Results for “waste acceptance criteria”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Thermostable Shelf Life Study

The objective of this project is to determine the shelf life end-point of various food items by means of actual measurement or mathematical projection. The primary goal of the Advanced Food Technology Project in these long duration exploratory missions is to provide the crew with a palatable, nutritious and safe food system while minimizing volume, mass, and waste. The Mars missions could be as long as 2.5 years with the potential of the food being positioned prior to the crew arrival. Therefore, it is anticipated that foods that are used during the Mars missions will require a 5 year shelf life. Shelf life criteria are safety, nutrition, and acceptability. Any of these criteria can be the limiting factor in determining the food's shelf life. Due to the heat sterilization process used for the thermostabilized food items, safety will be preserved as long as the integrity of the package is maintained. Nutrition and acceptability will change over time. Since the food can be the sole source of nutrition to the crew, a significant loss in nutrition may determine when the shelf life endpoint has occurred. Shelf life can be defined when the food item is no longer acceptable. Acceptability can be defined in terms of appearance, flavor, texture, or aroma. Results from shelf life studies of the thermostabilized food items suggest that the shelf life of the foods range from 0 months to 8 years, depending on formulation.

Perchonok, M. H.↗

Thermostabilized Shelf Life Study

The objective of this project is to determine the shelf life end-point of various food items by means of actual measurement or mathematical projection. The primary goal of the Advanced Food Technology Project in these long duration exploratory missions is to provide the crew with a palatable, nutritious and safe food system while minimizing volume, mass, and waste. The Mars missions could be as long as 2.5 years with the potential of the food being positioned prior to the crew arrival. Therefore, it is anticipated that foods that are used during the Mars missions will require a 5 year shelf life. Shelf life criteria are safety, nutrition, and acceptability. Any of these criteria can be the limiting factor in determining the food's shelf life. Due to the heat sterilization process used for the thermostabilized food items, safety will be preserved as long as the integrity of the package is maintained. Nutrition and acceptability will change over time. Since the food can be the sole source of nutrition to the crew, a significant loss in nutrition may determine when the shelf life endpoint has occurred. Shelf life can be defined when the food item is no longer acceptable. Acceptability can be defined in terms of appearance, flavor, texture, or aroma. Results from shelf life studies of the thermostabilized food items suggest that the shelf life of the foods range from 0 months to 8 years, depending on formulation.

Perchonok, Michele H.↗

Solid Sorbent Cost Sensitivity Analysis: A Framework for UNF Reprocessing Sorbent Cost Comparison

Solid sorbents have been the subject of research and development across the U.S. Department of Energy national laboratory complex for many years. They are generally accepted as a safer alternative to cryogenic distillation for noble gas capture, and they present an easier pathway in development of long-term waste forms after iodine capture. As more types of sorbents have been proposed for capture of volatile radionuclides, it has become necessary to compare them based on performance and cost criteria. This report details cost and performance information for three promising sorbents and provides a cost sensitivity analysis. The goal of this analysis is to establish a framework which can be utilized to directly compare future sorbents, with differing properties, to the sorbents discussed in this report. Direct comparison is instrumental to making informed decisions to efficiently guide research and minimize laborious detours. In all cases, sorbent capacity is a major cost driver as it influences the mass of sorbent, operational footprint, and disposal cost requirements., However, sorbent price can greatly increase the cost of a capture technology. For sorbents used in krypton capture, the purity of krypton released to storage is the highest cost driver.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Structural Effects of Postulated Hydrogen Explosions in Process Piping and Vessels - 20274

At Savannah River Site (SRS), preparations to startup new liquid waste operations and recent advances in understanding thermolytic hydrogen generation have led to several recent studies on the structural effects of postulated hydrogen explosions. This paper reports on seven representative piping and vessel cases that are evaluated for deflagrations, detonations, and deflagration-to-detonation transition (DDT) assuming the initial mixture is stoichiometric hydrogen and air. The evaluations are based on the approach used by the Department of Defense for analyzing structures subjected to accidental explosions and include inelasticity, dynamic structural amplification, and material strain-rate effects. Evaluation criteria consider the potential for repeated explosions causing fatigue but also consider that some degree of permanent plastic deformation is acceptable as long as rupture is prevented. Specific conclusions depend on the assumed pre-ignition pressure. If the pre-ignition pressure is atmospheric and if the components are designed to a code from the American Society of Mechanical Engineers, the components evaluated are expected to plastically deform but not rupture under the explosion scenarios considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oklahoma State University – Industrial Assessment Center (Final Report)

Our first primary objective is to provide industrial assessments to clients in Oklahoma, Arkansas, Kansas, and north and northwest Texas, including the Texas Panhandle (about 10% of the state of Texas). This geographical region extends about 400 miles north and south and about 600 miles east and west. In addition, the partnership links two universities, Oklahoma State University (OSU) and Wichita State University (WSU) within our region together in a significant collaboration focused on improving our region’s industrial competitiveness. Our second primary objective is to produce competent, motivated energy engineers. Student training will be a combination of classroom work, individual mentoring, and on-the-job training. The focus will be on energy conservation technologies, in conjunction with increased productivity, the economics of the same, and client relationships including client recruiting, on-site assessment, reporting, and client-related communications. Finally, we will work to provide resources and expertise to complement the first two primary objectives. The effectiveness and efficiency of our IAC will be measured, internally, by four broad criteria: (1) client benefits, (2) student development and acceptance after graduation, (3) regional/national contribution to lowering energy use and reducing pollutants, and (4) compliance with DOE/FM requirements. Client-related benefits include client contacts, timeliness of assessments and reports, the value of recommendations provided, and the value of recommendations implemented. Student development includes many students trained and the level of training provided in energy, waste, and productivity-related technologies as well as teamwork and communication skills. The contribution to lower national energy use and waste production is a natural outcome of the program. Compliance with DOE/FM requirements includes timeliness of reports, participation in Best Practices activities, contributions to EERE goals and objectives, and other requirements as communicated to the IAC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Respirator Cartridge Performance Testing on Hanford Tank A-101

Washington River Protection Solutions (WRPS) conducted tests on two types of chemical cartridges for use in air purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPCs) from vapors emanating from the headspace of tank A-101 on the Hanford Site. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules.[3] Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to ensure measurement and/or control of the key variables OSHA identified as important to estimate cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted over a period from July 22-24, 2016, using headspace vapors from Hanford tank A-101 under static conditions2 fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and 7422-SC1 (SCOTT Safety, Monroe, North Carolina) were assessed on separate days with A-101 headspace vapors. Sample media (sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridge, and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life. Key conclusions from the assessment of the 59 COPCs in this study are described below: • Based on d measured cartridge inlet vapor concentrations from tank A-101 headspace, both ammonia and N-Nitrosodimethylamine (NDMA) exceeded their Occupational Exposure Limits (OEL).3 These measurements were generally consistent with maximum A-101 headspace measurements previously obtained for these two compounds. • Ammonia had respirator cartridge outlet concentrations that exceeded 10% of the OEL for both cartridges tested, indicating breakthrough for each. For the SCOTT 7422-SD1 cartridge, ammonia appeared to breakthrough above 10% of its OEL after 2 hours. For the SCOTT 7422-SC1 cartridge, ammonia breakthrough appeared to occur after 8 hours. 1 “Adequate performance” refers to the breakthrough criteria used in this analysis—that is, sustained cartridge outlet concentrations above 10% of the OEL. For some COPCs, an alternate threshold has been applied when necessary due to higher detection limit (DL)/reporting limit (RL) values for specific compounds. Ultimately, Industrial Hygiene professionals will use these results along with specific hazard assessments to determine service life and cartridge use that provides the necessary performance. 2 These tests were conducted under static conditions absent waste-disturbing activities in the subject tank or tank farm. 3 Occupational Exposure Limits accepted for Hanford Tank Farm use are based on OELs established by a U.S. governmental agency or national professional organization (e.g., OSHA, National Institute for Occupational Safety and Health, American Conference of Governmental Industrial Hygienists), or if no U.S. OEL exists, standard toxicological practices are applied to develop OELs using non-U.S. exposure limits, other established OELs for chemical surrogates when available, or other standard procedures. The OEL for NDMA was established in 2005 based on the MAK (Maximale Arbeitsplatzkonzentration) Commission standard adopted in Europe. iv • Despite respirator inlet measurements for NDMA that were in excess of its OEL, all corresponding outlet measurements, from both respirator cartridges, were below analytical DL 1 for the

61 RADIATION PROTECTION AND DOSIMETRY↗

Enhanced Sustainability in Treatment of Contaminated Metals for Clearance and Recycling - 20290

Cyclife Sweden AB has, for more than 30 years, provided metal treatment services to the domestic and international nuclear industry with the aim of creating value through metal clearance and recycling. These operations are to a large extent based on the concept that the materials, after pre-treatment, including decontamination, will be melted for clearance. During the melting process, some nuclides separate from the metal while the remaining radioactivity becomes fully homogenized in the metal bath and the resulting ingots, along with the samples taken before casting At a time when activities to fight Climate Challenge are in focus, any savings in energy consumption, in addition to the positive environmental effect of recycling metals back to industry, is more than welcome. If the clearance of certain metallic items can be achieved safely, without using melting, it is the environmentally preferred option provided it carries a reasonable cost. It is even better if an object can go through a decontamination and clearance process prior to re-use inside or outside the nuclear sector. Cyclife Sweden is currently investing in a direct clearance process, to be operated in parallel with the melting process. This new process is expected to be fully operational in the late summer of 2020 and includes pre-treatment, decontamination and heavily shielded clearance measurement installations. The treatment will also allow clearance measurements of larger objects without the need for segmentation, along with allowing objects composed of different materials, like electric motors can be accepted for treatment. This paper gives an overview of the circular economy aspects in a nuclear back-end context, the Cyclife approach to further implement a circular economy approach in the processes, Material Acceptance Criteria for treatment, the facility set-up for the new process and how the melting route and the direct route can be combined in an efficient industrial scale process. To put the new capabilities into perspective, the two different treatment and clearance approaches, i.e. direct clearance and melting, are to be compared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design of a 2-Hour Prebreathe Protocol for Space Walks (EVAs) from the International Space Station (ISS)

The majority of extravehicular activities (EVAs) performed from the shuttle use a 10.2 psi staged decompression. The International Space Station (ISS) will operate at 14.7 psi, requiring crews to "campout" in the airlock at 10.2 psi. The constraints associated with campout (crew isolation, oxygen usage, and waste management), provided the rationale to develop a 2-hour prebreathe protocol from 14.7 psi. Previous studies on the affect of microgravity and exercise during prebreathe suggested the feasibility of this approach. Various combinations of adynamia (nonwalking subjects), prebreathe exercise doses, and space suit donning options (10.2 vs. 14.7 psi) were analyzed against timeline and consumable constraints. Prospective decompression sickness (DCS) and venous gas emboli (VGE) accept/reject criteria were defined from statistical analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept / reject limits were adjusted for greater safety (including Grade IV VGE criteria) based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center laboratory trial, including the capability of rejecting the primary protocol and testing at least one alternate exercise dose, within the 2-hour prebreathe. The 2-hour protocol incorporates 0, breathing for 5 0 min at 14.7 psi, including 10 min dual cycle ergometry at 75%VO(2max). It requires an additional 30 minO2breathing during depress from 14.7 to 10.2 psi, followed by a 30-60 min suit donning break at 10.2 psi/26.5% O2. It concludes with a 40 min in-suit O2 prebreathe. The protocol would be accepted for operations, if the incidence of DCS was less than 15% and Grade IV VGE less than 20%, both at 95% confidence. The above protocol and accept/reject limits were implemented in a multi-center study.

Gernhardt, M. L.↗

ASNF Engineering Scale Drying Experiment Acceptance Criteria for Fabricated Items

This document specifies the acceptance criteria for items fabricated by Holtec International under the scope of INL Contract # 215725, consistent with the parameters described in INL/EXT-19-56017, Aluminum-clad Spent Nuclear Fuel Engineering Scale Drying Experiment Design. Verification is confirmed with initials (or the need for remediation may be identified) along with the date of inspection for each requirement. Verification may be performed by independent proxy (University of South Carolina participant, under INL Contract Number 207046) or by an INL employee, remotely by camera images.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive Examination of Shipping Package 9975-02731

Destructive and non-destructive examinations were performed on the components of the package 9975-02731 as part of a comprehensive Savannah River Site surveillance program for plutonium materials stored in the K-Area Complex (KAC). The package stored nuclear materials in KAC for 13.8 years. Inspection of the package during opening in KAC noted one non-conforming condition: a large discolored area on the upper fiberboard subassembly. The package was subsequently transferred to Savannah River National Laboratory for more detailed examination. In addition to the observation noted in KAC, the following conditions were observed: (1) Axial gap of 1.021 inch slightly exceeded the 1 inch maximum criterion, and (2) Lead shield height exceeded drawing tolerance of 24.7 inch by 0.019 inch. Visual examination of the upper fiberboard assembly and analysis of the discolored fiberboard indicate the discoloration was due to wood glue residue. The physical, thermal, and mechanical properties of the fiberboard met the acceptance criteria and/or were within the range of previously tested fiberboard and baseline samples. The visual, microscopic and tensile testing results were consistent with previous O-ring and baseline Viton results. The lead shield surface was covered with corrosion product as observed on other shields but there was no evidence of excessive blistering, flaking, or spalling. Besides minor and expected corrosion, no evidence of a degraded condition was found in this package. Examination of the 9975-02731 corroborates existing evidence that the 9975 package is robust and the components can perform their expected functions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗