Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Experience and Challenges in Implementing Stratospheric Aerosol Gas Experiment on Meteor-3M Platform

Implementation of Stratospheric Aerosol Gas Experiment (SAGE) is a joint science mission between the Rosavioskosmos, also called Russian Aviation and Space Agency (RASA) and the National Aeronautics and Space Administration (NASA). Under the global collaboration agreement established by President Clinton and Yeltsin in 1995 between the United States and Russia, space was one of the major areas identified for joint scientific collaboration. There were several collaborative projects identified under space, earth, human exploration of space and aeronautics. SAGE was one of the key Earth Science instruments selected common to both countries' interests in ozone research. SAGE has a long space heritage, and four earlier versions of this instrument have flown in space for the last 15-year period. It has provided a vital ozone and aerosol data in the mid latitudes and has contributed in the overall ozone depletion research. SAGE II, the fourth instrument has been flying in space on NASA's Earth Radiation Budget Satellite (ERBS) for the last 14 years. Ball Aerospace built the instrument under Langley Research Center's (LaRC) management. SAGE III for Russian Meteor-3M mission is a third generation design with more spectral bands, elaborate data gathering and storage and intelligent terrestrial software. The Russian collaboration required a complete integration of SAGE III on the Russian Meteor-3M satellite and a launch on a Zenit-2 launch vehicle manufactured in Ukraine. The whole complex is scheduled to be launched from Baikonur cosmodrome in early 2001. This cooperative mission has presented a number of management, technical and logistical challenges on both sides. This paper makes an attempt to review and document such experiences.

Habib, Shahid↗

Use of System Safety Risk Assessments for the Space Shuttle Reusable Solid Rocket Motor (RSRM)

This paper discusses the System Safety approach used to assess risk for the Space Shuttle Reusable Solid Rocket Motor (RSRM). Previous to the first RSRM flight in the fall of 1988, all systems were analyzed extensively to assure that hazards were identified, assessed and that the baseline risk was understood and appropriately communicated. Since the original RSRM baseline was established, Thiokol and NASA have implemented a number of initiatives that have further improved the RSRM. The robust design, completion of rigorous testing and flight success of the RSRM has resulted in a wise reluctance to make changes. One of the primary assessments required to accompany the documentation of each proposed change and aid in the decision making process is a risk assessment. Documentation supporting proposed changes, including the risk assessments from System Safety, are reviewed and assessed by Thiokol and NASA technical management. After thorough consideration, approved changes are implemented adding improvements to and reducing risk of the Space Shuttle RSRM.

Greenhalgh, Phillip O.↗

Tools and Techniques for Evaluating the Effects of Maintenance Resource Management (MRM) in Air Safety

This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.

Taylor, James C.↗

Gravity Probe B: Testing Einstein with Gyroscopes

Some 40 years in the making, NASA' s historic Gravity Probe B (GP-B) mission is scheduled to launch aboard a Delta II in 2003. GP-B will test two extraordinary predictions from Einstein's General Relativity: geodetic precession and the Lense-Thirring effect (frame-dragging). Employing tiny, ultra-precise gyroscopes, GP-B features a measurement accuracy of 0.5 milli-arc-seconds per year. The extraordinary measurement precision is made possible by a host of breakthrough technologies, including electro-statically suspended, super-conducting quartz gyroscopes; virtual elimination of magnetic flux; a solid quartz star tracking telescope; helium microthrusters for drag-free control of the spacecraft; and a 2400 liter superfluid helium dewar. This paper will provide an overview of the science, key technologies, flight hardware, integration and test, and flight operations of the GP-B space vehicle. It will also examine some of the technical management challenges of a large-scale, technology-driven, Principal Investigator-led mission.

Geveden, Rex D.↗

Gravity Probe B: Testing Einstein with Gyroscopes

Some 40 years in the making, NASA s historic Gravity Probe B (GP-B) mission is scheduled to launch aboard a Delta I1 in 2003. GP-B will test two extraordinary predictions from Einstein s General Relativity: geodetic precession and the Lense-Thirring effect (frame-dragging). Employing tiny, ultra-precise gyroscopes, GP-B features a measurement accuracy of 0.5 milli-arc-seconds per year. The extraordinary measurement precision is made possible by a host of breakthrough technologies, including electro-statically suspended, super-conducting quartz gyroscopes; virtual elimination of magnetic flux; a solid quartz star- tracking telescope; helium microthrusters for drag-free control of the spacecraft; and a 2400 liter superfluid helium dewar. This paper will provide an overview of the science, key technologies, flight hardware, integration and test, and flight operations of the GP-B space vehicle. It will also examine some of the technical management challenges of a large-scale, technology-driven, Principal Investigator-led mission.

Geveden, Rex D.↗

Understanding and Improving High-Performance I/O Subsystems

This research program has been conducted in the framework of the NASA Earth and Space Science (ESS) evaluations led by Dr. Thomas Sterling. In addition to the many important research findings for NASA and the prestigious publications, the program has helped orienting the doctoral research program of two students towards parallel input/output in high-performance computing. Further, the experimental results in the case of the MasPar were very useful and helpful to MasPar with which the P.I. has had many interactions with the technical management. The contributions of this program are drawn from three experimental studies conducted on different high-performance computing testbeds/platforms, and therefore presented in 3 different segments as follows: 1. Evaluating the parallel input/output subsystem of a NASA high-performance computing testbeds, namely the MasPar MP- 1 and MP-2; 2. Characterizing the physical input/output request patterns for NASA ESS applications, which used the Beowulf platform; and 3. Dynamic scheduling techniques for hiding I/O latency in parallel applications such as sparse matrix computations. This study also has been conducted on the Intel Paragon and has also provided an experimental evaluation for the Parallel File System (PFS) and parallel input/output on the Paragon. This report is organized as follows. The summary of findings discusses the results of each of the aforementioned 3 studies. Three appendices, each containing a key scholarly research paper that details the work in one of the studies are included.

El-Ghazawi, Tarek A.↗

Report from the School of Experience: Lessons-Learned on NASA's EOS/ICESat Mission

Abstract-NASA s Earth Observing System EOS) Ice, Cloud, and Land Elevation Satellite (ICESat) mission was one of the first missions under Goddard Space Flight Center s (then-) new Rapid Spacecraft Development Office. This paper explores the lessons-learned under the ICESat successful implementation and launch, focusing on four areas: Procurement., Management, Technical, and Launch and Early Operations. Each of these areas is explored in a practical perspective of communication, the viewpoint of the players, and the interactions among the organizations. Conclusions and lessons-learned are summarized in the final section.

Anselm, William↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

Monell, Donald W.↗

Mothers of Invention: Hubble Engineers Push Robotic 'Evolution' to Save Telescope, Enable New Exploration

Robotic technology being developed out of necessity to keep the Hubble Space Telescope operating could also lead to new levels of man-machine team-work in deep-space exploration down the road-if it survives the near-term scramble for funding. Engineers here who have devoted their NASA careers to the concept of humans servicing the telescope in orbit are planning modifications to International Space Station (ISS) robots that would leave the humans on the ground. The work. forced by post-Columbia flight rules that killed a planned shuttle-servicing mission to Hubble, marks another step in the evolution of robot-partners for human space explorers. "Hubble has always been a pathfider for this agency," says Mike Weiss. Hubble deputy program manager technical. "When the space station was flown and assembled, Hubble was the pathfinder. not just for modularity, but for operations, for assembly techniques. Exploration is the next step. Things we're going to do on Hubble are going to be applied to exploration. It's not just putting a robot in space. It's operating a robot in space. It's adapting that robot to what needs to be done the next time you're up there."

Morring, Frank, Jr.↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Human Systems Integration (HSI) Case Studies from the NASA Constellation Program

The National Aeronautics and Space Administration (NASA) Constellation Program is responsible for planning and implementing those programs necessary to send human explorers back to the moon, onward to Mars and other destinations in the solar system, and to support missions to the International Space Station. The Constellation Program has the technical management responsibility for all Constellation Projects, including both human rated and non-human rated vehicles such as the Crew Exploration Vehicle, EVA Systems, the Lunar Lander, Lunar Surface Systems, and the Ares I and Ares V rockets. With NASA s new Vision for Space Exploration to send humans beyond Earth orbit, it is critical to consider the human as a system that demands early and continuous user involvement, inclusion in trade offs and analyses, and an iterative "prototype/test/ redesign" process. Personnel at the NASA Johnson Space Center are involved in the Constellation Program at both the Program and Project levels as human system integrators. They ensure that the human is considered as a system, equal to hardware and software vehicle systems. Systems to deliver and support extended human habitation on the moon are extremely complex and unique, presenting new opportunities to employ Human Systems Integration, or HSI practices in the Constellation Program. The purpose of the paper is to show examples of where human systems integration work is successfully employed in the Constellation Program and related Projects, such as in the areas of habitation and early requirements and design concepts.

Baggerman, Susan↗

Alvin (Al) Sieff: Thoughts About and Lessons from a Great Engineer

Alvin (Al) Seiff was known as a world-class atmospheric scientist during the last three decades of his life. Equally deserving, however, were his prior achievements as an innovative engineer, an exceptional technical manager, and a mentor of young engineers at NASA Ames Research Center. This paper outlines Al's role in developing Ames ballistic range facilities, probably the most advanced in the world at that time, and his seminal 1963 report that contained the concepts used to reconstruct the atmospheres of Mars, Venus, Jupiter and Titan. Also discussed is my affiliation with Al after he hired me in 1962, including our joint work on Mars missions and investigating the feasibility that a Jupiter probe could survive entry, work that eventually led to the development of the Galileo probe. Finally, suggestions are offered for speeding the analysis and design of thermal protection systems based on lessons learned from successful probes and landers.

Tauber, Michael↗

NASA System Engineering Design Process

This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.

Roman, Jose↗

Bootstrapping Process Improvement Metrics: CMMI Level 4 Process Improvement Metrics in a Level 3 World

The measurement techniques for organizations which have achieved the Software Engineering Institutes CMMI Maturity Levels 4 and 5 are well documented. On the other hand, how to effectively measure when an organization is Maturity Level 3 is less well understood, especially when there is no consistency in tool use and there is extensive tailoring of the organizational software processes. Most organizations fail in their attempts to generate, collect, and analyze standard process improvement metrics under these conditions. But at JPL, NASA's prime center for deep space robotic exploration, we have a long history of proving there is always a solution: It just may not be what you expected. In this paper we describe the wide variety of qualitative and quantitative techniques we have been implementing over the last few years, including the various approaches used to communicate the results to both software technical managers and senior managers.

Hihn, Jairus↗

EOS Aura Mission Status

This PowerPoint presentation will discuss EOS Aura mission and spacecraft subsystem summary, recent and planned activities, inclination adjust maneuvers, propellant usage lifetime estimate. Eric Moyer, ESMO Deputy Project Manager-Technical (code 428) has reviewed and approved the slides on April 30, 2015.

propellant usage↗

International Earth Science Constellation Mission Operations Working Group September 27-29, 2016 Aqua Spring 2017 IAM Series

This Aqua Spring 2017 IAM Series powerpoint presentation will be presented at the MOWG meeting in Albuquerque, NM. Topics to be discussed are: recap Aqua 2016 IAM campaign maneuver results and post 2016 IAM MLT evolution; current DMU strategy; 2017 IAM campaign dates and planning; Aqua latest lifetime MLT team predictions. Susan Good is a contractor who supports David Tracewell in code 595 therefore this is being routed through 595. Eric Moyer, ESMO Deputy Project Manager-Technical has reviewed and approved this presentation.

Constellation↗

Challenges with Electrical, Electronics, and Electromechanical Parts for James Webb Space Telescope

James Webb Space Telescope (JWST) is the space-based observatory that will extend the knowledge gained by the Hubble Space Telescope (HST). Hubble focuses on optical and ultraviolet wavelengths while JWST focuses on the infrared portion of the electromagnetic spectrum, to see the earliest stars and galaxies that formed in the Universe and to look deep into nearby dust clouds to study the formation of stars and planets. JWST, which commenced creation in 1996, is scheduled to launch in 2018. It includes a suite of four instruments, the spacecraft bus, optical telescope element, Integrated Science Instrument Module (ISIM, the platform to hold the instruments), and a sunshield. The mass of JWST is approximately 6200 kg, including observatory, on-orbit consumables and launch vehicle adaptor. Many challenges were overcome while providing the electrical and electronic components for the Goddard Space Flight Center hardware builds. Other difficulties encountered included developing components to work at cryogenic temperatures, failures of electronic components during development and flight builds, Integration and Test electronic parts problems, and managing technical issues with international partners. This paper will present the context of JWST from a EEE (electrical, electronic, and electromechanical) perspective with examples of challenges and lessons learned throughout the design, development, and fabrication of JWST in cooperation with our associated partners including the Canadian Space Agency (CSA), the European Space Agency (ESA), Lockheed Martin and their respective associated partners. Technical challenges and lessons learned will be discussed.

EEE Parts↗

Mission Status for Earth Science Constellation MOWG Meeting @ Sioux Falls SD EOS Aura

This presentation provides mission operations status for the Earth Observing System (EOS) Aura satellite for the past six-months (December 2017 through May 2018). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting at the USGS EROS Data Center in Sioux Falls, South Dakota on Wednesday, June 12, 2018. These meetings have been occurring twice a year since the MOWG was formed in 2003. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager Technical.

Aura satellite↗