Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “systemic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Use of System Safety Risk Assessments for the Space Shuttle Reusable Solid Rocket Motor (RSRM)

This paper discusses the System Safety approach used to assess risk for the Space Shuttle Reusable Solid Rocket Motor (RSRM). Previous to the first RSRM flight in the fall of 1988, all systems were analyzed extensively to assure that hazards were identified, assessed and that the baseline risk was understood and appropriately communicated. Since the original RSRM baseline was established, Thiokol and NASA have implemented a number of initiatives that have further improved the RSRM. The robust design, completion of rigorous testing and flight success of the RSRM has resulted in a wise reluctance to make changes. One of the primary assessments required to accompany the documentation of each proposed change and aid in the decision making process is a risk assessment. Documentation supporting proposed changes, including the risk assessments from System Safety, are reviewed and assessed by Thiokol and NASA technical management. After thorough consideration, approved changes are implemented adding improvements to and reducing risk of the Space Shuttle RSRM.

Greenhalgh, Phillip O.↗

Capability for Integrated Systems Risk-Reduction Analysis

NASA's Human Research Program (HRP) is working to increase the likelihoods of human health and performance success during long-duration missions, and subsequent crew long-term health. To achieve these goals, there is a need to develop an integrated understanding of how the complex human physiological-socio-technical mission system behaves in spaceflight. This understanding will allow HRP to provide cross-disciplinary spaceflight countermeasures while minimizing resources such as mass, power, and volume. This understanding will also allow development of tools to assess the state of and enhance the resilience of individual crewmembers, teams, and the integrated mission system. We will discuss a set of risk-reduction questions that has been identified to guide the systems approach necessary to meet these needs. In addition, a framework of factors influencing human health and performance in space, called the Contributing Factor Map (CFM), is being applied as the backbone for incorporating information addressing these questions from sources throughout HRP. Using the common language of the CFM, information from sources such as the Human System Risk Board summaries, Integrated Research Plan, and HRP-funded publications has been combined and visualized in ways that allow insight into cross-disciplinary interconnections in a systematic, standardized fashion. We will show examples of these visualizations. We will also discuss applications of the resulting analysis capability that can inform science portfolio decisions, such as areas in which cross-disciplinary solicitations or countermeasure development will potentially be fruitful.

Mindock, J.↗

Screening Analysis for the Environmental Risk Evaluation System Fiscal Year 2011 Report Environmental Effects of Offshore Wind Energy

Potential environmental effects of offshore wind (OSW) energy development are not well understood, and yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between OSW installations and avian and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. During FY 2011, Pacific Northwest National Laboratory (PNNL) scientists adapted and applied the Environmental Risk Evaluation System (ERES), first developed to examine the effects of marine and hydrokinetic energy devices on aquatic environments, to offshore wind development. PNNL scientists conducted a risk screening analysis on two initial OSW cases: a wind project in Lake Erie and a wind project off the Atlantic coast of the United States near Atlantic City, New Jersey. The screening analysis revealed that top-tier stressors in the two OSW cases were the dynamic effects of the device (e.g., strike), accidents/disasters, and effects of the static physical presence of the device, such as alterations in bottom habitats. Receptor interactions with these stressors at the highest tiers of risk were dominated by threatened and endangered animals. Risk to the physical environment from changes in flow regime also ranked high. Peer review of this process and results will be conducted during FY 2012. The ERES screening analysis provides an assessment of the vulnerability of environmental receptors to stressors associated with OSW installations; a probability analysis is needed to determine specific risk levels to receptors. As more data become available that document effects of offshore wind farms on specific receptors in U.S. coastal and Great Lakes waters, probability analyses will be performed.

Environmental Effects↗

Managing Programmatic Risk for Complex Space System Developments

Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

Panetta, Peter V.↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probabilistic physics of failure approach to fusion systems & Risk-efficiency optimization of nuclear co-generation [Slides]

An overview of the progress made towards two separate summer internship projects: a probabilistic physics of failure approach to fusion systems and a risk efficiency optimization of nuclear co-generation. Original version summarized the progress through end of June, and the revision version summarizes the progress through the entire internship to August 1st.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Non-GEO mobile satellite systems: A risk assessment

Since 1991, The MITRE Corporation has performed several independent evaluations of proposed mobile satellite service (MSS) systems that would operate from low Earth orbit (LEO) or medium Earth orbit (MEO), also known as intermediate circular orbit (ICO). This paper introduces a top level Risk Taxonomy tailored to summarize the technical and programmatic risks that MITRE has identified. In general, as risks are identified and addressed, a system's technical characteristics, cost and schedule are affected. This paper traces changes in three key parameters - satellite launch mass, system cost, and system schedule - for each of the five original non-GEO MSS systems for which license applications were made to the U.S. Federal Communications Commission (FCC) from November 1990 until June 1991. Finally, specific risk areas are identified using the Risk Taxonomy as a framework for discussion.

Gaffney, Leah M.↗

A behavioral theory of insider-threat risks : a system dynamics approach.

The authors describe a behavioral theory of the dynamics of insider-threat risks. Drawing on data related to information technology security violations and on a case study created to explain the dynamics observed in that data, the authors constructed a system dynamics model of a theory of the development of insider-threat risks and conducted numerical simulations to explore the parameter and response spaces of the model. By examining several scenarios in which attention to events, increased judging capabilities, better information, and training activities are simulated, the authors theorize about why information technology security effectiveness changes over time. The simulation results argue against the common presumption that increased security comes at the cost of reduced production.

97 MATHEMATICS AND COMPUTING↗

Weapon Systems Risk-Assessment Tool Review

To anticipate, and potentially mitigate, future problems in aging weapon systems, four unique riskassessment techniques were analyzed, including root-cause analysis tools, six-sigma problemsolving approaches, and lean six-sigma tools. Identifying the most efficient process, or tool, is crucial for successful application to current and future weapon systems, subsystems, and components. The following processes were reviewed: Fault Tree Analysis, Failure Modes and Effects Analysis, Bow-Tie Analysis, and Hazard and Operability Study. A systematic assessment was performed to determine the most desirable method, and included investigating qualitative versus quantitative characteristics, scope, process durations, advantages, and limitations. Presented results will outline the study findings and further illustrate a capacity to identify future issues and/or concerns, and ultimately, reduce risk.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Component Reliability R&D

A review of the work done on the hydrogen Component Reliability R&D project in the last year. The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems through the use of use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA).

component↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

Machine Learning for the Validation of Expert-Elicited Causal Risk Diagrams

Exposure to spaceflight poses risk to human health in complex ways. To help manage this risk, the Human Systems Risk Board (HSRB) at the National Aeronautics and Space Administration (NASA) maintains a set of causal diagrams that attempt to explain how spaceflight hazards generate health risks and lead to adverse outcomes both in-mission, immediately post-mission, and over the long term. These causal risk diagrams are formulated as directed acyclic graphs (DAGs) and can function as knowledge graphs of connected risks and outcomes. These DAGs have proven useful for communication, and, through network analysis, have allowed for the identification of structurally important factors in the risk network. However, the utility these DAGs provide is directly proportional to their verisimilitude, making assessment of this trait using empirical data – whether from actual human spaceflight or various spaceflight analogue exposures and model organisms – a high priority. In this research we explore the use of machine learning algorithms to learn DAG structure from empirical data as a means of evaluating human-elicited DAG structures. To do so, we test several different graph structure-learning algorithms on data concerning changes in the bones of rats and mice after exposure to either spaceflight or a spaceflight analogue. We explore potential methods for indexing the similarity between each algorithm’s output DAG with all the others and with that of the expert-elicited DAG. We discuss next steps in this ongoing line of research and open science initiatives underway to complete them.

directed acyclic graphs↗

Requirements based system level risk modeling

The problem that we address in this paper is assessing the expected degree of success of the system or mission based on the degree to which each requirement is satisfied and the relative weight of the requirements.

risk↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Requirements based system level risk modeling

The problem that we address in this paper is assessing the expected degree of success of the system or mission based on the degree to which each requirement is satisfied and the relative weight of the requirements.

risk dependency probability requirement↗