Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Complexity management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

A Complex Brownfields Case Study—The Former Bannister Federal Complex, Kansas City, Missouri

Abstract In November 2017, 225 acres (91 ha) of the former Bannister Federal Complex (BFC) in Kansas City, Missouri were transferred from the Federal Government to Bannister Transformation & Development, LLC (BTD), for demolition; environmental corrective measures; and preparation of the site for redevelopment. This presented a once‐in‐a‐lifetime opportunity to reconfigure groundwater remedies and address long‐standing soil contamination issues. The property included more than 40 previously‐identified Solid Waste Management Units, 3.9 million square feet (362,000 m 2 ) of buildings, subsurface utilities dating back to the 1940s, and an active groundwater containment system. Demolition of buildings and installation of an interim groundwater containment system began almost immediately after property transfer. In 2018, BTD substantially modified its project schedule to incorporate the construction of the first new buildings while demolition and remedial activities were ongoing. By October 2020, construction of the first new warehouse commenced while excavation and capping of contaminated soils, installation of a groundwater containment treatment systems, and abandonment of legacy utilities were still underway. Completion of this work, within the originally planned timeframe, was made possible by factors including up‐front multi‐year funding, early and ongoing engagement of regulators, an extended 3‐year due diligence program and planning stage, and establishment of well‐defined environmental targets. Both the soil and groundwater remedies were also designed with the flexibility needed to accommodate unknown conditions, changing schedules, and revisions to the regrading and redevelopment plans. This case study highlights key technical and management factors that led to the successful completion of this complex brownfields remediation project.

Water Resources↗

Automated Generation of Fault Management Artifacts from a Simple System Model

Our understanding of off-nominal behavior - failure modes and fault propagation - in complex systems is often based purely on engineering intuition; specific cases are assessed in an ad hoc fashion as a (fallible) fault management engineer sees fit. This work is an attempt to provide a more rigorous approach to this understanding and assessment by automating the creation of a fault management artifact, the Failure Modes and Effects Analysis (FMEA) through querying a representation of the system in a SysML model. This work builds off the previous development of an off-nominal behavior model for the upcoming Soil Moisture Active-Passive (SMAP) mission at the Jet Propulsion Laboratory. We further developed the previous system model to more fully incorporate the ideas of State Analysis, and it was restructured in an organizational hierarchy that models the system as layers of control systems while also incorporating the concept of "design authority". We present software that was developed to traverse the elements and relationships in this model to automatically construct an FMEA spreadsheet. We further discuss extending this model to automatically generate other typical fault management artifacts, such as Fault Trees, to efficiently portray system behavior, and depend less on the intuition of fault management engineers to ensure complete examination of off-nominal behavior.

Spinup and Orient↗

ATR Spent Fuel Options Study

The Advanced Test Reactor (ATR) is a materials and fuels test nuclear reactor that performs irradiation services for the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Naval Reactors, the National Nuclear Security Administration (NNSA), and other research programs. ATR achieved initial criticality in 1967 and is expected to operate in support of needed missions until the year 2050 or beyond. It is anticipated that ATR will generate approximately 105 spent nuclear fuel (SNF) elements per year through the year 2050. Idaho National Laboratory (INL) currently stores 2,008 ATR SNF elements in dry storage, 976 in wet storage, and expects to have 1,000 elements in wet storage before January 2017. A capability gap exists at INL for long-term (greater than the year 2050) management, in compliance with the Idaho Settlement Agreement (ISA), of ATR SNF until a monitored retrievable geological repository is open. INL has significant wet and dry storage capabilities that are owned by the DOE Office of Environmental Management (EM) and operated and managed by Fluor Idaho, which include the Idaho Nuclear Technology and Engineering Center’s (INTEC’s) CPP-666, CPP-749, and CPP-603. In addition, INL has other capabilities owned by DOE-NE and operated and managed by Battelle Energy Alliance, LLC (BEA), which are located at the Materials and Fuel Complex (MFC). Additional storage capabilities are located on the INL Site at the Naval Reactors Facility (NRF). Current INL SNF management planning, as defined in the Fluor Idaho contract, shows INTEC dry fuel storage, which is currently used for ATR SNF, will be nearly full after transfer of an additional 1,000 ATR SNF from wet storage. DOE-NE tasked BEA with identifying and analyzing options that have the potential to fulfill this capability gap. BEA assembled a team comprised of SNF management experts from Fluor Idaho, Savannah River Site (SRS), INL/BEA, and the MITRE Corp with an objective of developing and analyzing options for fulfilling the capability gap. This management options analysis is not an alternatives analysis as defined by DOE Order 413.3B; rather, it is an evaluation of near-term, mid term and long-term actions needed to fulfill the capability gap. The actions are described in sufficient detail to inform stakeholders and DOE decision makers regarding a potential path forward. The recommended path forward will inform Fiscal Year 2019 budget formulation, support potential National Environmental Policy Act (NEPA) analyses, and may or may not include capital asset projects.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human Factors in Space Exploration

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et ai, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et aI., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et ai, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on sorne of the latest research results as well as the latest challenges still facing the field.

FROM↗

Designing Systems for Many Possible Futures. An RSC-based Method for Affordable Concept Selection (RMACS) with Multi-Era Analysis

The current downward trend in funding for U.S. defense systems seems to be on a collision course with the state of the practice in systems engineering, which typically results in the increased pace and scale of capabilities and resultantly increased cost of complex national defense systems. Recent advances in the state of the art in systems engineering methodology can be leveraged to address this growing challenge. The present work leverages advanced constructs and methods for early-phase conceptual design of complex systems, when committed costs are still low and management influence is still high. First, a literature review is presented of the topics relevant to this work, including approaches to the design of affordable systems, assumptions and methods of exploratory modeling, and enabling techniques to help mitigate the computational challenges involved. The types, purposes, and limits of early-phase, exploratory models are then elucidated. The RSC-based Method for Affordable Concept Selection (RMACS) is described, which comprises nine processes in the three main thrusts of information gathering, evaluation, and analysis. The method is then applied to a naval ship case example, described as the Next-Generation Combat Ship, with representational information outputs and discussions of affordability with respect to each process. The ninth process, Multi-Era Analysis (MERA), is introduced and explicated, including required and optional informational components, temporal and change-related considerations, required and optional activities involved, and the potential types of outputs from the process. The MERA process is then applied to a naval ship case example similar to that of the RMACS application, but with discrete change options added to enable a tradespace network. The seven activities of the MERA process are demonstrated, with the salient outputs of each given and discussed. Additional thoughts are presented on MERA and RMACS, and 8 distinct areas are identified for further research in the MERA process, along with a brief description of the directions that such research might take. It is concluded that the affordability of complex systems can be better enabled through a conceptual design method that incorporates MERA as well as metrics such as Multi-Attribute Expense, Max Expense, and Expense Stability. It is also found that affordability of changeable systems can be better enabled through the use of existing path-planning algorithms in efficient evaluation and analysis of long-term strategies. Finally, it is found that MERA enables the identification and analysis of path-dependent considerations related to designs, epochs, strategies, and change options, in many possible futures.

97 MATHEMATICS AND COMPUTING↗

Sustainable forest management for carbon, wood and biodiversity must consider natural disturbance regimes

Abstract Forests provide multiple benefits that include sequestering carbon, supporting biodiversity, and providing wood products. Managing temperate forests to achieve these benefits sustainably is challenging given the legacy of past human impacts, the complexity of forest development, and increasing but unpredictable disturbances. These intricacies prompted debate about the most effective management of temperate forests to achieve climate mitigation while sustaining forest productivity, regeneration, and diversity. Most research focused on management impacts under relatively stable environmental conditions, whereas forests are facing increasingly frequent and more severe climatic and biotic disturbances. Here, we used a regionally calibrated forest growth model to simulate the effects of forest management on carbon, biodiversity, and wood production under prevalent natural disturbances in the northeastern US. We developed scenarios combining forest management and disturbance regimes based on assumptions of species-specific tree regeneration and mortality rates. We compared passive management with no cutting that prioritizes maintaining existing forest trees with two common regional harvest practices: exploitative timber harvest that prioritizes short-term wood production and regenerative timber harvest that prioritizes regenerating biodiverse native forest tree seedlings. In the absence of natural disturbance, no cutting provides 41% higher forest carbon storage and 50% higher tree structural diversity after 100 years than exploitative or regenerative practices. The presence of drought, windstorm, pest, and disease disturbances altered these outcomes. Regenerative forest management provides 25% higher forest carbon storage and 26% higher tree structural diversity after 100 years than no cutting. Our results demonstrate that wood products and their carbon storage and fossil emission avoidance are important for determining the total climate benefits of forest management under natural disturbances. Our findings highlight that natural disturbance regimes should be considered when selecting management to promote multiple forest benefits, suggesting the need for tailored as opposed to one-size-fits-all policies to sustainably manage temperate forests worldwide.

Liu, Weier (ORCID:0000000265914239)↗

Waste to energy – key element for sustainable waste management

Highlights: • First paper on the importance of incineration from a urban metabolism point of view. • Proves that incineration is necessary for sustainable waste management. • Historical and technical overview of 100 years development of MSW incineration. - Abstract: Human activities inevitably result in wastes. The higher the material turnover, and the more complex and divers the materials produced, the more challenging it is for waste management to reach the goals of “protection of men and environment” and “resource conservation”. Waste incineration, introduced originally for volume reduction and hygienic reasons, went through a long and intense development. Together with prevention and recycling measures, waste to energy (WTE) facilities contribute significantly to reaching the goals of waste management. Sophisticated air pollution control (APC) devices ensure that emissions are environmentally safe. Incinerators are crucial and unique for the complete destruction of hazardous organic materials, to reduce risks due to pathogenic microorganisms and viruses, and for concentrating valuable as well as toxic metals in certain fractions. Bottom ash and APC residues have become new sources of secondary metals, hence incineration has become a materials recycling facility, too. WTE plants are supporting decisions about waste and environmental management: They can routinely and cost effectively supply information about chemical waste composition as well as about the ratio of biogenic to fossil carbon in MSW and off-gas.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concept of Operations for an In-time Aviation Safety Management System (IASMS) for Upper E Airspace

The National Airspace System undergoes continuous change including in the Upper Class E airspace involving increasingly complex operations and a widening diversity of vehicles. To secure a safe future system, the National Academies recommended an In-time Aviation Safety Management System (IASMS) that is extensible to Upper E. Current Air Traffic Management is not cost-effective to scale for future Upper E operations and diversity of vehicles so the Federal Aviation Administration developed an Upper E Traffic Management ConOps to safely integrate the diverse operations and vehicles having different performance characteristics and flight missions without disrupting current operations including space launch and reentry, suborbital flights, supersonic and hypersonic flights, slow moving or stationary unmanned balloons, and long endurance fixed wing vehicles that are slow, stationary, or high speed. IASMS integrates state-of-the-art predictive modeling with reactive and proactive analytics to detect hazards and mitigate risk precursors for Upper E operators. IASMS identifies emergent safety risks exposed by transformation of the NAS with new and increasingly complex operations. Safety intelligence will also expand the data available and offer insight to new approaches for implementing safety improvements to mitigate risk with more seamless “in-time” integration across the policy, risk management, safety assurance, and promotion pillars of SMS.

K Ellis↗

Exploring the Integration of Earth Observations to Support Community Management of a Protected Area in Guatemala

Central America faces increasing challenges of deforestation and habitat fragmentation with complex drivers. Protected areas are one response to these challenges, forming a continuous forest stand subject to national conservation systems and laws. As part of a novel shared-management model, both the community of Santa María Tzejá and the Protected Areas Council of Guatemala (CONAP in Spanish) co-manage Cerro Cantil, a protected area in the Ixcán department of northwestern Guatemala covering approximately 314 ha. The SERVIR program, a joint initiative between NASA and USAID, in partnership with leaders from Santa María Tzejá, began a pilot project to explore how the integration of satellite remote sensing can support forest and biodiversity monitoring and contribute to the community’s reporting requirements. To assess Cerro Cantil’s potential role to protect endemic species between three larger protected areas, we model least cost corridors between Cerro Cantil and Laguna Lachuá, Visi Cabá, and Montes Azules for Alouatta pigra (Black Howler Monkey). Additionally, we evaluate the potential contribution of a forestry-conservation incentives program (PROBOSQUE) to stem fragmentation and support biodiversity by assessing the forest area overlapping both the modeled corridors and plots belonging to families enrolled in PROBOSQUE. Results contribute to community understanding of the value of Cerro Cantil to protect local biodiversity as well as the interaction of a forestry incentive program and protected area designation.

Biodiversity↗

Challenges, Successes, and Lessons Learned on Two Active DOE Facility D and D Projects - 18379

'Surgical removal', although having a number of technical and safety challenges, is an effective alternative to traditional Demolition and Decommissioning (D and D) methods. When carefully planned and managed, surgical removal of equipment can be safely performed to achieve cost savings and accelerated schedule. At Fernald, a large groundwater extraction system that treats radionuclides was downsized during continued operations. Challenges included demolition of remedial components in tight spaces adjacent to active components, in-situ management and removal of slurry multimedia and resins, and complex hoisting/rigging of whole vessels from very tight areas. The approach realized a significant reduction in waste volumes and slurry transfer to reduce radionuclide exposure while allowing use of existing vessels as IP-1 shipping containers while providing an opportunity to implement out of the box design for hoisting/rigging/moving large vessels. Several lessons were learned as Los Alamos Technical Associates, Inc. (LATA) faced the project challenges and progressed through the D and D process. The slurry removal required thorough understanding of equipment selection and circulation techniques to maintain a slurry while avoiding plugging of extraction equipment. The physical condition of each individual tank was different and required development of alternate removal techniques, such as draining the vessel and removal of the hard material with an air vacuum truck, for each one. Lessons learned regarding large tank removal focused on recertification of an overhead crane, determination of pick points from a partially filled vessel, reanalyzing the lifting lugs for a partially full tank, and requirements to fill all void space in the vessels to meet off-site disposal specifications. At Oak Ridge National Laboratory (ORNL), LATA performed the surgical removal of all biomass process equipment inside ORNL's Building 2719. Among the challenges was a requirement that the removal action had to be conducted during continued operations. Live steam lines, fire protection, water process and boiler feed water systems were operational during LATA's D and D effort and were in close proximity to removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Management for the International Space Station

The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

Sebastian, J.↗

On the feasibility of using physics-informed machine learning for underground reservoir pressure management

In this work, we evaluate the feasibility of using physics-informed machine learning (PIML) for underground energy-related pressure management. To this end, we develop a PIML framework to manage underground reservoir pressures by training neural networks to determine fluid extraction rates for dedicated extraction wells during fluid injection operations given a range of reservoir conditions (e.g., transmissivity and storativity). We implement an automatically-differentiable analytical physics model of fluid flow in porous media within the PIML framework as a proxy for more complicated models. This allows us to execute a sufficient number of training scenarios to fully evaluate the feasibility of using PIML to support pressure management activities. We quantify the number of physics-model parameters required for automatic differentiation to become more efficient than finite-difference gradient calculations. We use a simple scenario with a single injector, extractor, and critical location for our feasibility analysis. We evaluate the effect of the size of the training dataset (i.e., the number of reservoir condition samples) on the accuracy and efficiency of the PIML framework. For an equivalent number of model evaluations, the larger training dataset took less time to train and produced a neural network that was able to more accurately manage reservoir pressures. We also evaluate the effect of the training dataset batch size (i.e., number of reservoir condition samples used to update the neural network coefficients during training; i.e., how the training dataset is partitioned). While training ran faster with larger batch sizes, they produced neural networks that managed pressures less accurately. We demonstrate the approach on a more complex scenario involving 10 injectors, 10 extractors, and 4 critical locations (a relatively high well density of 20 wells/km2). We provide the number of forward and adjoint model evaluations required in each case as an indication of the feasibility of using PIML for pressure management when more complicated physics models with longer execution times are used.

54 ENVIRONMENTAL SCIENCES↗

The role of metrics and measurements in a software intensive total quality management environment

Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

Daniels, Charles B.↗

Investigating the Complexity of Transitioning Separation Assurance Tools into NextGen Air Traffic Control

In a study, that introduced ground-based separation assurance automation through a series of envisioned transitional phases of concept maturity, it was found that subjective responses to scales of workload, situation awareness, and acceptability in a post run questionnaire revealed as-predicted results for three of the four study conditions but not for the third, Moderate condition. The trend continued for losses of separation (LOS) where the number of LOS events were far greater than expected in the Moderate condition. To offer an account of why the Moderate condition was perceived to be more difficult to manage than predicted, researchers examined the increase in amount and complexity of traffic, increase in communication load, and increased complexities as a result of the simulation's mix of aircraft equipage. Further analysis compared the tools presented through the phases, finding that controllers took advantage of the informational properties of the tools presented but shied away from using their decision support capabilities. Taking into account similar findings from other studies, it is suggested that the Moderate condition represented the first step into a "shared control" environment, which requires the controller to use the automation as a decision making partner rather than just a provider of information. Viewed in this light, the combination of tools offered in the Moderate condition was reviewed and some tradeoffs that may offset the identified complexities were suggested.

separation assurance↗

The NASA Software Management and Assurance Program

A committee of experienced managers representing each major NASA organization guides a major development effort which seeks to ensure the acquisition of economical and reliable software for more complex future programs. The primary, near-term development objectives of the NASA Software Management and Assurance Program are: (1) to provide the best management and technical guidance available; (2) to facilitate the use of proven tools, techniques, and information; and (3) to maintain a pool of highly qualified software personnel. The software development tasks addressed involve such problems as satellite end-to-end architecture and advanced aircraft guidance and control systems.

Hall, D. L.↗

Integrity Constraint Monitoring in Software Development: Proposed Architectures

In the development of complex software systems, designers are required to obtain from many sources and manage vast amounts of knowledge of the system being built and communicate this information to personnel with a variety of backgrounds. Knowledge concerning the properties of the system, including the structure of, relationships between and limitations of the data objects in the system, becomes increasingly more vital as the complexity of the system and the number of knowledge sources increases. Ensuring that violations of these properties do not occur becomes steadily more challenging. One approach toward managing the enforcement or system properties, called context monitoring, uses a centralized repository of integrity constraints and a constraint satisfiability mechanism for dynamic verification of property enforcement during program execution. The focus of this paper is to describe possible software architectures that define a mechanism for dynamically checking the satisfiability of a set of constraints on a program. The next section describes the context monitoring approach in general. Section 3 gives an overview of the work currently being done toward the addition of an integrity constraint satisfiability mechanism to a high-level program language, SequenceL, and demonstrates how this model is being examined to develop a general software architecture. Section 4 describes possible architectures for a general constraint satisfiability mechanism, as well as an alternative approach that, uses embedded database queries in lieu of an external monitor. The paper concludes with a brief summary outlining the, current state of the research and future work.

Fernandez, Francisco G.↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗