A note on minimizing time assurance tests for repairable systems

We consider assurance testing for repairable systems when supplementary information is available in addition to the data collected in the assurance test. Here, the supplementary information is incorporated using a Bayesian inferential framework. Here we consider assurance testing for a homogeneous Poisson process. In this note we consider an alternative criterion that minimizes the test time while ensuring that the requirements on the producer's and consumer's risks are met. We illustrate the use of this alternative criterion with an example.

42 ENGINEERING↗

Evaluating Utility-Scale PV-Battery Hybrids in an Operational Model for the Bulk Power System

Systems that combine solar photovoltaic and battery energy storage technologies (PV-BES) are increasingly being proposed and deployed on the bulk power system. The operations and value of PV-BES systems have been extensively studied from the project developer's perspective through analyses that maximize plant-level revenue. However, PV-BES hybrids' operational characteristics are seldom studied from the perspective of bulk power system operators, who seek to optimize the performance of a suite of generation and storage assets that are connected via the transmission network. This work presents modeling approaches for representing and evaluating PV-BES hybrids in a model that optimizes operations across the bulk power system. Its novel contributions include demonstrating a technique to modify a unit commitment and dispatch model to represent the operational synergies of PV-BES hybrids. In particular, we describe the challenges and an approach for representing so-called DC-coupled PV-BES - which utilize a single bi-directional inverter - as a dispatchable resource in a commercial, production cost model (PCM), PLEXOS. We demonstrate this technique in a PCM study of the Los Angeles Department of Water and Power (LADWP) test system, by replacing existing PV and battery generators on the test system with our PV-BES hybrids. We then pursue scenario analysis that is designed to isolate the various drivers of operational strategies for DC-coupled PV-BES hybrids, including the nature of coupling, PV penetration on the system, and varying inverter loading ratios (or degrees of over-sizing of the PV field). Results from the analysis include utilization profiles for the PV DC energy across available pathways, dispatch profiles for the battery component, and the hybrid technologies' impacts on system-wide production costs. The approach presented in this paper can be used in any PCM that is looking to study PV-BES hybrids as a resource in different power system configurations and services.

14 SOLAR ENERGY↗

Virtual Agents-Based Attack-Resilient Distributed Control for Islanded AC Microgrid

Due to its dependence on a communication network, distributed secondary control of microgrids is susceptible to denial-of-service (DoS) attacks in channel shutdown mode, which may negatively impact the network connectivity and thus deteriorate the coordination and power sharing among distributed generators (DGs). Honeypot is a common method for cyber deception by introducing fake targets. However, in the context of microgrid, the misleading information spread by honeypots will also impact the system performance. This paper proposes an attack-resilient distributed control for AC microgrids utilizing virtual agents (VAs) to counteract both DoS edge and node attacks. The VAs are designed to not impact the system’s steady state during normal operation but to share information among neighboring real agents and serve as dummy targets for DoS attacks. The control with VAs is implemented by a primal-dual gradient based distributed algorithm to efficiently obtain a practical solution for voltage/frequency regulation and power sharing. The simulation results on a 4-DG test system and a modified IEEE 34-bus system show that 1) VAs do not impact the normal functionality of the test system, and 2) deploying VAs can enhance the resilience of the microgrid control against DoS edge and node attacks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Power System Black start using Inverter-Based Generation

Power system black start readiness is part of the system planning. Utility planners perform periodic studies to assess if their power system is capable of total restoration following a black out. Hydro and diesel generators are the most commonly used black start capable resources by power utilities. However, with increasing penetration of solar generation, inverter-based resources can be considered to provide black start capability. Since the solar inverters can be located at multiple locations throughout the power system, and in view of their unique characteristics, an optimal real-time capable plan is helpful for system operators for faster black start. Black start optimization is a multi stage mixed-integer non-linear optimization which is extremely hard to solve. In this paper, we propose an optimal black start methodology that is easier to solve and scalable in real-time. We demonstrate the proposed methodology on two test systems and illustrate how inverter-based resources can contribute and improve power system restoration.

power system restoration, blackstart, Inverter-bas↗

The WRF-Solar Ensemble Prediction System: Development, Test, and Validation

Providing reliable probabilistic solar radiation information is needed to improve management of the uncertainty and variability of solar generation. Thus, guidance on how to develop skillful and accurate ensemble forecasts is essential and it will ultimately contribute to integration of high amounts of solar energy on the grid. A team from the National Renewable Energy Laboratory and the National Center for Atmospheric Research had been collaborating to develop the WRF-Solar ensemble prediction system (WRF-Solar EPS) in the past three years to produce probabilistic solar irradiance forecasts and better predict solar energy by quantifying forecast uncertainty. The WRF-Solar EPS basically generates ensemble members for solar irradiance based on stochastic perturbations to provide intraday and day-ahead probabilistic forecasts. This study will present main research steps in developing the WRF-Solar EPS including: (a) tangent linear analysis for identifying key input variables of six WRF-Solar modules significantly related to predicting of cloud and solar irradiance, (b) combining stochastic perturbation technique with the WRF-Solar model, and (c) ensemble calibration method to decrease error and uncertainty of ensemble-based solar forecasts. The capability of WRF-Solar EPS is now updated to the most recent version of standard WRF model. This presentation will summarize comprehensive results from the evaluation of forecasts against the National Solar Radiation Data Base as well as ground-measured observations. Moreover, we will introduce the user's guide for WRF-Solar EPS (e.g., parameters to configure stochastic perturbations) and future extension of this research.

day-ahead forecast↗

Experimental Investigation on Heating Performance of a Cold Climate Thermoelectric-Assisted Heat Pump

To accelerate the electrification of air source heat pumps (ASHPs) in cold climates across the United States, various initiatives have been launched to enhance the effectiveness of ASHPs. One avenue of research involves incorporating thermoelectric (TE) technology into vapor compression refrigeration cycles. This study aims to assess the heating performance of a cold climate ASHP by employing TE modules as a liquid line subcooler. The tested system is a nominal 4.5-ton split heat pump utilizing R410A, equipped with a scroll compressor and an accumulator. An electronic expansion valve was employed for both cooling and heating modes. Two configurations of TE sub-coolers, one utilizing 2 TE bundles and the other 4 TE bundles, were integrated into the liquid line of the tested system. The heating performance of these configurations was evaluated. The results revealed that activating the TE subcooler led to a notable increase in total heat capacity, reaching 1318 W at -15.0 °C and 1164 W at -19.0 °C. The corresponding TE coefficients of performance (COPs) were 1.76 and 1.63, respectively. The activation of the TE sub-cooler resulted in a slight reduction in the overall system COP, with a decrease ranging from -2.6% to -4.2% for these two temperatures. The system COPs were measured at 2.10 and 1.86 for -15.0 °C and -19.0 °C, respectively. This prototype demonstrated a significant augmentation in heating capacity with a minimal sacrifice in COP.

Hu, Yifeng↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution system planners can use to prepare for future extreme events is to plan multiple microgrids which can use local generation as much as possible to supply critical loads. But partitioning an existing distribution system such that multiple feasible islands are planned and which are capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the network graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithm based approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, United States.

genetic algorithm↗

Identification of Intraday False Data Injection Attack on DER Dispatch Signals

The urgent need for the decarbonization of power grids has accelerated the integration of renewable energy. Concurrently, increasing distributed energy resources (DER) and advanced metering infrastructure (AMI) have transformed the power grids into a more sophisticated cyber-physical system with numerous communication devices. While these transitions provide economic and environmental value, they also impose increased risk of cyber attacks and operation al challenges. This paper investigates the vulnerabilit y of the power grids with high renewable penetration against an intraday false data injection (FDI) attack on DER dispatch signals and proposes a kernel support vector regression (SVR) based detection model as a countermeasure. The intraday FDI attack scenario and the detection model are demonstrated in a numerical experiment using the HCE 187-bus test system.

Kim, Jip↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Development of a Distribution Optimal Power Flow Federate for Open-Source OEDI-SI Platform

Increasing numbers of distributed generators in the electric power distribution networks require developing a control strategy to optimize solutions in real time. Linearized optimal distribution flow development has seen growth and acceptance in the distribution systems literature for efficiently modeling the \glspl{opf} for distribution systems. This paper examines the implementation and integration procedure for linearized optimal distribution flow federate to \gls{oedisi} platform. Specifically, we discuss i) the usage of the \gls{oedisi} platform, ii) obtaining a tractable solution using developed \gls{opf} federate, and iii) validation of solutions and bench-marking the \gls{oedisi} platform with developed \gls{opf} federate using OpenDSS. In brief, we demonstrate how a general linearized optimal distribution flow federate can be developed and integrated with a co-simulation environment to mimic real-world examples. The efficacy of the proposed method is demonstrated using the IEEE 123-bus test system under different scenarios to obtain a tractable solution and compare its results.

Sadnan, Rabayet↗

Control and Simulation of a Grid-Forming Inverter for Hybrid PV-Battery Plants in Power System Black Start

Power system restoration is an important part of system planning. Power utilities are required to maintain black start capable generators that can energize the transmission system and provide cranking power to non-blackstart capable generators. Traditionally, hydro and diesel units are used as black start capable generators. With the increased penetration of bulk size solar farms, inverter based generation can play an important role in faster and parallel black start thus ensuring system can be brought back into service without the conventional delays that can be expected with limited black start generators. Inverter-based photovoltaic (PV) power plants have advantages that are suitable for black start. This paper proposes the modeling, control, and simulation of a grid-forming inverter-based PV-battery power plant that can be used as a black start unit. The inverter control includes both primary and secondary control loops to imitate the control of a conventional synchronous machine. The proposed approach is verified using a test system modified from the IEEE 9-bus system in the time-domain electromagnetic transient simulation tool PSCAD. The simulation results shows voltage and frequency stability during a multi-step black-start and network energization process.

Nguyen, Quan H.↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Transient Stability Preventive Control via Tuning the Parameters of Virtual Synchronous Generators

This paper presents an optimal preventive control (OPC) method to improve the power system transient stability via tuning the transient parameter of virtual synchronous generators. The novelty of this work is that we formulate the preventive control as an optimization problem so that inverter parameters can be adjusted at the pre-contingency stage. A reinforcement learning (RL)-driven method is proposed to solve the OPC problem with the fault energy-based reward function. An ANDES-based RL environment is also developed. Versatile functions included in the proposed environment have been presented in this paper. The proposed OPC formulation, the RLdriven method, and the fault energy-based reward function are verified on several standard test systems.

Inverter-based resources, virtual synchronous gene↗

Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

How can independent system operators (ISOs) take advantage of probabilistic solar forecasts to lower generation costs and improve reliability of power systems? We discuss one three-step approach for doing so, focusing on how such forecasts might help the California Independent System Operator (CAISO) prepare unexpected net load ramps, where net load equals gross demand minus wind and solar production. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty reflected in the forecasted prediction intervals (independent variables) to error distributions for net load ramp forecasts for the CAISO real-time market (dependent variable) using machine learning and quantile regression. Projected ramp forecast errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Detailed descriptions are provided on the quantile regression and kth-nearest neighbor categorization methods for accomplishing that translation. Finally, a multiple time-scale look-ahead market simulation model is applied to a 118-bus IEEE Reliability Test System, modified to represent the CAISO generation mix and demand distributions. The model runs quantify how solar-conditioned ramp requirements can, first, decrease operating costs by reducing requirements compared to often conservative unconditional methods and, second, decrease generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. Solar-conditioned ramp requirements are found to reduce generation operating costs by about 2% for the test system (which would be equivalent to over $\$100$ million per year for a CAISO-size system).

14 SOLAR ENERGY↗

Impacts of hybridization and forecast errors on the probabilistic capacity credit of batteries

Battery storage is increasingly identified as being among the least-cost mix of technologies in the evolving U.S. electricity mix. This study explores the marginal capacity credit of batteries using a probabilistic, reliability-based, effective firm capacity method, which we apply for multiple battery power ratings, durations, coupling types, deployment locations, and dispatch profiles within a test system that is based on the Texas Interconnection in the year 2024. We find that the capacity credits for all battery durations depend on their ability to predict the timing of reliability events. Even 1-2 h forecast errors - resulting in early or delayed battery discharging relative to the onset of a reliability event - lead pronounced capacity credit reductions, especially for 4-h duration batteries. Coupling batteries with solar mitigates the uncertainty associated with a shorter-duration battery's availability during reliability events, primarily due to the relatively high solar capacity credit in our test system. Coupled (or hybrid) system designs with oversized solar arrays, the ability to charge the coupled battery with grid energy, and larger batteries lead to the greatest capacity credit benefits of hybridization. We do not see evidence that the hybrid capacity credit exceeds the sum of the separate battery and solar capacity credits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Latent Neural ODE for Integrating Multi-Timescale Measurements in Smart Distribution Grids

Under a smart grid paradigm, there has been an increase in sensor installations to enhance situational awareness. The measurements from these sensors can be leveraged for real-time monitoring, control, and protection. However, these measurements are typically irregularly sampled. These measure-ments may also be intermittent due to communication bandwidth limitations. To tackle this problem, this paper proposes a novel latent neural ordinary differential equations (LODE) approach to aggregate the unevenly sampled multivariate time-series measurements. The proposed approach is flexible in performing both imputations and predictions while being computationally efficient. Simulation results on IEEE 37 bus test systems illustrate the efficiency of the proposed approach.

multi time-scale measurements↗

Solving Unit Commitment Problems with Demand Responsive Loads

This work focuses on using variations of the Frank-Wolfe (FW) algorithm for solving unit commitment problems with high volumes of demand responsive loads on the power grid. We present a formulation of the unit commitment problem with demand responsive loads. We then show through reformulation and relaxations of the problem that variations of the Frank-Wolfe algorithm can be used to determine the time series decisions for the demand responsive loads. We show through computational experiments on the IEEE Reliability Test System that the timeseries of demand responsive load decisions obtained through our approach are near optimal and describe how large-scale parallel implementations of our approach can be highly computationally efficient.

demand response↗

Use of Grid-Forming Medium-Voltage Power Electronics Hub in a Microgrid Setting: Preprint

This paper presents the application of a new design of a multiport, modular, medium-voltage power electronics hub (M3PE-HUB) in a microgrid setting. The M3PE-HUB system was modeled in a digital real-time simulator (DRTS) and integrated into the Banshee microgrid test system. This paper presents the preliminary DRTS simulation-based results of the M3PE- HUB system connected in a test microgrid system. Verification and validation of the M3PE-HUB architecture and controls in the test microgrid setting are the primary contributions of this work. The results of the operation during the islanding and resynchronization process indicate the feasibility of the proposed architecture in a microgrid setting. This paper also presents results for a system reconfiguration use case where the M3PE- HUB was used to reconfigure the system under a fault condition.

grid forming↗