Decentralized wind uncertainty management: Alternating direction method of multipliers based distributionally-robust chance constrained optimal power flow

How to manage wind power uncertainty in system operation is an urgent and important issue, especially under substantially increasing penetration levels of wind generation in electric power systems. With increasing numbers of wind power plants (WPPs) integrated into power systems, their variability and uncertain power outputs become a challenge to maintaining system reliability. Traditional stochastic optimization-based models face the curse of dimensionality when the number of WPPs increases. This paper proposes a novel decentralized wind power uncertainty management model. In this model, conventional generators optimize their power capacity output and their participation to mitigate wind power uncertainty locally with only limited information exchange with the system operators. First, a distributionally-robust chance-constrained optimal power flow (DRCC-OPF) model is deployed to schedule the generation and reserve considering the wind power forecast uncertainty. Then, the alternating direction method of multipliers (ADMM) is used to reformulate the DRCC-OPF model into the distributed optimization model for each conventional generator and WPP. The tests on a small PJM 5-bus system and the IEEE 118-bus system demonstrate that the proposed decentralized model can increase the operation reliability without sacrificing system operating cost, especially when the wind power penetration levels are high. Using the proposed model, the optimal solutions can be obtained within one minute, for all studied cases, which verifies the computation efficiency of the proposed decentralized model. Furthermore, considering a large number of WPPs integrated into the system, the proposed decentralized method obtains a lower operating cost within one minute which demonstrates its efficiency to deal with high dimension of uncertainties.

17 WIND ENERGY↗

Wind and Weather Variability within the Californian Offshore Wind Energy Areas

Weather variability over the Northeast Pacific (NEP) region and its influence on wind resources within the Californian offshore wind energy areas (WEAs) at Humboldt and Morro Bay are characterized using 20-years reanalysis model and satellite data. The hub-height (180 m) winds at both locations are predominantly northwesterly driven by the NEP high pressure system, with strong coastal gradients in surface pressure, fluxes, planetary boundary layer (PBL) depths and cloudiness. These sharp coastal gradients and strong annual cycles of temperature and moisture advections pose potential challenges in accurately modeling the local wind resource. Hub-height wind speeds and power capacity factors significantly vary for different regimes of PBL depths, surface fluxes and rain area fractions. This highlights the importance of studying the physical mechanisms driving these weather regimes, hence our analysis of how large-scale NEP weather variability drives the local meteorology at the WEAs. Furthermore, at both WEAs, PBL tops and cloud boundaries intersect the rotor layer (80-280 m) more than 30% and 20% of the time, respectively. While PBL depths significantly modulates hub-height winds and power, cloud boundaries do not have a similar impact, likely due to reanalysis errors in simulating cloud boundaries accurately. These findings underscore the challenges in deploying tall wind turbines in shallow cloudy boundary layers, where the interaction between clouds, precipitation, and atmospheric layers can impact turbine efficiency. As turbines grow taller and are deployed in more complex meteorological conditions, understanding these interactions is crucial for improving wind power forecasting and optimizing energy production in coastal regions.

17 WIND ENERGY↗

Flexible operation of batteries in power system scheduling with renewable energy

The fast growing expansion of renewable energy increases the complexities in balancing generation and demand in the power system. The energy-shifting and fast-ramping capability of energy storage has led to increasing interests in batteries to facilitate the integration of renewable resources. In this paper, we present a two-step framework to evaluate the potential value of energy storage in power systems with renewable generation. First, we formulate a stochastic unit commitment approach with wind power forecast uncertainty and energy storage. Second, the solution from the stochastic unit commitment is used to derive a flexible schedule for energy storage in economic dispatch where the look-ahead horizon is limited. Here, analysis is conducted on the IEEE 24-bus system to demonstrate the benefits of battery storage in systems with renewable resources and the effectiveness of the proposed battery operation strategy.

25 ENERGY STORAGE↗

WindView [SWR-18-51]

The National Laboratory of the Rockies (NLR) FKA: National Renewable Energy Laboratory (NREL) and Argonne National Laboratory (ANL) developed an open-source situational awareness and decision support platform called WindView that provides grid operators with knowledge on the state and performance of wind power on their system. University Texas Dallas is contracted by NLR to create a wind power forecaster that will be integrated into WindView. WindView does not provide any data, it is a visualization platform which requires the user to provide their own data. During the three year project, there has been collaboration with industry through technical review committees and specifically the Western Area Power Authority's, WAPA's Energy Training Power Center, EPTC to develop a production-level version of WindView which will work for industry.

Gamble, Christine↗

Integration of Wind Generation and Load Forecast Uncertainties into Power Grid Operations

In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.

17 WIND ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Induced Markov chain for wind farm generation forecasting

Systems and methods for forecasting power generation in a wind farm are disclosed. The systems and methods utilize an induced Markov chain model to generate a forecast of power generation of the wind farm. The forecast is at least one of a point forecast or a distributional forecast. Additionally, the systems and methods modify at least one of: (i) a generation of electricity at a power plant coupled to a common power grid as the wind farm; or (ii) a distribution of electricity in the common power grid based on the forecast of power generation of the wind farm. In an exemplary approach, utilizing the induced Markov chain model to generate the forecast may include determining a series of time adjacent power output measurements based on historical wind power measurements and calculating a time series of difference values based on the series of time adjacent power output measurements.

17 WIND ENERGY↗

Machine Learning Derived Dynamic Operating Reserve Requirements in High-Renewable Power Systems

Accurately forecasting wind and solar power output poses challenges for deeply decarbonized electricity systems. Grid operators must commit resources to provide reserves to ensure reliable operations in the face of forecast errors, a process which can increase fuel consumption and emissions. We apply neural network-based machine learning to expand the usefulness of median point forecast data by creating probabilistic distributions of short-term uncertainty in demand, wind, and solar forecasts that adapt to prevailing grid conditions. Machine learning derived estimates of forecast errors compare favorably to estimates based on incumbent methods. Reserves derived from machine learning are usually smaller than values derived using incumbent methods, which enables fuel savings during most hours. Machine learning reserves are generally larger than incumbent reserves during times of higher forecast error, potentially improving system reliability. Performance is tested using multi-stage production simulation modeling of the California Independent System Operator (CAISO) system. Machine learning reserves provide production cost and greenhouse gas (GHG) emission reductions of approximately 0.3% relative to historical 2019 requirements. Savings in the 2030 timeframe are highly dependent on battery storage capacity. At lower levels of battery capacity, savings of 0.4% from machine learning reserves are shown. Significant quantities of battery storage are expected to be added to meet California's resource adequacy needs and GHG reduction targets. Addition of these batteries saturate reserve needs and results in minimal within-hour balancing costs in 2030.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures

In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

17 WIND ENERGY↗

Overview and Meteorological Validation of the Wind Integration National Dataset toolkit

The Wind Integration National Dataset (WIND) Toolkit described in this report fulfills these requirements, and constitutes a state-of-the-art national wind resource data set covering the contiguous United States from 2007 to 2013 for use in a variety of next-generation wind integration analyses and wind power planning. The toolkit is a wind resource data set, wind forecast data set, and wind power production and forecast data set derived from the Weather Research and Forecasting (WRF) numerical weather prediction model. WIND Toolkit data are available online for over 116,000 land-based and 10,000 offshore sites representing existing and potential wind facilities.

17 WIND ENERGY↗

The Wind Forecast Improvement Project (WFIP): A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations. The Southern Study Area, Final Report

This Final Report presents a comprehensive description, findings, and conclusions for the Wind Forecast Improvement Project (WFIP) -- Southern Study Area (SSA) work led by AWS Truepower (AWST). This multi-year effort, sponsored by the Department of Energy (DOE) and National Oceanographic and Atmospheric Administration (NOAA), focused on improving short-term (15-minute - 6 hour) wind power production forecasts through the deployment of an enhanced observation network of surface and remote sensing instrumentation and the use of a state-of-the-art forecast modeling system. Key findings from the SSA modeling and forecast effort include: 1. The AWST WFIP modeling system produced an overall 10 - 20% improvement in wind power production forecasts over the existing Baseline system, especially during the first three forecast hours; 2. Improvements in ramp forecast skill, particularly for larger up and down ramps; 3. The AWST WFIP data denial experiments showed mixed results in the forecasts incorporating the experimental network instrumentation; however, ramp forecasts showed significant benefit from the additional observations, indicating that the enhanced observations were key to the model systems’ ability to capture phenomena responsible for producing large short-term excursions in power production; 4. The OU CAPS ARPS simulations showed that the additional WFIP instrument data had a small impact on their 3-km forecasts that lasted for the first 5-6 hours, and increasing the vertical model resolution in the boundary layer had a greater impact, also in the first 5 hours; and 5. The TTU simulations were inconclusive as to which assimilation scheme (3DVAR versus EnKF) provided better forecasts, and the additional observations resulted in some improvement to the forecasts in the first 1 - 3 hours.

17 WIND ENERGY↗

Wind energy and power system operations: a review of wind integration studies to date

Wind integration will not be accomplished successfully by doing ''more of the same.'' It will require significant changes in grid planning and operations, continued technical evolution in the design and operation of wind turbines, further adoption and implementation of wind forecasting in the control room, and incorporation of market and policy initiatives to encourage more flexible generation. (author)

17 WIND ENERGY↗

Observing System Simulation Experiments (OSSEs) for the Mid-Columbia Basin

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height ({approx}80 m). In this phase of the project the focus is on the Mid-Columbia Basin region, which encompasses the Bonneville Power Administration (BPA) wind generation area (Figure 1) that includes the Klondike, Stateline, and Hopkins Ridge wind plants. There are two tasks in the current project effort designed to validate the Ensemble Sensitivity Analysis (ESA) observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. The results of this task are presented in a separate report. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Colombia basin region. This report presents the results of the OSSE task. The specific objective is to test strategies for future deployment of observing systems in order to suggest the best and most efficient ways to improve wind forecasting at BPA wind farm locations. OSSEs have been used for many years in meteorology to evaluate the potential impact of proposed observing systems, determine tradeoffs in instrument design, and study the most effective data assimilation methodologies to incorporate the new observations into numerical weather prediction (NWP) models (Atlas 1997; Lord 1997). For this project, a series of OSSEs will allow consideration of the impact of new observing systems of various types and in various locations.

17 WIND ENERGY↗