Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource reservation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Critical review of lithium recovery from geothermal brines with implications for Smackover Formation, USA

The rapidly growing demand for lithium, a critical element for energy storage and national security technologies, has intensified concerns over the long-term availability and environmental impact of conventional lithium sources, such as hard-rock mining. To meet future demand, it is vital to explore unconventional resources that can provide sustainable domestic supplies. Geothermal brines, produced as a byproduct of geothermal energy generation, offer a promising alternative for lithium recovery by leveraging existing infrastructure and renewable energy production. In particular, the Smackover Formation, an extensive reservoir of high-salinity brines spanning Arkansas, Texas, Louisiana, Mississippi, and Alabama in the U.S. Gulf Coast, holds significant untapped lithium reserves. Co-producing geothermal energy and lithium from these brines aligns with sustainable extraction objectives while addressing resource scarcity. This review synthesizes current knowledge of lithium occurrence in the Smackover Formation and geothermal resources in the region, while also exploring how emerging tools such as machine learning can enhance resource targeting and co-production efficiency. Finally, we discuss key technical challenges and outline future research directions needed to advance lithium extraction from geothermal brines and secure a resilient domestic supply chain.

15 GEOTHERMAL ENERGY↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗

Satellite geological and geophysical remote sensing of Iceland: Preliminary results of geologic, hydrologic, oceanographic, and agricultural studies with ERTS-1 imagery

The author has identified the following significant results. The wide variety of geological and geophysical phenomena which can be observed in Iceland, and particularly their very direct relation to the management of the country's natural resources, has provided great impetus to the use of ERTS-1 imagery to measure and map the dynamic natural phenomena in Iceland. MSS imagery is being used to study a large variety of geological and geophysical eruptive products, geologic structure, volcanic geomorphology, hydrologic, oceanographic, and agricultural phenomena of Iceland. Some of the preliminary results from this research projects are: (1) a large number of geological and volcanic features can be studied from ERTS-1 imagery, particularly imagery acquired at low sun angle, which had not previously been recognized; (2) under optimum conditions the ERTS-1 satellite can discern geothermal areas by their snow melt pattern or warm spring discharge into frozen lakes; (3) various maps at scales of 1:1 million and 1:500,000 can be updated and made more accurate with ERTS-1 imagery; (4) the correlation of water reserves with snowcover can improve the basis for planning electrical production in the management of water resources; (5) false-color composites (MSS) permitted the mapping of four types of vegetation: forested; grasslands, reclaimed, and cultivated areas, and the seasonal change of the vegetation, all of high value to rangeland management.

Williams, R. S., Jr.↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reducing Grid Costs while Abating Emissions: Opportunities for Flexible Building Loads

This study evaluates the value of technology-agnostic, shiftable flexible building loads in modeled 2030 and 2040 U.S. grids for four types of customers under three potential aggregated distributed energy resources programs. The value examined includes monetary value from providing grid services (e.g., energy, capacity, flexibility reserve, regulation reserve, contingency reserve) and from reducing greenhouse gas emissions. By comparing more than 845,164,800 simulated shifting opportunities, the study finds that the timing of consumption is critical for profit-driven customers. A program that is activated for 30 critical hours of system operation can result in to $73 per year in revenue for 1 kWh of shiftable load. Emission reduction, on the other hand, is best accumulated through a year-round program: 1 kWh of shiftable load can lead to up to 487.9 kg CO2e carbon reduction per year. The report also provides detailed insights on the trade-off between revenue and emissions, regional variation, short- versus medium- term value, and impacts from various building flexibility parameters, such as shifting window and dissipation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Offering of Variable Resources in Regulation Markets with Performance Targets: An Analysis

To date, wind and solar power plants have mainly provided energy. Going forward, with the application of appropriate controls, they can offer additional grid services, such as regulating reserves. Additional grid services can present an opportunity for additional value streams to wind and solar power plants. However, the additional value might not be realized when operator-determined performance targets and settlement adjustments for the delivery of regulation capacity are disregarded. Additionally, this article studies the participation of variable resources in centralized regulation markets. We derive analytical results for regulation offers in terms of quantity and price considering that a variable resource does not want to risk being disqualified as a regulation provider, incurring losses, or foregoing more profitable opportunities. Our analysis suggests that U.S. operator-determined performance targets impose an upper bound on the quantity of a variable resource’s regulation offer; and settlement adjustments for the delivery of regulation affect the price at which variable resources offer and the calculations of opportunity costs in case of imperfect regulation delivery.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

Optimization-Based Resiliency Verification in Microgrids via Maximal Adversarial Set Characterization

Critical energy infrastructures are increasingly relying on advanced sensing and control technologies for efficient and optimal utilization of flexible energy resources. Algorithmic procedures are needed to ensure that such systems are designed to be resilient to a wide range of cyber-physical adversarial events. This paper provides a robust optimization framework to quantify the largest adversarial perturbation that a system can accommodate without violating pre-specified resiliency metrics. We formulate the maximal adversarial set characterization as a bi-level optimization problem which is solved via Lagrangian relaxations.We illustrate the proposed algorithm on an islanded microgrid example: a modified IEEE 123-node feeder with distributed energy resources. Simulations are carried out to characterize the tolerable adversarial perturbations for varying levels of available flexibility (energy reserves).

Nazir, Mohammad Nawaf↗

Archeological/Environmental Research

Landsat/Seasat remote sensing was used by Ames Research Center to evaluate environmental influence on ancient Mayan civilization. Over 35 archeological sites were imaged and valuable information concerning Maya settlement patterns, environment, and resource usage resulted. The imagery was also used by Mexican authorities to develop coastal management plans, establish Biosphere Reserves and assess damage from the 1988 Hurricane Gilbert. Imagery showed evidence of ancient coastlines, changes in sea level, an ancient river plain and Mayan canal systems. Previously unknown Mayan reservoirs were discovered. The project is considered a pioneering effort combining remote sensing, environmental studies and archeology.

Source record↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

The International Space Station human life sciences experiment implementation process

The selection, definition, and development phases of a Life Sciences flight research experiment has been consistent throughout the past decade. The implementation process, however, has changed significantly within the past two years. This change is driven primarily by the shift from highly integrated, dedicated research missions on platforms with well defined processes to self contained experiments with stand alone operations on platforms which are being concurrently designed. For experiments manifested on the International Space Station (ISS) and/or on short duration missions, the more modular, streamlined, and independent the individual experiment is, the more likely it is to be successfully implemented before the ISS assembly is completed. During the assembly phase of the ISS, science operations are lower in priority than the construction of the station. After the station has been completed, it is expected that more resources will be available to perform research. The complexity of implementing investigations increases with the logistics needed to perform the experiment. Examples of logistics issues include- hardware unique to the experiment; large up and down mass and volume needs; access to crew and hardware during the ascent or descent phases; maintenance of hardware and supplies with a limited shelf life,- baseline data collection schedules with lengthy sessions or sessions close to the launch or landing; onboard stowage availability, particularly cold stowage; and extensive training where highly proficient skills must be maintained. As the ISS processes become better defined, experiment implementation will meet new challenges due to distributed management, on-orbit resource sharing, and adjustments to crew availability pre- and post-increment. c 2001. Elsevier Science Ltd. All rights reserved.

Research↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Architecture of Area 12 Camp - Nevada's Atomic Ghost Town. An Architectural Survey of Area 12 Camp, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish 10 buildings and one structure in Area 12 Camp at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet current and future National Weapons Science, Global and Homeland Security Program, and Environmental Management mission requirements and to reduce dangers to site workers from some of these resources. These demolitions constitute an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. § 300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. These resources were recorded and evaluated as individually ineligible for the National Register of Historic Places (National Register or NRHP) by Menocal and Shaw (2019). Upon review by the Nevada State Historic Preservation Office (SHPO) and internal review by Desert Research Institute (DRI) and NNSA/NFO staff, it was determined that these resources needed to be rerecorded and evaluated in relation to what appeared to be a National Register-eligible Historic District made up of the entirety of Area 12 Camp. Based on preliminary information, it appeared that all 11 resources would likely be contributing elements of that historic district. With that assumption in mind, recording of the entire proposed Area 12 Camp Historic District was done for three purposes. First, it would result in a definitive significance evaluation of the 11 resources in question. Second, recording of the entire camp would be offered as an appropriate mitigation measure for the demolition of these resources. Third, it would present an essential background for future management of resources within the district boundaries. Prior to the present survey, Area 12 Camp had not yet been systematically recorded; therefore, DRI surveyed an area of approximately 229 acres for architectural resources. This effort resulted in the identification, recording, and evaluation of the Area 12 Camp Historic District (SHPO Resource No. D372), including the identification of its contributing components. This district is recommended eligible for the National Register of Historic Places under Criteria A and C. It is unevaluated under Criteria B and D. The Area 12 Historic District contains 71 Principal Resources, which include landscapes, buildings, and structures. Of these resources, 69 (including 10 of the 11 resources to be removed) are recommended as contributing elements of the historic district during its period of significance corresponding to nuclear testing from 1960 through 1992. During most of the Cold War, the government reservation now called the NNSS was named the Nevada Test Site (NTS).

54 ENVIRONMENTAL SCIENCES↗

A Novel Secondary Frequency Regulation with Optimal Priority Selection of AGC Contributions

Automatic generation control (AGC) is used to maintain acceptable frequencies during operation owing to fluctuations in load and variable resources. In conventional industry applications, the AGC signal is allocated to each generator according to the predispatched frequency regulation capacity or the order of economic efficiency. However, with the increasing integration of inverter-based resources (IBRs), the retirement of conventional synchronous generators (SGs) has posed new challenges to frequency control schemes because fewer of them are optional for AGC regulation. In this paper, we propose a novel model predictive control (MPC)-based frequency regulation model to reduce control cost and ensure stability, by considering different critical dynamic factors when optimally selecting the AGC units. The proposed control model – developed in a general form – comprehensively embeds characteristics such as generator ramping rates, reserve capacity, and operation cost. The model predictive control–based two-timescale AGC scheme enhances the capability of immunizing the power disturbance from types of resources by coordinating the control signals between faster IBRs and slower SGs. The case study’s proposed model is verified to be effective in synergistically enforcing different dynamic properties of AGC units into the frequency regulation scheme.

Jiang, Sufan [The University of North Carolina at ↗

Atmospheric In-Situ Resource Utilization For Mars Application

NASA now looks to Mars as the next step in human space exploration. A couple of challenges of such a destination include affordability and weight/volume limitations. As a way to solve these issues NASA is looking into the practice of In-Situ Resource Utilization (ISRU). Instead of manufacturing and bringing all the supplies necessary for a Mars mission and return trip, the goal is to send a preliminary mission to produce reserves of propellant, water, and oxygen on site. Part of this effort includes the Atmospheric Processing Module (APM). The APM is part of a lander that is composed of multiple compartments, each having a unique function; regolith collection/processing, water processing, atmospheric processing, and product storage. The overall goal is to develop the capability to produce methane (CH4) and oxygen as a fuel/oxidizer combo via a Sabatier reaction using resources from the Martian environment. The APM still must undergo modifications in design, and perhaps method, to become flight-ready to produce methane at the level of purity and quantity needed for a vehicle.

isru↗