Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “request for proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Designing and prototyping extensions to the Message Passing Interface in MPICH

As HPC system architectures and the applications running on them continue to evolve, the MPI standard itself must evolve. The trend in current and future HPC systems toward powerful nodes with multiple CPU cores and multiple GPU accelerators makes efficient support for hybrid programming critical for applications to achieve high performance. However, the support for hybrid programming in the MPI standard has not kept up with recent trends. The MPICH implementation of MPI provides a platform for implementing and experimenting with new proposals and extensions to fill this gap and to gain valuable experience and feedback before the MPI Forum can consider them for standardization. Here, in this work, we detail six extensions implemented in MPICH to increase MPI interoperability with other runtimes, with a specific focus on heterogeneous architectures. First, the extension to MPI generalized requests lets applications integrate asynchronous tasks into MPI’s progress engine. Second, the iovec extension to datatypes lets applications use MPI datatypes as a general-purpose data layout API beyond just MPI communications. Third, a new MPI object, MPIX_Stream, can be used by applications to identify execution contexts beyond MPI processes, including threads and GPU streams. MPIX stream communicators can be created to make existing MPI functions thread-aware and GPU-aware, thus providing applications with explicit ways to achieve higher performance. Fourth, MPIX Streams are extended to support the enqueue semantics for offloading MPI communications onto a GPU stream context. Fifth, thread communicators allow MPI communicators to be constructed with individual threads, thus providing a new level of interoperability between MPI and on-node runtimes such as OpenMP. Lastly, we present an extension to invoke MPI progress, which lets users spawn progress threads with fine-grained control to adapt the communication performance to their application designs. We describe the design and implementation of these extensions, provide usage examples, and highlight their expected benefits with performance results.

97 MATHEMATICS AND COMPUTING↗

BBOS: Efficient HPC Storage Management via Burst Buffer Over-Subscription

To avoid access to PFS, dedicated BB allocation is preferred despite of severe BB underutilization. Recently, new all-flash HPC storage systems with integrated BB and PFS are proposed, which speed up access to PFS. For this reason, we adopt BB over-subscription allocation method by allowing HPC applications to use BB only for I/O phase for improving BB utilization. Unfortunately, BB over-subscription aggravates I/O interference and demotion overhead from BB to PFS, resulting in degraded performance. To minimize the performance degradation, we develop an I/O scheduler to prevent I/O congestion and a new transparent data management system based on checkpoint/restart characteristics of HPC applications. With the proposed approach, not only the BB utilization can be improved, but also high performance of applications is achieved. In our experiments, we find that BB utilization is improved at least 2.2x, and more stable and higher checkpoint performance is guaranteed compared to other approaches. Besides, we achieve up to 96.4% hit ratio of restart requests on BB and up to 3.1x higher restart performance than others.

Sung, H↗

Online Learning and Pricing for Network Revenue Management with Reusable Resources

We consider a price-based network revenue management problem with multiple products and multiple reusable resources. Each randomly arriving customer requests a product (service) that needs to occupy a sequence of reusable resources (servers). We adopt an incomplete information setting where the firm does not know the price-demand function for each product and the goal is to dynamically set prices of all products to maximize the total expected revenue of serving customers. We propose novel batched bandit learning algorithms for finding near-optimal pricing policies, and show that they admit a near-optimal cumulative regret bound of $O(J\sqrt{XT})$, where J, X, and T, are the numbers of products, candidate prices, and service periods, respectively. As part of our regret analysis, we develop the first finite-time mixing time analysis of an open network queueing system (i.e., the celebrated Jackson Network), which could be of independent interest. Our numerical studies show that the proposed approaches perform consistently well.

42 ENGINEERING↗

Track reconstruction as a service for collider physics

Optimizing charged-particle track reconstruction algorithms is crucial for efficient event reconstruction in Large Hadron Collider (LHC) experiments due to their significant computational demands. Existing track reconstruction algorithms have been adapted to run on massively parallel coprocessors, such as graphics processing units (GPUs), to reduce processing time. Nevertheless, challenges remain in fully harnessing the computational capacity of coprocessors in a scalable and non-disruptive manner. This paper proposes an inference-as-a-service approach for particle tracking in high energy physics experiments. To evaluate the efficacy of this approach, two distinct tracking algorithms are tested: Patatrack, a rule-based algorithm, and Exa.TrkX, a machine learning-based algorithm. The as-a-service implementations show enhanced GPU utilization and can process requests from multiple CPU cores concurrently without increasing per-request latency. The impact of data transfer is minimal and insignificant compared to running on local coprocessors. This approach greatly improves the computational efficiency of charged particle tracking, providing a solution to the computing challenges anticipated in the High-Luminosity LHC era.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modification in Applying Appendix D of 40 CFR Part 61 to Heated Solid Radionuclide Materials With High Melting and Boiling Points

Appendix D of Title 40 Part 61 of the US Code of Federal Regulations (CFR) provides a procedure that US Department of Energy (US DOE) facility owners and operators can use to estimate radionuclide emissions to the atmosphere for dose calculations instead of measuring emissions for minor sources under the 40 CFR Part 61, Subpart H, National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities, regulation. The procedure assumes that any radioactive material heated above 100 °C is completely vaporized and emitted to the atmosphere. In 1991, the US DOE Oak Ridge Reservation (ORR) requested approval to use different release fractions (RFs) for uranium because of its high melting and boiling points. In response to the request, the US Environmental Protection Agency (US EPA) Region IV approved the use of modified RFs for elemental uranium provided no reaction had taken place to alter its chemical form. In 2015, the ORR requested approval to use different RFs for tungsten, again because of its high melting and boiling points. EPA Region IV approved the use of modified RFs for heated radioactive tungsten metal. In accordance with the two precedents set for heating uranium and radioactive tungsten metals, in 2016, the ORR requested approval to use modified RFs in a similar fashion for other radioactive solid metals and compounds with melting and boiling points above 500 °C that might be heated above 100 °C in future research projects and experiments. EPA Region IV again granted approval to use modified RFs for the list of compounds. This note discusses the proposed modified RFs and their development.

36 MATERIALS SCIENCE↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of the moderators in the STS preliminary design

This report details the results for an optimization of the dimensions of the moderators in the preliminary design of the Spallation Neutron Source Second Target Station (STS). This study uses the optimization algorithms of Dakota and an unstructured mesh model for the moderators in MCNP. More details on the unstructured mesh model and the automated mesh generation can be found in [3]. Parallel to this effort, the same moderator geometries have been optimized using a constructive solid geometry (CSG) MCNP model. More details on this model and its results can be found in [4]. Three optimal designs are selected for each moderator: one that is optimized for maximum peak brightness, one for maximum time-integrated brightness, and one for a combination of peak and time-integrated brightness. The backbone of the optimization work flow is provided by Dakota. For each set of design parameters requested by Dakota, a new solid geometry is automatically built in Creo and SpaceClaim, and subsequently exported to Attila4MC to generate an unstructured mesh geometry for MCNP. After the MCNP calculation is finished, the objective function (e.g., brightness metric) is returned to Dakota. After the new design has been evaluated, a result-file is written, and Dakota proposes the next set of design parameters to be evaluated. The loop continues until a specified convergence criterion has been met. The design parameters of the cylindrical (upper) moderator include the hydrogen radius, the premoderator thickness (top, bottom, radial), the beryllium radius and the horizontal position of the moderator. The crucial design choice is the hydrogen radius. A radius of 62 mm is shown to provide the maximum time-integrated brightness. The maximum peak brightness occurs with a radius of 40 mm. A combined (middle) design, which balances peak and time-integrated brightnesses, is obtained with a hydrogen radius of 50 mm. The premoderator thicknesses and the beryllium radius are slightly larger in the design optimized for time-integrated brightness than in the design optimized for peak brightness. The sensitivity to these two parameters is relatively small close to the optimal configurations. The hydrogen vessel and vacuum vessel wall thicknesses are dependent on the radius of the liquid hydrogen due to structural integrity requirements. The increased wall thicknesses for larger vessels significantly penalize the time-integrated brightness, with the maximum obtainable value reduced by more than 10% relative to earlier studies which used fixed vessel wall thicknesses. The impact of the variable wall thicknesses is much less for the peak brightness and combined brightness designs. The design parameters of the tube (lower) moderator selected for the optimization are the tube length, the annular premoderator thickness, the beryllium radius and the horizontal position of the moderator. The tube length is the crucial parameter and is chosen large (210 mm) and small (125 mm) in the designs optimized for time-integrated and peak brightness respectively. A combined optimal design has a tube length of 170 mm. The premoderator thickness and the beryllium radius are chosen larger in the design optimized for time-integrated brightness.

42 ENGINEERING↗

A daily, 250 m and real-time gross primary productivity product (2000–present) covering the contiguous United States

Abstract. Gross primary productivity (GPP) quantifies the amount of carbon dioxide (CO2) fixed by plants through photosynthesis. Although as a key quantity of terrestrial ecosystems, there is a lack of high-spatial-and-temporal-resolution, real-time and observation-based GPP products. To address this critical gap, here we leverage a state-of-the-art vegetation index, near-infrared reflectance of vegetation (NIRV), along with accurate photosynthetically active radiation (PAR), to produce a SatelLite Only Photosynthesis Estimation (SLOPE) GPP product for the contiguous United States (CONUS). Compared to existing GPP products, the proposed SLOPE product is advanced in its spatial resolution (250 m versus >500 m), temporal resolution (daily versus 8 d), instantaneity (latency of 1 d versus >2 weeks) and quantitative uncertainty (on a per-pixel and daily basis versus no uncertainty information available). These characteristics are achieved because of several technical innovations employed in this study: (1) SLOPE couples machine learning models with MODIS atmosphere and land products to accurately estimate PAR. (2) SLOPE couples highly efficient and pragmatic gap-filling and filtering algorithms with surface reflectance acquired by both Terra and Aqua MODIS satellites to derive a soil-adjusted NIRV (SANIRV) dataset. (3) SLOPE couples a temporal pattern recognition approach with a long-term Cropland Data Layer (CDL) product to predict dynamic C4 crop fraction. Through developing a parsimonious model with only two slope parameters, the proposed SLOPE product explains 85 % of the spatial and temporal variations in GPP acquired from 49 AmeriFlux eddy-covariance sites (324 site years), with a root-mean-square error (RMSE) of 1.63 gC m−2 d−1. The median R2 over C3 and C4 crop sites reaches 0.87 and 0.94, respectively, indicating great potentials for monitoring crops, in particular bioenergy crops, at the field level. With such a satisfactory performance and its distinct characteristics in spatiotemporal resolution and instantaneity, the proposed SLOPE GPP product is promising for biological and environmental research, carbon cycle research, and a broad range of real-time applications at the regional scale. The archived dataset is available at https://doi.org/10.3334/ORNLDAAC/1786 (download page: https://daac.ornl.gov/daacdata/cms/SLOPE_GPP_CONUS/data/, last access: 20 January 2021) (Jiang and Guan, 2020), and the real-time dataset is available upon request.

54 ENVIRONMENTAL SCIENCES↗

Filtering states with total spin on a quantum computer

Starting from a general wave-function described on a set of spins or qubits, we propose several quantum algorithms to extract the components of this state on eigenstates of total spin S 2 and its z component S z . The method plays the role of total spin projection and gives access to the amplitudes of the initial state on a total spin basis. Here, the different algorithms have various degrees of sophistication depending on the requested tasks. They can either solely project onto the subspace with good total spin or completely uplift the degeneracy in this subspace. In the former case, when the projection on the total spin j is made, we show that the number of operations for the projection can be reduced from a quadratic to a linear dependence in j. After each measurement, the state collapses to one of the spin eigenstates that could be used for postprocessing. For this reason, we call the method total quantum spin filtering.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

OctoFAS: A Two-Level Fair Scheduler That Increases Fairness in Network-Based Key-Value Storage

We identified a fairness problem in a network-based key-value storage system using Intel Storage Performance Development Kit (SPDK) in a multitenant environment. In such an environment, each tenant’s I/O service rate is not fairly guaranteed compared to that of other tenants. To address the fairness problem, we propose OctoFAS, a two-level fair scheduler designed to improve overall throughput and fairness among tenants. The two-level scheduler of OctoFAS consists of (i) inter-core scheduling and (ii) intra-core scheduling. Through inter-core scheduling, OctoFAS addresses the load imbalance problem that is inherent in SPDK on the storage server by dynamically migrating I/O requests from overloaded cores to underloaded cores, thereby increasing overall throughput. Intra-core scheduling prioritizes handling requests from starving tenants over well-fed tenants within core-specific event queues to ensure fair I/O services among multiple tenants. OctoFAS is deployed on a Linux cluster with SPDK. Through extensive evaluations, we found that OctoFAS ensures that the total system throughput remains high and balanced, while enhancing fairness by approximately 10% compared to the baseline, when both scheduling levels operate in a hybrid fashion.

97 MATHEMATICS AND COMPUTING↗

BuildingSync® v.2.7.0 (released 9.11.2025) [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. Version 2.7.0 adds new elements for file attachment feature and FederalBuilding, and generalizes usage of Optional Elements (e.g. EquipmentCondition, EquipmentID) to all assets/systems. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas [National Renewable Energy Lab. (NR↗

Target Multiwire for the Fermilab Booster Neutrino Beamline

The Booster Neutrino Beamline experiment requested a new secondary electron emission multiwire profile monitor installation. The device had to be durable in high radiation conditions and mounted within a large 10 foot airtight steel fixture for installation near the beam target. Previous iterations of multiwire suffered radiation damage to both the connectors and wires. To ensure accurate horizontal and vertical beam profile measurements, an updated design was proposed, designed, and constructed. The new BNB multiwire utilizes 3 mil diameter gold-plated tungsten sense wires soldered to vertical and horizontal Alumina-96 ceramic planes, 50 wires per plane. Radiation hard Kapton insulated 30 gauge wires carry the output signals. Profiles are readout through charge integrator scanner electronics. This paper will detail the design and functionality of the BNB target multiwire and present relevant beam profile data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SYS-5620-Project - Achieving Robust Laser Performance utilizing Historical Shot Experiments - A Systems Engineering Proposal

The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory precisely guides, amplifies, reflects, and focuses 192 powerful laser beams into a target about the size of a pencil eraser in a few billionths of a second, delivering more than 2 million joules of ultraviolet energy and 500 trillion watts of peak power. A crucial goal of the system is to trigger precise implosions of fuel capsules. This is achieved by delivering all 192 beams at user-specified times and locations on the target, minimizing any deviation from the requested performance. Power requirements can vary substantially on each experiment and the facility supports numerous amplifier pumping configurations and their attendant nonlinear effects. To achieve the tight performance required across such a broad array of configurations, constant comparison of measured and requested power delivery are tracked and long-term trends analyzed as a guide to understanding future performance. A very common question asked is given the current state of the laser today – how well would a similar experiment from the past perform today? Additionally, if one were to specify an alternate amplifier configuration using today’s model would and damage limits be exceeded and would there be an increase in performance. The physics model used to make these predictions and equipment protection checks is called the Virtual Beamline (VBL). VBL is used with an incoming desired pulse shape and energy to be delivered on target, and then does an iterative solve to predict the needed injected pulse in the front-end of the system to achieve this result. To effectively guide and predict future NIF experiment performance, laser scientists explore current amplifier configurations and compare them with historical data utilizing a tool called the Reverify Toolbox.

42 ENGINEERING↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Inverter Intensive Hybrid Power Plant Modeling with Small-Signal Stability Augmentation through Flexible Operation Mode Transition

Hybrid power plants (HPPs) prompt the penetration of inverter-based renewable energy sources (RES) in transmission systems; however, given their low-inertia nature, HPPs are dominated by power electronic inverters, so there are inevitable challenges in system stability when increasing numbers of HPPs are integrated into the modern power grids. To boost the penetration level of HPPs without jeopardizing system stability, it is desirable to equip them with operational characteristics (i.e., grid-forming capabilities) that are comparable to those of conventional power plants dominated by synchronous generators (SGs). In this paper, a holistic model of inverter intensive HPP is derived and a bi-level hierarchical control is developed to allow HPPs to flexibly switch among the designed operation modes (i.e., P-Q, P-V, and isochronous modes). Compared to SGs, which have limited controllability, the operation mode of each HPP could vary as requested. Such flexible mode transitions could be integrated into the secondary plant-level control and be leveraged as an additional control degree to further augment system stability. Further, the system small-signal stability margin is quantified with varying HPP operation modes. More importantly, modal analysis is thereby conducted to quantify the impacts of mode transition on the system oscillatory modes. The effectiveness of the proposed HPP bi-level hierarchical control is verified using extensive case studies based on the simplified real-world island power grid, and the results validate that the system small-signal stability margin can be enhanced with the additional degree of control flexibility enabled by HPP operation mode transition. The real-time hardware-in-the-loop (HIL) results are also provided to verify the proposed method.

grid-forming control↗

On Performance Prediction of Big Data Transfer in High-performance Networks

Big data generated by large-scale scientific and industrial applications need to be transferred between different geographical locations for remote storage, processing, and analysis. High-speed dedicated connections provisioned in High-performance Networks (HPNs) are increasingly utilized to carry out such big data transfer. HPN management highly relies on an important capability of performance (mainly throughput) prediction to reserve sufficient bandwidth and meanwhile avoid over-provisioning that may result in unnecessary resource waste. This capability is critical to improving the resource (mainly bandwidth) utilization of dedicated connections and meeting various user requests for data transfer. Conventional methods conduct performance prediction by fitting prior observed transfer history with predefined loss functions, without considering unobservable latent factors such as competing loads on end hosts. Such latent factors also have a significant impact on the application-level data transfer performance, which may result in an inaccurate prediction model. In this paper, we first investigate the impact of latent factors and propose a clustering-based method to eliminate their negative impact on performance prediction. We then develop a robust machine learning-based performance predictor by: i) incorporating the proposed latent factor elimination method into data preprocessing, and ii) adopting a customized domain guided loss function. Extensive experimental results show that our predictor achieves significantly higher prediction accuracy than several other state-of-the-art methods.

Liu, Wuji↗

Performance Targets for Perovskite Photovoltaic Research, Development, and Demonstration Programs

On October 15, 2021, the U.S. Department of Energy Solar Energy Technologies Office (SETO) released the Performance Targets for Perovskite Photovoltaic Research, Development, and Demonstration Programs Request for Information (RFI) for public response and comment. The RFI sought feedback from industry, academia, research laboratories, government agencies, and other stakeholders on efficiency, stability and replicability performance targets for perovskite (PVSK) photovoltaic devices that could be utilized to align community efforts, ensure relevance of potential future funding programs, and accelerate technical and commercial development and de-risking of perovskite technologies. The RFI included the following proposed target matrix for power conversion efficiency (PCE), area, stability, and sample sizes, and included questions on relevance, completeness, and challenges.

14 SOLAR ENERGY↗