Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Computer programs for estimating civil aircraft economics

Computer programs for calculating airline direct operating cost, indirect operating cost, and return on investment were developed to provide a means for determining commercial aircraft life cycle cost and economic performance. A representative wide body subsonic jet aircraft was evaluated to illustrate use of the programs.

Maddalon, D. V.↗

The Trailblazer Program

The NASA Glenn Research Center is developing Rocket-Based Combined-Cycle (RBCC) propulsion technology for application to reusable launch vehicles in its "Trailblazer" program. This presentation will explain the cost reduction potential of RBCC propulsion, highlight the major technical issues, and describe the elements of the Trailblazer program.

Trefny, Charles J.↗

Customer Service Programming

Use of computer program STRCMACS has enabled Illinois Bell Telephone, a subsidiary of American Telephone and Telegraph to cut software development costs about 10 percent by reducing program maintenance and by allowing the department to bring other software into operation more quickly. It has also been useful in company training of programming staff.

Source record↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merion M.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

Tissue Preservation Assessment Preliminary Results

Pre-flight groundbased testing done to prepare for the first Rodent Research mission validation flight, RR1 (Choi et al, 2016 PlosOne). We purified RNA and measured RIN values to assess quality of the samples. For protein, we measured liver enzyme activities. We tested protocol and methods of preservation to date. Here we present an overview of results related to tissue preservation from the RR1 validation mission and a summary of findings to date from investigators who received RR1 teissues various Biospecimen Sharing Program.

tissue quality↗

The cost benefits of the Spacelab system to scientific investigations and space applications

Cost advantages of the Spacelab system to scientific experiments in space and space operations are presented. The payload integration concepts developed for Spacelab are examined, and it is shown that Spacelab and Shuttle integration, communications and data processing, launch support requirements and flight operations will provide a considerable savings in the costs of space research relative to previous space systems. Spacelab modular design, incorporating features such as standard payload interfaces, optional mission dependent equipment and standard services, such as the Experiment Computer Operating System, is shown to offer the user a wider range of services than previous programs, also at significantly lower costs. It is concluded that the Spacelab system will greatly reduce the costs and broaden the opportunities for scientific investigation in space.

Jean, O. C.↗

Resource Prospector (RP): A Cost-Effective Lunar Resource Pathfinder

Resource Prospector (RP) is an in-situ resource utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorates (HEOMD). This clever mission is currently planned to launch in 2020 and will demonstrate extraction of oxygen, water and other volatiles, as well measure mineralogical content such as silicon and light metals, like aluminum and titanium, from lunar regolith. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources, and the moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. This mission is equally important; however, for how it executes as a risk-tolerant, cost-effective mission. RP follows on the path-finding approaches of the Lunar Crater Observation and Sensing Satellite (LCROSS) mission. The LCROSS mission confirmed the presence of water-ice on the moon, but also established a new lightweight-approach to project and mission execution which was considerably cheaper and faster than traditional NASA missions. RP has been designated as a Class D mission, just as LCROSS. This mission classification is the most risk-tolerant class of mission within the NASA risk framework and as such, is given more latitude to accept higher-levels of residual risk. The intention is that by saving monies normally spent attempting to assure a single missions success, more missions can be funded. A well-designed portfolio can accept occasional mission failure, as it still gets more done for the same investment of resources. This classification enables tailoring the NASA Policy Requirements (NPRs) to lighter-weight approaches to mission management and execution. RP is also studying both international and commercial partnerships as a means to maximize return on the investment. International partnerships provide both capabilities synergies and cost-sharing opportunities, while the evolving new space commercial options are revealing new approaches to acquiring cost-effective services, including the benefits of bundling services. Even the world of launch vehicles is changing, offering much less expensive access to space, especially if NASA is able to be flexible in how it approaches mission assurance. Finally, leveraging investments being made elsewhere within a program portfolio, can enable cost-savings by enabling two applications with one investment. RP will be the next pathfinder mission to both enable exploration capabilities for future missions, and continue to evolve cost-effective approaches for NASA.

Lunar↗

Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study

Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

Wolfe, R. R.↗

Comparative Evaluation of Financing Programs: Insights From California’s Experience

Berkeley Lab examines criteria for a comparative assessment of multiple financing programs for energy efficiency, developed through a statewide public process in California. The state legislature directed the California Alternative Energy and Advanced Transportation Financing Authority (CAEATFA) to develop these criteria. CAEATFA's report to the legislature, an invaluable reference for other jurisdictions considering these topics, discusses the proposed criteria and the rationales behind them in detail. Berkeley Lab's brief focuses on several salient issues that emerged during the criteria development and discussion process. Many of these issues are likely to arise in other states that plan to evaluate the impacts of energy efficiency financing programs, whether for a single program or multiple programs. Issues discussed in the brief include: -The stakeholder process to develop the proposed assessment criteria -Attribution of outcomes - such as energy savings - to financing programs vs. other drivers -Choosing the outcome metric of primary interest: program take-up levels vs. savings -The use of net benefits vs. benefit-cost ratios for cost-effectiveness evaluation -Non-energy factors -Consumer protection factors -Market transformation impacts -Accommodating varying program goals in a multi-program evaluation -Accounting for costs and risks borne by various parties, including taxpayers and utility customers, in cost-effectiveness analysis -How to account for potential synergies among programs in a multi-program evaluation

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at future federal resource assessments and hydropower reform legislation.

13 HYDRO ENERGY↗

Use of optimization to predict the effect of selected parameters on commuter aircraft performance

An optimizing computer program determined the turboprop aircraft with lowest direct operating cost for various sets of cruise speed and field length constraints. External variables included wing area, wing aspect ratio and engine sea level static horsepower; tail sizes, climb speed and cruise altitude were varied within the function evaluation program. Direct operating cost was minimized for a 150 n.mi typical mission. Generally, DOC increased with increasing speed and decreasing field length but not by a large amount. Ride roughness, however, increased considerably as speed became higher and field length became shorter.

Wells, V. L.↗

SequenceL: Automated Parallel Algorithms Derived from CSP-NT Computational Laws

With the introduction of new parallel architectures like the cell and multicore chips from IBM, Intel, AMD, and ARM, as well as the petascale processing available for highend computing, a larger number of programmers will need to write parallel codes. Adding the parallel control structure to the sequence, selection, and iterative control constructs increases the complexity of code development, which often results in increased development costs and decreased reliability. SequenceL is a high-level programming language that is, a programming language that is closer to a human s way of thinking than to a machine s. Historically, high-level languages have resulted in decreased development costs and increased reliability, at the expense of performance. In recent applications at JSC and in industry, SequenceL has demonstrated the usual advantages of high-level programming in terms of low cost and high reliability. SequenceL programs, however, have run at speeds typically comparable with, and in many cases faster than, their counterparts written in C and C++ when run on single-core processors. Moreover, SequenceL is able to generate parallel executables automatically for multicore hardware, gaining parallel speedups without any extra effort from the programmer beyond what is required to write the sequen tial/singlecore code. A SequenceL-to-C++ translator has been developed that automatically renders readable multithreaded C++ from a combination of a SequenceL program and sample data input. The SequenceL language is based on two fundamental computational laws, Consume-Simplify- Produce (CSP) and Normalize-Trans - pose (NT), which enable it to automate the creation of parallel algorithms from high-level code that has no annotations of parallelism whatsoever. In our anecdotal experience, SequenceL development has been in every case less costly than development of the same algorithm in sequential (that is, single-core, single process) C or C++, and an order of magnitude less costly than development of comparable parallel code. Moreover, SequenceL not only automatically parallelizes the code, but since it is based on CSP-NT, it is provably race free, thus eliminating the largest quality challenge the parallelized software developer faces.

Cooke, Daniel↗

Unconventional propellant performance

Theoretical calculations are made of rocket performance of exotic fuels at various operating conditions such as chamber pressure, pressure ratios, and oxidizer-to-fuel ratios. By exotic fuels, it is meant using materials that may not normally be used as fuels here on Earth due to low performance. The majority of the work is currently being done on a VAX using the CET 86 program by Gordon and McBride. The CET 86 program will be installed on our IBM PS/2 Model 80 to reduce computer costs. The JPL Solid Propellant Theoretical Performance program for the IBM was also used, it handles solid fuels better than the CET 86 program. The CET 86 program by Gordon and McBride was set on the VAX and results were obtained for a number of the propellant combinations being analyzed. A sample of these results is included. Several programs were written to reduce the large amounts of data generated to include only the information needed, such as specific impulse, temperature, etc. This work involves analyzing propellants at various operating conditions and determining which will give acceptable performance and yet be easily storable for long periods of time and be readily available in space missions.

Ramohalli, Kumar↗

Opportunities in SMR Emergency Planning

Using year 2014 cost information gathered from twenty different locations within the current commercial nuclear power station fleet, an assessment was performed concerning compliance costs associated with the offsite emergency Planning Standards contained in 10 CFR 50.47(b). The study was conducted to quantitatively determine the potential cost benefits realized if an emergency planning zone (EPZ) were reduced in size according to the lowered risks expected to accompany small modular reactors (SMR). Licensees are required to provide a technical basis when proposing to reduce the surrounding EPZ size to less than the 10 mile plume exposure and 50 mile ingestion pathway distances currently being used. To assist licensees in assessing the savings that might be associated with such an action, this study established offsite emergency planning costs in connection with four discrete EPZ boundary distances, i.e., site boundary, 2 miles, 5 miles and 10 miles. The boundary selected by the licensee would be based on where EPA Protective Action Guidelines are no longer likely to be exceeded. Additional consideration was directed towards costs associated with reducing the 50 mile ingestion pathway EPZ. The assessment methodology consisted of gathering actual capital costs and annual operating and maintenance costs for offsite emergency planning programs at the surveyed sites, partitioning them according to key predictive factors, and allocating those portions to individual emergency Planning Standards as a function of EPZ size. Two techniques, an offsite population-based approach and an area-based approach, were then employed to calculate the scaling factors which enabled cost projections as a function of EPZ size. Site-specific factors that influenced source data costs, such as the effects of supplemental funding to external state and local agencies for offsite response organization activities, were incorporated into the analysis to the extent those factors could be representatively apportioned.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technology Activities in the Aerodynamics and Hydrodynamics of Propulsion Elements at MSFC (NASA)

This presentation discusses the work towards a second generation reusable launch vehicle (RLV). The goals of the second generation RLV program are reviewed. These include cost, safety, and propulsion advances. The Fluid dynamics technologies under development are discussed. These include the altitude compensating nozzle technology, the Aerospike plume induced base heating, the inducer testing technology. Pictures of altitude compensating nozzles Aerospike Plume Induced Base Heating results and Inducer testing technologies are included. Further goals of the program are to improve the methodology for optimizing design of the injectors, to improve the optimization of the turbopump and improvement of the methodology to analyze the engine performance. This presentation consists of outline view slides

Garcia, Roberto↗