Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wec”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Mooring System Cost Estimates for Wave Energy Farms in Shared Mooring Arrays

As wave energy converters (WECs) become more advanced and cost-efficient, so too must their mooring systems. A key question in the development plans for WECs is the cost of the mooring system, particularly for large wave farms. WEC devices deployed in a WEC farm array, where each device can be connected by shared mooring lines in various array layouts, have potential to reduce mooring system costs significantly. This paper presents the modeling and designing of mooring systems for large WEC arrays and the calculation of the cost of each mooring system to determine the change in cost as the number of WECs in a farm increases. A baseline mooring system for a single floating oscillating water column (OWC) WEC was developed for this analysis. The mooring system utilizes four anchored mooring lines connected to a square assembly of wire rope mooring lines, supported by four floating buoys, and attached to the floating WEC by four polyester rope mooring lines. This assembly, referred to as a floating cell, can be tiled to form various rectangular WEC arrays. The objective of this analysis is to determine how the mooring system cost changes as more WECs are added to an array layout, each with their own interconnected floating cell. To do this, complete mooring systems need to be designed for each WEC array layout. To narrow down the design space of a WEC array mooring system, a couple assumptions were made. It was assumed that the floating cell parameters of the baseline design were to stay constant across all floating cells in the WEC array. It was also assumed that the anchored mooring lines would be of the baseline configuration, a predominantly chain mooring line with a short section of polyester rope near the fairlead, and a drag-embedment anchor. These anchored lines were assumed to extend from the outer edges of the WEC array, inline with the headings of the wire rope mooring lines of the floating cells, or diagonal if extending from a corner of the WEC array. Full mooring systems were designed for 2xN and NxN WEC array layouts and efficiently simulated in the mooring dynamics simulation tool, MoorDyn, to ensure all dynamic constraints were met. The system costs were calculated and then refined by shortening unnecessary chain line lengths and reducing the chain diameters of the downstream anchored mooring lines. It was found that, in general, mooring system costs per WEC decrease when WECs are installed in an array. Compared to the baseline mooring system for a single WEC, the 2x3 mooring system array had the lowest mooring system cost per WEC, reducing the cost per WEC by 59%. The 3x3 and 4x4 array mooring systems also saw significant reductions in cost per WEC but had negligible cost savings between the two designs, primarily because the larger 4x4 mooring system requires larger chain diameters, which increases cost. These results provide an interesting glimpse into modeling, designing, and calculating the cost of mooring systems for large WEC arrays.

cost↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

Investigating the Impact of Power-Take-Off System Parameters and Control Law on a Rotational Wave Energy Converter’s Peak-to-Average Power Ratio Reduction

Due to the irregular nature of real waves, the power captured in a wave energy converter (WEC) system is highly variable. This is an important barrier to the effective use of WECs. To address this challenge, this study focuses on a rotational WEC power-take-off system in which high-speed and high-efficiency generators along with a torque/power smoothing inertia element can be effectively utilized. In the first phase of this study, the U.S. Department of Energy’s reference model 3 (WEC-Sim RM3; two-body point absorber), along with a slider-crank WEC, were integrated for linear to rotational conversion. Relative motion between the float and spar in RM3 was the driving force for this slider-crank WEC, which is connected to a motor/generator set through a gearbox. RM3 geometry was scaled down by 25 times to work within the limits of the physical motor/generator set used in the experimentation. Once the integration in a hardware-in-the-loop simulation environment was successfully completed, data on the peak-to-average power ratio was collected for various wave conditions including regular and irregular waves. The control algorithm designed to keep the system in resonance with waves was able to maintain relatively high speed depending on the specific gear ratio and wave period. Initial results with hardware-in-the-loop simulations reveal that gear ratio and crank radius have a strong impact on the peak-to-average power ratio. In addition, it was found that output power from the generator was maximized at a larger gear ratio, as the crank radius was increased.

50 EE - Wind and Water Power Program - Water (EE-4↗