASA's Gateway at the Moon is planned to serve as a proving ground and a staging location for human missions beyond Earth. Stationkeeping, Orbit Determination (OD), and attitude control are examined for uncrewed and crewed Gateway configurations. Orbit maintenance costs are investigated using finite maneuvers, considering skipped maneuvers and perturbations. OD analysis assesses DSN tracking and identifies OD challenges associated with the NRHO and crewed operations. The Gateway attitude profile is simulated to determine an effective equilibrium attitude. Attitude control propellant use and sizing of the required passive attitude control system are assessed.

Newman, Clark P.↗

Sharing the NASA Experience

Dr. Obadiah Kegege will share his career experience with the University of Missouri _ Kansas City Students. This experience spans from academia, research and development, working on flight and ground systems for space exploration, to current work in engineering project management. Most of his NASA experience concentrates on supporting the Space Communication and Navigation Program (SCaN) program. SCaN implements, manages, and maintains communications and navigation services to existing and planned space missions. Dr. Kegege's talk will touch on topics like "how do we communicate to space," as well giving an overview of NASA's Near-Earth Network (NEN), Space Network (SN), and the Deep Space Network (DSN). Also, Dr. Kegege will answer a few questions from students, i.e applying for NASA internships, applying for jobs at NASA, etc.

Kegege, Obadiah O.↗

2018 Mars Insight Trajectory Reconstruction and Performance from Launch Through Landing

The InSight mission successfully launched to Mars on an Atlas V 401 launch vehicle from the Western Test Range (WTR) at Vandenberg Air Force Base (VAFB) at 04:05:00 PDT on May 5th, 2018 and landed in the Elysium Planitia Region on November 26th, 2018. Data confirming nominal touchdown was received at 11:52:59 AM PST. This paper summarizes in detail the actual vs. predicted performance of the InSight spacecraft and all associated assets in terms of launch vehicle events, injection performance, DSN performance, cruise performance, and Entry, Descent, and Landing events.

Abilleira, Fernando↗

Advanced Lithium Ion Venus Explorer (ALIVE)

The COncurrent Multidisciplinary Preliminary Assessment of Space Systems (COMPASS) Team partnered with the Applied Research Laboratory to perform a NASA Innovative Advanced Concepts (NIAC) Program study to evaluate chemical based power systems for keeping a Venus lander alive (power and cooling) and functional for a period of days. The mission class targeted was either a Discovery ($500M) or New Frontiers ($750M to $780M) class mission. Historic Soviet Venus landers have only lasted on the order of 2 hours in the extreme Venus environment:temperatures of 460 degrees Centigrade and pressures of 93 bar. Longer duration missions have been studied using plutonium powered systems to operate and cool landers for up to a year. However, the plutonium load is very large. This NIAC study sought to still provide power and cooling but without the plutonium. Batteries are far too heavy but a system which uses the atmosphere (primarily carbon dioxide) and on on-board fuel to power a power generation and cooling system was sought. The resuling design was the Advanced Long-Life Lander Investigating the Venus Environment (ALIVE) Spacecraft (S/C) which burns lithium (Li) with the CO2 atmosphere to heat a Duplex Stirling to power and cool the lander for a 5-day duration (until the Li is exhausted). While it does not last years a chemical powered system surviving days eliminates the cost associated with utilizing a flyby relay S/C and allows a continuous low data rate direct to earth (DTE) link in this instance from the Ovda Regio of Venus. The five-day collection time provided by the chemical power systems also enables science personnel on earth to interact and retarget science - something not possible with an approximately 2-hour spacecraft lifetime. It also allows for contingency operations directed by the ground (reduced risk). The science package was based on that envisioned by the Venus Intrepid Tessera Lander (VITaL) Decadal Survey Study. The Li Burner within the long duration power system creates approximately 14000 W of heat. This 1300 degree Centigrade heat using Li in the bottom "ballast" tank is melted to liquid by the Venus temperature, drawn into a furnace by a wick and burned with atmospheric CO2. The Li carbonate exhaust is liquid at 1300 degrees Centigrade and being denser than Li drains into the the Li tank and solidifies. Since the exhaust product is a dense liquid no "chimney" is required which conserves the heat for the stirling power convertor. The Duplex Stirling provides about 300 W of power and removes about 300 W of heat from the avionics and heat that leaks into the 1-bar-insulated payload pressure vessel kept at 25 degrees Centigrade. The Na K radiator is run to the top of the drag flap.The ALIVE vehicle is carried to Venus via an Atlas 411 launch vehicle (LV) with a C3 of 7 km2/s2. An Aeroshell, derived from the Genesis mission, enables a direct entry into the atmosphere of Venus (-10 degrees Centigrade, 40 g max) and 6 m/s for landing (44 g) using a drag ring. For surface science and communication, a 100 WRF (WebEx Recording Format), X-Band 0.6-meter pointable DTE (Direct-to-Earth) antenna provides 2 kbps (kilobits per second) to DSN (Deep-Space Network) 34-meter antenna clusters.Table 1.1 summarizes the top-level details of each subsystem that was incorporated into the design. Cost estimates of the ALIVE mission show it at approximately $760M which puts it into the New Frontiers class.The ALIVE landed duration is only limited by the amount of Li which can be carried by the lander. Further studies are needed to investigate how additional mass can be carried, perhaps by a larger launcher and larger aeroshell.

Exploration↗

Space Communications and Navigation Validation: Extracting Data for the Strategic Center for Networking, Integration, and Communications Scheduling Algorithms

Efficiency in communication system architecture performance between Space Communications and Navigation (SCaN) assets and missions is crucial, as space communication is varied, complex, and often not utilized to its full potential. The SCaN Strategic Center for Networking, Integration, and Communications (SCENIC) new scheduling algorithms, which are designed to simulate the allocation of resources between SCaN assets and missions, have the potential to simulate an increase of this efficiency; however, they require real-world data to be validated against. The purpose of this project was to extract said validation data, which details the frequency and duration of utilized contact windows between missions and assets in the Near Earth Network (NEN), Space Network (SN), and Deep Space Network (DSN). Stored as images in daily operations summaries (DOSs), the tabular data existed in a variety of file formats such as.pdf, .docx, and .doc. Since the tables were stored as images, ABBYY® FineReader® (ABBYY Software Ltd.) optical character recognition (OCR) was implemented, which is a proprietary software that reads images from text. The comma separated value (CSV) output was utilized as input to a series of MATLAB® (The MathWorks, Inc.) methods for reformatting, at which point it was ready to be machine-read. Finally, the results were converted to a Microsoft Excel format for human readability. Along with being used for validation purposes, the data will also be used to map equipment degradation as a function of time to analyze the reliability of network assets.

Kontur, Noah P.↗

Determination of Ceres Physical Parameters Using Radiometric and Optical Data

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to rendezvous with and observe the two largest bodies in the main asteroid belt, Vesta and Ceres. It has completed over a year’s worth of direct observations of Vesta from early 2011 through late 2012. In the spring of 2015, the Dawn spacecraft entered orbit around the asteroid Ceres for the start of what is expected to be more than a year of science operations. The science data collected from this encounter consist of infrared (IR) images and spectra, visible images through a number of color filters, gamma ray detections and measurements of the Ceres gravity field. These data will be collected during several science phases: an Approach phase (1500000-4860 km from Ceres), a Survey orbit (4860 km radius), a High Altitude Mapping Orbit (HAMO) (1940 km radius) and a Low Altitude Mapping Orbit (LAMO) (855 km radius). The Approach phase included three Rotational Characterization (RC) opportunities. Designing each science orbit and successfully transferring into that orbit requires a sufficiently accurate estimate of Ceres physical parameters (body fixed frame, GM and harmonics). This paper focuses on work performed to estimate Ceres physical parameters using Deep Space Network (DSN) radiometric tracking data and optical measurements derived from science camera imagery. This paper describes planning for the data acquisition, as well as processing techniques and methodology. The trajectories predicted by the gravity field estimations are also compared with the actual as-flown trajectories. Observations of the gravity at high altitudes are found to be sufficient to design precision orbits at lower altitudes. Follow-up analysis after successfully reaching LAMO is included, as is a discussion of lessons learned.

Kennedy, Brian M.↗

A Trilateration Scheme for Relative Positioning

We introduce a trilateration scheme that evaluates the 3-dimensional (3-D) relative position between a reference spacecraft and a target spacecraft using raw-range measurements from a distance baseline of known locations, which we call “anchors”. The anchors can be antennas of a ground-based network (e.g., Deep Space Network (DSN) or Near Earth Network (NEN) stations), or satellites of a spacebased network (e.g., global positioning system (GPS) or tracking and data relay satellite (TDRS)). We define raw-range as the range that includes all the systematic errors that occur during range measurements. A unique feature of this approach is that accurate relative position is derived from a “differencing function” of raw-range measurements of the reference spacecraft and target spacecraft, thereby eliminating most of the systematic errors, such as media effects, ephemeris errors, instrument delays, clock bias, etc. There can be an arbitrary number of target spacecraft, and relative positioning of target spacecraft with respect to the reference spacecraft can be done simultaneously. In this paper, we first assume an idealized system in which clocks on the reference and target spacecraft are synchronized, with clocks of the anchors synchronized as well. We develop a novel iterative algorithm that computes the relative position of the target spacecraft with respect to the reference spacecraft. We illustrate the relative positioning method using the scenario of a network of three ground stations (i.e., the anchors) at Goldstone, California, USA, Madrid, Spain, and Marlargue, Argentina tracking two spacecraft at geosynchronous orbit distance. We demonstrate that the algorithm converges to submeter accuracy in estimating the relative position, in the presence of random errors and systematic errors in raw-range measurements, and in the presence of angular errors in estimating the pointing vectors between the anchors and the reference spacecraft. Next, we relax the requirement of perfect time synchronization between spacecraft, and show that by using an additional anchor, one can estimate and remove the clock biases between the reference and target spacecraft. We add a ground station at Kourou to the above example of three ground stations of Goldstone, Madrid, and Marlargue, and demonstrate that the updated algorithm also converges to meter-level accuracy (submeter in some cases) in the presence of clock biases in addition to the random errors, systematic errors, and angular errors as shown in the above case. We compare this scheme with a similar trilateration scheme for relative positioning scheme first proposed by Montenbruck in 2002.

Cheung, Kar-Ming↗

Cassini Spacecraft Strategy for Recovering from a Complete Loss-Of-Signal Condition

Unlike other faults where the space craft’s automated Fault Protection (FP) routines can be relied upon to provide a carrier signal and telemetered data to the ground-based Spacecraft Operations Flight Support (SOFS) team to facilitate vehicle acquisition, diagnosis, and fault recovery, a complete Loss-of-Spacecraft-Signal (LOS) condition will yield no information at all to help re-acquire the vehicle and resolve the fault. For any FP response activation, the spacecraft’s downlink signal must be acquired via the Deep Space Network (DSN) on the expected (post-fault) Radio Frequency Subsystem (RFS) device configuration commanded by the FP; data that will not be attainable in the case of a complete LOS condition since there is no signal available for the ground station to lock onto. In the case of the Cassini Mission-to-Saturn spacecraft, numerous fault possibilities exist that can cause a LOS condition. Activations of the onboard RFS-related FP can reconfigure the post-fault RFS states, impeding the ground team’s ability to acquire the spacecraft’s downlink signal

Morgan, Paula S.↗

NASA SEXTANT Mission Operations Architecture

The Station Explorer for X-Ray Timing and Navigation (SEXTANT) mission is a technology demonstration enhancement to the Neutron Star Interior Composition Explorer (NICER) mission, a NASA Astrophysics Explorer Mission of Opportunity to the International Space Station (ISS) that was launched in June of 2017. The NICER instrument is a precision pointing X-ray telescope that times pulsar sourced photon arrivals which the SEXTANT mission uses to perform autonomous onboard X-ray Pulsar Navigation (XNAV). By comparing the detected time of arrival of X-ray photons to a reference of expected pulsar timing models, one can infer a range and range rate measurement based on light time delay. Since both timing and orientation information comes from a celestial source, this technology could provide a GPS-like navigation capability available throughout our Solar System and beyond. Applications that XNAV can support include outer planet and interstellar missions, manned missions, libration orbit missions, and current infrastructure such as the Deep Space Network (DSN). The SEXTANT team successfully completed a first demonstration of in-space and autonomous XNAV in November 2017. NICER and SEXTANT have separate teams, with NICER being the primary team with its own science objectives. Operational modes for both missions must have concurrent and independent components as well as an integrated ground system. This paper describes on the operational infrastructure and successful operations for performing X-ray Pulsar Navigation with the Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) demonstration. This paper first details the infrastructure implemented, then the concept of operations, and finally the operations for the SEXTANT demonstration and lessons learned.

Ground Systems↗

NASA Station Explorer for X-Ray Timing and Navigation Technology (SEXTANT) Mission Operations Architecture

"The Station Explorer for X-Ray Timing and Navigation (SEXTANT) mission is a technology demonstrationenhancement to the Neutron Star Interior Composition Explorer (NICER) mission, a NASA AstrophysicsExplorer Mission of Opportunity to the International Space Station (ISS) that was launched in June of 2017.The NICER instrument is a precision pointing X-ray telescope that provides measurements of neutron stars,which the SEXTANT mission uses to perform autonomous onboard X-ray Pulsar Navigation (XNAV) by usingmilli-second pulsars (MSPs), a category of neutron stars, as timing sources for navigation. By comparing thedetected time of arrival of X-ray photons to a reference of expected pulsar lightcurve timing models, one caninfer a range and range rate measurement based on light time delay. Since both timing and orientationinformation comes from a celestial source, this technology could provide a GPS-like navigation capabilityavailable throughout our Solar System and beyond. Applications that XNAV can support include outer planetand interstellar missions, manned missions, libration orbit missions, and current infrastructure such as the DeepSpace Network (DSN). The SEXTANT team successfully completed a rst demonstration of in-space andautonomous XNAV in November 2017. NICER and SEXTANT have separate teams, with NICER being theprimary team with its own science objectives. Operational modes for both missions must have concurrent andindependent components as well as an integrated ground system. Within this joint mission pro le, SEXTANToperations requires an infrastructure and cadence that is exible to handle concurrent science operations fromthe NICER team, independent autonomous navigation demonstrations, and events within the extensive ISSoperations environment. This paper rst details the infrastructure implemented and its concept of operations.It then describes the operations for the SEXTANT demonstration and lessons learned."

Yu, Wayne H.↗