Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Understanding Competing Risks

Highlights: • Clinicians and researchers need to be cognizant of competing risks (ie, the occurrence of an event that precludes future development of the outcome of interest). • Censoring is appropriate when a patient being censored at a particular time (eg, owing to loss to follow-up) is deemed to have approximately the same future risk of developing the outcome of interest as patients still being followed, and when the reason for censoring is not related to events of interest. • Censoring is not appropriate in many scenarios; for example, a dead patient can never develop a future cancer recurrence or late effect. • Kaplan-Meier (KM) analysis is commonly used for a time-to-event analysis when the primary outcome (eg, overall survival) has no meaningful competing risk and censoring is appropriate. Cox proportional hazards modeling can be used for multivariable analysis to examine the association between covariates and the primary outcome. • In the presence of competing events, incorrect use of the KM analysis will likely lead to an overestimation of the risk of the outcome of interest and biased estimates from both univariable and multivariable analyses. Therefore, KM usually should not be used to determine local recurrence risk because humanity is always at risk for dying, which is a competing risk. • A competing risk analysis is therefore most appropriate when there are competing events to the primary outcome of interest. The most commonly used multivariable model in these situations is the Fine-Gray model. • Many fundamental questions in radiation oncology—local and regional recurrence, treatment-related toxicity—are best addressed using competing risk methodologies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Overview and Recommendations for Cyber Risk Assessment in Nuclear Power Plants

Digital instrumentation and control (I&C) systems are being deployed in nuclear power plants (NPPs) for both existing and advanced reactor designs. As I&C systems become more digitized to allow features like near autonomous control and remote operation, they introduce greater cyber risk to NPPs. Cyberattacks targeting industrial control systems (ICSs) are growing in both qualities and capabilities, which indicates that cybersecurity needs to be an integral part of risk assessment in the industry. Although there are some risk assessment methods in traditional information technology (IT) cybersecurity, the differences between IT and ICS cybersecurity make it infeasible to apply these risk assessment methods directly to ICSs. Some research has focused on risk assessment methods for ICSs, but few studies focus on applications to NPPs. Ideal risk frameworks for the nuclear industry are dynamic and account for system dependencies; this survey review focuses on such risk assessment methods both in and outside the nuclear field. In this article, the major challenges in cybersecurity risk assessment research are pointed out, and further research suggestions and considerations for cyber risk assessment in I&C systems are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Understanding the compound flood risk along the coast of the contiguous United States

Abstract. Compound flooding is a type of flood event caused by multiple flood drivers. The associated risk has usually been assessed using statistics-based analyses or hydrodynamics-based numerical models. This study proposes a compound flood (CF) risk assessment (CFRA) framework for coastal regions in the contiguous United States (CONUS). In this framework, a large-scale river model is coupled with a global ocean reanalysis dataset to (a) evaluate the CF exposure related to the coastal backwater effects on river basins, and (b) generate spatially distributed data for analyzing the CF hazard using a bivariate statistical model of river discharge and storm surge. The two kinds of risk are also combined to achieve a holistic understanding of the continental-scale CF risk. The estimated CF risk shows remarkable inter- and intra-basin variabilities along the CONUS coast with more variabilities in the CF hazard over the US west and Gulf coastal basins. Different risk assessment methods present significantly different patterns in a few key regions such as the San Francisco Bay area, the lower Mississippi River, and Puget Sound. Our results highlight the need to weigh different CF risk measures and avoid using single statistics-based or hydrodynamics-based CFRAs. Uncertainty sources in these CFRAs include the use of gauge observations, which cannot account for the flow physics or resolve the spatial variability of risks, and underestimations of the flood extremes and the dependence of CF drivers in large-scale models, highlighting the importance of understanding the CF risks for developing a more robust CFRA.

54 ENVIRONMENTAL SCIENCES↗

Risk‐based, response‐adapted therapy for early‐stage extranodal nasal‐type NK /T‐cell lymphoma in the modern chemotherapy era: A China Lymphoma Collaborative Group study

Abstract We aimed to determine the survival benefits of chemotherapy (CT) added to radiotherapy (RT) in different risk groups of patients with early‐stage extranodal nasal‐type NK/T‐cell lymphoma (ENKTCL), and to investigate the risk of postponing RT based on induction CT responses. A total of 1360 patients who received RT with or without new‐regimen CT from 20 institutions were retrospectively reviewed. The patients had received RT alone, RT followed by CT (RT + CT), or CT followed by RT (CT + RT). The patients were stratified into different risk groups using the nomogram‐revised risk index (NRI). A comparative study was performed using propensity score‐matched (PSM) analysis. Adding new‐regimen CT to RT (vs RT alone) significantly improved overall survival (OS, 73.2% vs 60.9%, P < .001) and progression‐free survival (PFS, 63.5% vs 54.2%, P < .001) for intermediate‐risk/high‐risk patients, but not for low‐risk patients. For intermediate‐risk/high‐risk patients, RT + CT and CT + RT resulted in non‐significantly different OS (77.7% vs 72.4%; P = .290) and PFS (67.1% vs 63.1%; P = .592). For patients with complete response (CR) after induction CT, initiation of RT within or beyond three cycles of CT resulted in similar OS (78.2% vs 81.7%, P = .915) and PFS (68.2% vs 69.9%, P = .519). For patients without CR, early RT resulted in better PFS (63.4% vs 47.6%, P = .019) than late RT. Risk‐based, response‐adapted therapy involving early RT combined with CT is a viable, effective strategy for intermediate‐risk/high‐risk early‐stage patients with ENKTCL in the modern treatment era.

Qi, Shu‐Nan↗

A Method for Evaluating and Tracking Production-Sample Test (PST) Delay Risk

This report describes a method for evaluating risk from delayed Production Sample Testing (PST), and strategies for reducing test backlogs. Risk contributions to overall risk from delayed PST include a Steady State Risk (SSR) contribution that is inherent in the qualified design and manufacturing processes, and a Non-Homogenous Production Risk (NHPR) contribution from production variation. Both definitions and evaluation techniques for these risk contributions are provided along with correlation to the standard Quality Assurance Process, QA001.2, risk ranking matrix. Methods for tracking test backlogs, and reducing backlogs are also discussed. The delayed PST evaluation method described here includes the merger of both slightly quantitative methods for tracking defect levels and the propensity for production variation with general risk management tracking tools like the likelihood vs. consequence risk ranking matrix. This merger is important because it allows more effective evaluation and communication with regards to delayed PST.

42 ENGINEERING↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decorrelating effects in multiple linear regression to decompose and attribute risk to common and proper effects

Effects in multiple linear regression may be decorrelated to decompose and attribute risk to common and proper effects. In other words, an attribute risk may be decomposed to two or more causes, where each cause is characterized by multiple attributes. The risk decomposition may decompose risk into a first residual part associated with a first set of risk factors, a second residual part associated with a second set of risk factors, and a common part associated with a set of common hidden variables that minimize a correlation between the first set of factors and the second set of factors. The common hidden variables may be modeled using a hidden factor model. An effect of the correlation may be minimized on the first set of risk factors and the second set of risk factors, and how correlated the terms of the risk decomposition are may be quantified.

97 MATHEMATICS AND COMPUTING↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Considerations of Transitioning CO2-EOR Field to CO2 storage Field: Case Study

In the United States (U.S.), carbon dioxide (CO2) injection wells at EOR sites are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. A CO2-EOR facility considering a transitioning from tertiary oil recovery to injecting CO2 for the primary purpose of long-term storage is required to obtain a Class VI permit where this transition poses an increased risk to underground sources of drinking water. This study considers how transitioning operations from CO2-EOR to storage can impact reservoir plume and pressure transient in the storage envelope, and how these changes could impact area of review and potential unwanted fluid migration. We developed a case study to assess subsurface response and leakage risks associated with a representative, hypothetical operation in a carbonate reservoir. This reservoir transitions from tertiary hydrocarbon recovery to dedicated GCS. Reservoir simulations were run for a set of credible CO2-EOR scenarios to estimate distributions of fluids phases and pressures throughout the model domain after CO2 flooding as well as forecasting the behavior of the reservoir after the transition to a dedicated storage phase. The evolutions from all simulated scenarios were used as the basis for leakage risk quantification using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM) with a novel reduced-order model to estimate time-dependent leakage of CO2, brine, and hydrocarbon fluids through potentially leaky wells. Results include a description of reservoir response, an estimate of the areal extent that could potentially be impacted by leakage to underground sources of drinking water, and estimates of the magnitude of potential leakage. Considerations for dedicated storage injection well selection, injectivity, and injection scheme performance and potential leakage risk are presented, with implications for risk assessment of well transition discussed. This study presents a risk-based workflow for the Class II to Class VI well transition. Integrating credible numerical simulation of viable CO2-EOR to dedicated CO2 storage with quantitative risk assessment tools, such as the NRAP-Open-IAM, will provide a valuable means to devise operational scenarios and inform decision-making related to storage benefit, leakage risk, and liability. Presented at the SPE/AAPG/SEG Carbon Capture Utilization and Storage Conference in Houston, TX, March 11-13, 2024.

Liu, Guoxiang↗

Implementing an Objectives-Driven, Risk-Informed, and Case-Assured Approach to Safety and Mission Success at NASA

NASA is developing a “Standard for Assurance of Space Flight Safety and Mission Success” that implements an objectives-driven, risk-informed, and case-assured approach to safety and mission success (S&MS) for NASA space flight programs and projects. The standard aligns with the philosophy of risk leadership that has recently been established in NASA policy to assure acceptable levels of flight crew safety and mission success risk. It is consistent with existing NASA risk management requirements and is compatible with NASA program management and systems engineering requirements. The methodology described in the standard is presented in terms of an S&MS assurance framework that is designed to allow substantial flexibility in the specific means by which programs and projects achieve acceptable mission S&MS risk. Such flexibility is necessary to accommodate the increasingly broad range of acquisition strategies employed by NASA, including commercial transportation services, as well as to accommodate the increasingly rapid evolution of space flight-related technologies and practices. A key feature of the S&MS assurance framework is the specification of S&MS success criteria for each life-cycle review (LCR). The S&MS assurance case is structured around these criteria, the satisfaction of which indicates that the program/project is adhering to the S&MS risk posture. This enables the evolving S&MS assurance case to be used as a fundamental program/project submittal at each LCR, where its inherent structure of argument, supported by evidence, directly supports the evaluation of the program/project with respect to the S&MS success criteria, and by extension, the S&MS risk posture. As such, the S&MS assurance case is integral to program/project systems engineering, risk management, and S&MS oversight activities, and provides the principal basis for S&MS risk acceptance by the Decision Authority throughout the program/project life cycle.

42 ENGINEERING↗

Aviation security screening optimizer for risk and throughput (ASSORT)

The increasing number of air travelers each year presents a challenge as many airports are near their capacity in terms of resources and space for passenger screening. Fortunately, advancements in technologies like next-generation millimeter wave scanning offer solutions to ease this strain. The focus remains on managing risk while enhancing the passenger experience for the traveling public. The risk model presented in this paper known as the Aviation Security Screening Optimizer for Risk and Throughput (ASSORT) is designed to assess risk-based approaches for passenger screening and checkpoint operations. Additionally, ASSORT is exploring various traveler categories — general, trusted, and trusted-plus — along with different checkpoint screening Concept of Operations tailored to each traveler type. For instance, travelers with a higher trust level may experience fewer screening technologies, resulting in quicker processing times at the checkpoint. The output of ASSORT provides a risk score for predefined threat scenarios, as well as the overall risk to the checkpoint, aircraft, and airport by traveler type. In conclusion, benefits of using this tool include assessing the trade-offs between the overall risk associated with checkpoints and the throughput rate of passengers screened. We show for example the impact that different passenger volumes at the checkpoint can have on risk.

99 GENERAL AND MISCELLANEOUS↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Adult weight change and premenopausal breast cancer risk: A prospective pooled analysis of data from 628,463 women

Early-adulthood body size is strongly inversely associated with risk of premenopausal breast cancer. It is unclear whether subsequent changes in weight affect risk. We pooled individual-level data from 17 prospective studies to investigate the association of weight change with premenopausal breast cancer risk, considering strata of initial weight, timing of weight change, other breast cancer risk factors and breast cancer subtype. Hazard ratios (HR) and 95% confidence intervals (CI) were obtained using Cox regression. Among 628,463 women, 10,886 were diagnosed with breast cancer before menopause. Models adjusted for initial weight at ages 18–24 years and other breast cancer risk factors showed that weight gain from ages 18–24 to 35–44 or to 45–54 years was inversely associated with breast cancer overall (e.g., HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.95–0.98) and with oestrogen-receptor(ER)-positive breast cancer (HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.94–0.98). Weight gain from ages 25–34 was inversely associated with ER-positive breast cancer only and weight gain from ages 35–44 was not associated with risk. None of these weight gains were associated with ER-negative breast cancer. Weight loss was not consistently associated with overall or ER-specific risk after adjusting for initial weight. Weight increase from early-adulthood to ages 45–54 years is associated with a reduced premenopausal breast cancer risk independently of early-adulthood weight. Biological explanations are needed to account for these two separate factors.

60 APPLIED LIFE SCIENCES↗

A risk-informed assessment tool to support review of license amendment requests for spent nuclear fuel dry cask storage systems

We report that while risk-informed safety evaluations are common methodologies used by the U.S. Nuclear Regulatory Commission (NRC), their application in the field of commercial spent nuclear fuel (SNF) dry storage has received limited attention. For instance, license amendment requests (LARs) for SNF dry cask storage systems (DCSSs) are evaluated according to U.S. NRC standard review plans (SRPs). However, risk-informed LAR review strategies could improve the understanding of critical system modifications, and lead to more predictable, efficient, and consistent LAR review processes. A methodology to develop a risk-informed LAR review tool is presented. Although focused on DCSSs, this methodology can be used to develop similar tools for a broad spectrum of safety-relevant systems. The end product (i.e., the tool) includes a tree diagram to help visualize the review risk significances assigned to a predefined set of system modifications and supporting rationale documentation. Instructions support correct tool application and provide the user with a path to incorporate currently unevaluated modifications in the tool structure. The demonstration of the methodology leads to the conclusion that risk-informed reviews of DCSS LARs are possible, although the tool precision could benefit from additional risk information. Further, the results indicate that many typical LARs involve low-risk or medium-risk modifications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Health Risk Assessment for Improper Landfill Disposal of End-of-Life CdTe PV

The present work is a continuation of the 2020 IEA PVPS Task 12 Human Health Risk Assessment Methods for PV Part 3: Module Disposal Risks. The 2020 report performed a human health risk assessment (HHRA) for disposal of a cadmium telluride (CdTe) PV module in an unlined landfill, focusing solely on risks from cadmium. This study extends the 2020 HHRA on CdTe PV, analyzing eleven constituent elements: Cd, Se, Te, Cu, Si, Cr(III), Mo, Sn, Zn, Ni, and Al. The present HHRA was performed through two methods: utilization of the U.S. Environmental Protection Agency's (USEPA) Delisting Risk Assessment Software (DRAS V.4.0) on eight exposure pathways for cancer risk and non-cancer hazards; and comparison of exposure point concentrations to federal standards for groundwater, surface water, air, and soil exposure pathways. Cancer risks and non-cancer hazards posed by elemental leaching through all evaluated exposure pathways, using both methods, were found to be several orders of magnitude below USEPA health-protective thresholds. Cadmium exhibited both the highest risks and lowest uncertainty considering data availability on chemical content, leachate, and federal screening levels.

chemicals↗

Changing temperature profiles and the risk of dengue outbreaks

As temperatures change worldwide, the pattern and competency of disease vectors will change, altering the global distribution of both the burden of infectious disease and the risk of the emergence of those diseases into new regions. To evaluate the risk of potential summer dengue outbreaks triggered by infected travelers under various climate scenarios, we develop an SEIR-type model, run numerical simulations, and conduct sensitivity analyses under a range of temperature profiles. Our model extends existing theoretical frameworks for studying dengue dynamics by introducing temperature dependence of two key parameters: the mosquito extrinsic incubation period and the lifespan of mosquitoes, which empirical data suggests are both highly temperature dependent. We find that changing temperature significantly alters dengue risk in an inverted U-shape, with temperatures in the range 27-31°C producing the highest risk. As temperatures increase beyond 31°C, the determinants of dengue risk begin to shift from mosquito biting rate and carrying capacity to the duration of the human infectious period, suggesting that changing temperatures not only alter dengue risk but also the potential efficacy of control measures. To illustrate the role of spatial and temporal temperature heterogeneity, we select five US cities where the primary dengue vector, the mosquito Aedes aegypti , has been observed, and which have had dengue cases in the past: Los Angeles, Houston, Miami, Brownsville, and Phoenix. Our analysis suggests that an increase of 3°C leads to an approximate doubling of the risk of dengue in Los Angeles and Houston, but a reduction of risk in Miami, Brownsville, and Phoenix due to extreme heat.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Containment and Geomechanical Risks at Integrated Mid-Content Stacked Carbon Storage Hub Sites

The U.S. Department of Energy is leading the development of CCS through collaborative projects and programs to not only develop and demonstrate the technology but to also quantify the risks and provide tools that site operators can use to develop a site-specific understanding of their risk to enable successful project operations. This report summarizes results and findings from the application of risk-assessment tools to an industrial-scale Geologic Carbon Storage (GCS) project. Specifically, we applied the National Risk Assessment Partnership’s (NRAP) Open Integrated Assessment Model (NRAP-Open-IAM) and State of Stress Assessment Tool (SOSAT) to two candidate sites being considered for storage by the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-Hub) project team. These sites, Sleepy Hollow Field in Nebraska and Patterson Field in Kansas, have historical oil and gas production and thus are attractive candidates to store the 50 million metric tons (Mt), which is the CarbonSAFE objective. Because these sites have historical operations, they have a significant number of existing wells that pose a risk for well leakage. Additionally, the storage formations will undergo significant pore pressure perturbation (i.e., increase due to CO 2 injection). Hence, we have selected the two NRAP tools best suited to study the risks associated with well leakage and geomechanical risks. The objective of the study was not only to assess the risk at the site, but to also improve the NRAP tools through application using real site data on an ongoing project.

54 ENVIRONMENTAL SCIENCES↗