Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transition operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Energy-Aware Route Planning with RouteE Compass

This poster introduces RouteE Compass, a new tool that advances sustainable transportation by enabling energy-aware route planning across diverse vehicle types and large-scale road networks. By addressing practical trade-offs between energy consumption, travel time, and economic cost, RouteE Compass fills critical gaps in traditional routing methods, which often lack the flexibility to prioritize energy directly. The tool's scalability and high-performance computing capabilities allow for national-scale analyses, offering actionable insights for fleet operators, transit agencies, and researchers. As an open-source, extensible platform, RouteE Compass empowers ongoing research and innovation in energy-aware routing, supporting the broader goals of reducing emissions and enhancing transportation sustainability.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗

Small-Signal Stability Support from Dynamically Configurable Grid-Forming/Following Inverters for Distribution Systems: Preprint

As the penetration of inverter-based resources (IBRs) continues to increase in modern power systems, system stability is challenged by the insufficient inertia induced by IBRs; hence, there is a need to develop various methods to address the potential instabilities. In this paper, grid-forming (GFM) and grid-following (GFL) controls are implemented for inverters with flexible-mode transitions between them. The operation mode transition between GFM and GFL controls is adopted as an additional degree of control flexibility to adjust the small signal stability margin. Further, a holistic and detailed small signal model of the entire system with the dynamics from both synchronous generators (SGs) and IBRs is derived. The effectiveness of the proposed work in adjusting the system small signal stability margin is validated by conducting case studies with varying penetration levels of IBRs. A test system with one SG and five inverters was implemented in MATLAB/Simulink to demonstrate the effectiveness of the proposed approach. Index Terms - grid-following control, grid-forming control, operation mode transition, small-signal stability analysis

grid-following control↗

Operational Technique for Transition of Several Types of V/Stol Aircraft

Flight test experience has been obtained with five test bed aircraft which employed widely differing principles of V/STOL operation. speeds these aircraft were supported by wing lift and in the hovering condition they were supported by engine-produced thrust. used to transfer the lift from the wing to the engine are examined. primary items considered in the transition region are longitudinal trim changes, stability , stalled flow during descending transitions, and the flexibility of the transition procedure of each type of aircraft.

Drinkwater, Fred J., III↗

Short-Term Prediction Research and Transition (SPoRT) Center: Transitioning Satellite Data to Operations

The Short-term Prediction Research and Transition (SPoRT) Center located at NASA Marshall Space Flight Center has been conducting testbed activities aimed at transitioning satellite products to National Weather Service operational end users for the last 10 years. SPoRT is a NASA/NOAA funded project that has set the bar for transition of products to operational end users through a paradigm of understanding forecast challenges and forecaster needs, displaying products in end users decision support systems, actively assessing the operational impact of these products, and improving products based on forecaster feedback. Aiming for quality partnerships rather than a large quantity of data users, SPoRT has become a community leader in training operational forecasters on the use of up-and-coming satellite data through the use of legacy instruments and proxy data. Traditionally, SPoRT has supplied satellite imagery and products from NASA instruments such as the Moderate-resolution Imaging Spectroradiometer (MODIS) and the Atmospheric Infrared Sounder (AIRS). However, recently, SPoRT has been funded by the GOES-R and Joint Polar Satellite System (JPSS) Proving Grounds to accelerate the transition of selected imagery and products to help improve forecaster awareness of upcoming operational data from the Visible Infrared Imager Radiometer Suite (VIIRS), Cross-track Infrared Sounder (CrIS), Advanced Baseline Imager (ABI), and Geostationary Lightning Mapper (GLM). This presentation provides background on the SPoRT Center, the SPoRT paradigm, and some example products that SPoRT is excited to work with forecasters to evaluate.

Zavodsky, Bradley↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Common Habitat for Long Duration Transit and Surface Operations

This concept is based on the Skylab II concept, which proposes using a SLS propellant tank as the primary structure of a habitat. Common Habitat takes this a step further, proposing an interior architecture that is equally viable as a lunar surface hab, transit hab, and Mars surface hab, thus enabling a single development to support all three long duration habitat roles. Common Habitat has been pursued by the PI and co-investigators at MSFC and other centers in a spare time / funding available basis, often with heavy student intern support. Student resources have developed preliminary concepts, but these models must be refined to reflect accurate vehicle subsystems, utilities, stowage, workstations, and other crew systems. This investigation applies NASA civil servant and contractor expertise to correct errors in the most recent student concepts in order to prepare them for future human-in-the-loop evaluations to determine the most viable configuration for a Common Habitat. In prior studies there was never an opportunity to trade both crew size and internal orientation. Prior work has been a series of point designs with inconsistent design constraints, making apples to apples comparisons impossible. The most recent student work produced CAD models of four habitat variants for future use in a trade study, but the student products contain model construction and geometry errors, inaccurate subsystems design and placement, and unrealistic structural elements and outfitting. These must be corrected before the models can be moved into a VR environment for humanin- the-loop testing. Through consultation with SMEs throughout the Agency, the fidelity of these designs will be upgraded to a level of quality sufficient to make a comparative analysis of crew size sensitivity and internal orientation. The product of this activity is four upgraded CAD models, each reflecting a different configuration of the Common Habitat. One is a horizontal configuration using the full length of the SLS LOX tank. One is a vertical configuration using the same tank dimensions. The third is a horizontal configuration using a truncated SLS LOX tank (half the barrel length). The fourth is a vertical configuration of the half-length SLS LOX tank.

Howard, Robert L.↗

Common Habitat for Long Duration Transit and Surface Operations

This concept is based on the Skylab II concept, which proposes using a SLS propellant tank as the primary structure of a habitat. Common Habitat takes this a step further, proposing an interior architecture that is equally viable as a lunar surface hab, transit hab, and Mars surface hab, thus enabling a single development to support all three long duration habitat roles. Common Habitat has been pursued by the PI and co- investigators at MSFC and other centers in a spare time / funding available basis, often with heavy student intern support. Student resources have developed preliminary concepts, but these models must be refined to reflect accurate vehicle subsystems, utilities, stowage, workstations, and other crew systems. This investigation applies NASA civil servant and contractor expertise to correct errors in the most recent student concepts in order to prepare them for future human-in-the-loop evaluations to determine the most viable configuration for a Common Habitat.

Howard, Robert L.↗

A Common Habitat Deep Space Exploration Vehicle for Transit and Orbital Operations

When outfitted as a habitat, the SLS Core Stage Liquid Oxygen Tank is a pressure vessel that can be used to support human exploration in deep space. An exploration spacecraft can be constructed with this habitat, known as the Common Habitat, as its central element. More than just a transit vehicle, this spacecraft is a Deep Space Exploration Vehicle – a microgravity science laboratory capable of conducting research with onboard human crews throughout the inner solar system. Supplied with propellant by LEO depots, preliminary trajectory and v estimates indicate that the spacecraft can perform fly-by or orbital missions with trajectories close enough to the sun to intersect the orbit of Mercury or far enough away to fly by the main belt asteroid Vesta. Its primary mission, however, is to support human expeditions to Mars. Many, though not all, of the pressurized and unpressurized elements that compose the Deep Space Exploration Vehicle can also be used in surface base camps on the Moon and Mars. In additional to traditional space science disciplines, the spacecraft offers unique potential for small asteroid retrieval and for artificial gravity research. Three launches are used to deploy the spacecraft, but thirty-nine launches are used to deliver propellant to orbit to fully fuel the spacecraft for deep space missions. Key operations in a Mars crewed mission are described to illustrate how the vehicle is used and forward work is listed to mature the spacecraft concept.

Robert L. Howard Jr.↗

Time recovery measurements using operational GOES and transit satellites

Results of regular monitoring of both the GOES and TRANSIT timing signals over a number of months at the National Bureau of Standards (NBS), Boulder, Colorado are presented. The TRANSIT results include an analysis of how received timing accuracy and stability are affected by: (1) averaging over varying numbers of satellite passes; (2) averaging over different combinations of the five available satellites; (3) using several independent receivers of the same type; and (4) application of published corrections to the received data. Based on monitoring experience to date at NBS, some pros and cons of using each of the available operational systems are discussed. Updated information on recent improvements incorporated into the GOES time code generation and monitoring system at Wallops Island, Virginia is also included.

Beehler, R. E.↗

The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

launch operations↗

Challenges for Transitioning Science Knowledge to an Operational Environment for Space Weather

Effectively transitioning science knowledge to an operational environment relevant to space weather is critical to meet the civilian and defense needs, especially considering how technologies are advancing and present evolving susceptibilities to space weather impacts. The effort to transition scientific knowledge to a useful application is not a research task nor is an operational activity, but an effort that bridges the two. Successful transitioning must be an intentional effort that has a clear goal for all parties and measureable outcome and deliverable. This talk will present proven methodologies that have been demonstrated to be effective for terrestrial weather and disaster relief efforts, and how those methodologies can be applied to space weather transition efforts.

Spann, James↗

Upwind second-order difference schemes and applications in unsteady aerodynamic flows

Explicit second-order upwind difference schemes in combination with spatially symmetric schemes can produce larger stability bounds and better numerical resolution than symmetric schemes alone. However, if conservation form is essential, a special operator is required for transition between schemes. An operational approach has been devised for deriving transition operators so that strict conservation and local consistency are maintained. Various aspects of hybrid schemes are studied numerically for model linear and nonlinear equations. To demonstrate the utility of combining two different algorithms, MacCormack's explicit, noncentered, second-order method is combined with a completely upwind version, and numerical solutions of the Euler equations are obtained for two-dimensional, transonic flows with embedded supersonic regions and shock waves. The general utility of the operational approach for combining schemes is emphasized by deriving a second-order conservative scheme for the steady transonic small-disturbance potential equation.

Warming, R. F.↗