Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramp forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Atmospheric condition identification in multivariate data through a metric for total variation

Identification of atmospheric conditions within a multivariable atmospheric data set is a necessary step in the validation of emerging and existing high-fidelity models used to simulate wind plant flows and operation.Atmospheric conditions relevant for wind energy research include stationary conditions, given the need for well-converged statistics for model validation, as well as conditions observed less frequently, such as extreme atmospheric events, which are used in wind turbine and wind plant design.Aggregation of observations without regard to covariance between time series discounts the dynamical nature of the atmosphere and is not sufficiently representative of atmospheric conditions.Identification and characterization of continuous time periods with atmospheric conditions that have a high value for analysis or simulation set the stage for more advanced model validation and the development of real-time control and operational strategies.The current work explores a single metric for variation in a multivariate data sample that quantifies variability within each channel as well as covariance between channels.The total variation is used to identify conditions of interest that conform to desired objective functions, such as stationary conditions, ramps or waves of wind speed, and changes in wind direction.Total variation is somewhat sensitive to the presence of outliers in the input data, and the method is best complemented by quality-control procedures to ensure reliable results.The direct detection and classification of events or conditions of interest within atmospheric data sets is vital to developing our understanding of wind plant response and to the formulation of forecasting and control models.

17 WIND ENERGY↗

An Extended IEEE 118-Bus Test System With High Renewable Penetration

This article describes a new publicly available version of the IEEE 118-bus test system, named NREL-118. The database is based on the transmission representation (buses and lines) of the IEEE 118-bus test system, with a reconfigured generation representation using three regions of the US Western Interconnection from the latest Western Electricity Coordination Council (WECC) 2024 Common Case [1]. Time-synchronous hourly load, wind, and solar time series are provided for over one year (8784 hours). The public database presented and described in this manuscript will allow researchers to model a test power system using detailed transmission, generation, load, wind, and solar data. This database includes key additional features that add to the current IEEE 118-bus test model, such as: the inclusion of 10 generation technologies with different heat rate functions, minimum stable levels and ramping rates, GHG emissions rates, regulation and contingency reserves, and hourly time series data for one full year for load, wind and solar generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine learning surrogate of physics-based building-stock simulator for end-use load forecasting

Building energy models are used to simulate heat and mass transfer and estimate end-use load in buildings. With the proliferation of solar photovoltaics on residential and commercial buildings, increasingly, buildings are expected to provide grid services, for which accurate and computationally efficient building energy simulations and end-use load prediction are imperative. Existing building energy simulation tools, however, have significant computational overhead that make them less practical in real-time deployment for optimization, design, uncertainty quantification and control in building energy management systems. Here this article presents a data-driven machine learning model based on light gradient boosting method (LightGBM) as a surrogate for a physics-based simulator for residential buildings to predict end-use load. The machine learning based surrogate model accounts for time-series related variables, seasonality and trend component of end-use load, and history of end-use load. The accuracy of the surrogate model is assessed on the prediction of the load profiles of 100 different houses in Cook County, Illinois, USA. The LightGBM surrogate model is shown to reduce the root-mean-squared error by 53% relative to a reference decision tree (DT) based model reported previously in the literature. Moreover, the model predicts the load spikes and high-ramp rate events throughout the year which are often the Achilles heel of other models in the literature. The machine learning based surrogate model is demonstrated to be computationally efficient, with a ten-fold reduction in the computational time compared to a physics-based building energy simulation, and suitable for uncertainty analysis and real-time control of building characteristics in response to uncertainty.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating the impacts of natural gas power generation growth on solar electricity development: PJM's evolving resource mix and ramping capability

Abstract Expansion of distributed solar photovoltaic (PV) and natural gas‐fired generation capacity in the United States has put a renewed spotlight on methods and tools for power system planning and grid modernization. This article investigates the impact of increasing natural gas‐fired electricity generation assets on installed distributed solar PV systems in the Pennsylvania–New Jersey–Maryland (PJM) Interconnection in the United States over the period 2008–2018. We developed an empirical dynamic panel data model using the system‐generalized method of moments (system‐GMM) estimation approach. The model accounts for the impact of past and current technical, market and policy changes over time, forecasting errors, and business cycles by controlling for PJM jurisdictions‐level effects and year fixed effects. Using an instrumental variable to control for endogeneity, we concluded that natural gas does not crowd out renewables like solar PV in the PJM capacity market; however, we also found considerable heterogeneity. Such heterogeneity was displayed in the relationship between solar PV systems and electricity prices. More interestingly, we found no evidence suggesting any relationship between distributed solar PV development and nuclear, coal, hydro, or electricity consumption. In addition, considering policy effects of state renewable portfolio standards, net energy metering, differences in the PJM market structure, and other demand and cost‐related factors proved important in assessing their impacts on solar PV generation capacity, including energy storage as a non‐wire alternative policy technique. This article is categorized under: Photovoltaics > Economics and Policy Fossil Fuels > Climate and Environment Energy Systems Economics > Economics and Policy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MPC4CLR (Model-Predictive-Control-for-Critical-Load-Restoration-in-Power-Distribution-Systems) [SWR-22-24]

Model predictive control (MPC) is a system or process control technique for making decisions under uncertainty via rolling look-ahead optimizations at each control step where only the current step decisions are applied, and the rest are discarded. In this work, we developed an MPC for a critical load restoration (CLR) in power distribution systems to recover system service (electricity delivery) following an extreme event-triggered substation outage. The method considers the problem of controlling distributed energy resources (DERs) of the distribution system with the objective of achieving maximum load pick up while satisfying distribution network flow and voltage constraints. A linearized optimal power flow (OPF) model is employed to represent the physics of the network. The problem formulation is augmented with a ramping (up) reserve product for the DERs to ensure improved and upward monotonic load restoration as time evolves. Simulation analysis and performance tests are performed using a modified IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage battery. The software is developed using various software packages in Julia and Python. The MPC model is implemented using the JuMP optimization language in Julia while the data analytics including renewable generation and load demand forecasts, running the MPC simulation and visualizations is performed in Python.

Eseye, Abinet Tesfaye↗

Empirical Assessment of the Appliance-Level Load Shape and Demand Response Potential in India

Over the next 15 years, electricity demand from the key residential and commercial appliances is projected to be nearly 300 GW or ~65% of India’s total peak demand. The objective of this study is to characterize appliance level demand and temporal variation, and identify the overall DR potential in India. We use Bangalore Electricity Supply Company territory (peak load of 3,505 MW in 2016) as a case study, using actual one-minute resolution load data for 2,979 distribution feeders and a detailed load survey. Our results show that agricultural pumping and space cooling (residential, commercial, and industrial) are the main contributors to the peak demand – with shares of 23-27% and 14-23%, respectively. Both sectors have about 1,000 MW of DR potential – agricultural pumps offering load shifting service while space cooling offering shimmy service that is capable of dynamically adjusting to react to short-run ramps and grid disturbances. Residential electric water heaters contribute nearly 18% of the winter morning peak demand and can also offer about 500 MW in shimmy service. Overall, we find that shifting and shimmy services offer 1,199 MW and 1,511 MW total DR potential, respectively.

demand response↗

Testing of Strategies for the Acceleration of the Cost Optimization

The general problem addressed in the Nuclear-Renewable Hybrid Energy System (N-R HES) project is finding the optimum economical dispatch (ED) and capacity planning solutions for the hybrid energy systems. In the present test-problem configuration, the N-R HES unit is composed of three electrical power-generating components, i.e. the Balance of Plant (BOP), the Secondary Energy Source (SES), and the Energy Storage (ES). In addition, there is an Industrial Process (IP), which is devoted to hydrogen generation. At this preliminary stage, the goal is to find the power outputs of each one of the N-R HES unit components (BOP, SES, ES) and the IP hydrogen production level that maximizes the unit profit by simultaneously satisfying individual component operational constraints. The optimization problem is meant to be solved in the Risk Analysis Virtual Environment (RAVEN) framework. The dynamic response of the N-R HES unit components is simulated by using dedicated object-oriented models written in the Modelica modeling language. Though this code coupling provides for very accurate predictions, the ensuing optimization problem is characterized by a very large number of solution variables. To ease the computational burden and to improve the path to a converged solution, a method to better estimate the initial guess for the optimization problem solution was developed. The proposed approach led to the definition of a suitable Monte Carlo-based optimization algorithm (called the preconditioner), which provides an initial guess for the optimal N-R HES power dispatch and the optimal installed capacity for each one of the unit components. The preconditioner samples a set of stochastic power scenarios for each one of the N-R HES unit components, and then for each of them the corresponding value of a suitably defined cost function is evaluated. After having simulated a sufficient number of power histories, the configuration which ensures the highest profit is selected as the optimal one. The component physical dynamics are represented through suitable ramp constraints, which considerably simplify the numerical solving. In order to test the capabilities of the proposed approach, in the present report, the dispatch problem only is tackled, i.e. a reference unit configuration is assumed, and each one of the N-R HES unit components is assumed to have a fixed installed capacity. As for the next steps, the main improvement will concern the operation strategy of the ES facility. In particular, in order to describe a more realistic battery commitment strategy, the ES operation will be regulated according to the electricity price forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Relative Lifetime Prediction for CPV Die-Attach Layers: Preprint

In concentrating photovoltaics (CPV) cell assemblies, a large-area die-attach layer is subjected to thermal cycles, leading to thermomechanical fatigue. This causes cracking and the eventual failure of the CPV cell by thermal runaway. We define a damage metric representing lumped progress toward failure and present a numerical model for computing the accumulation of damage for arbitrary transienttemperature conditions. The model is applied to a particular design with a solder die-attach layer. We show that accelerated-test thermal cycles with higher ramp rates cause more damage, both per cycle and per unit time. Outdoor exposure to one entire year in two geographic locations is also simulated, revealing that a year of exposure in Golden, Colorado is equivalent to 1.4 years of exposurein Oak Ridge, Tennessee.

14 SOLAR ENERGY↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY↗

The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequences anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Case study of a bore wind-ramp event from lidar measurements and HRRR simulations over ARM Southern Great Plains

The rapid change of wind speed and direction on 21 August 2017 is studied using Doppler lidar measurements at five sites of the Atmospheric Radiation Measurement (ARM) Southern Great Plains (SGP) facility in north-central Oklahoma. The Doppler lidar data were investigated along with meteorological variables such as temperature, humidity, and turbulence available from the large suite of instrumentation deployed at the SGP Central Facility (C1) during the Land-Atmosphere Feedback Experiment in August 2017. Lidar measurements at five sites, separated by 55-70 km, allowed us to document the development and evolution of the wind flow over the SGP area, examine synoptic conditions to understand the mechanism that leads to the ramp event, and estimate the ability of the High-Resolution Rapid Refresh model to reproduce this event. The flow feature in question is an atmospheric bore, a small-scale phenomenon that is challenging to represent in models, that was generated by a thunderstorm outflow northwest of the ARM SGP area. The small-scale nature of bores, its impact on power generation, and the modeling challenges associated with representing bores are discussed in this paper. In conclusion, the results also provide information about model errors between sites of different surface and vegetation types.

54 ENVIRONMENTAL SCIENCES↗

Assessment of Model Hub Height Wind Speed Performance Using DOE Lidar Buoy Data

As the offshore wind industry continues to gain momentum both in the U.S. and globally, reanalysis products remain essential tools for the lifecycle of a wind farm. From project siting and production estimates to determining construction and maintenance windows, reanalysis products play an important role. These regional and global long-term models also serve as inputs to higher resolution models. With such wide-ranging impacts on the offshore wind industry, the need for validation of reanalysis products is strong, particularly at typical turbine hub heights. Pacific Northwest National Laboratory (PNNL) operates two AXYS WindSentinelTM buoys for the U.S. Department of Energy (DOE) in order to collect meteorological and oceanographic data, including hub height wind speed, in areas of interest for offshore wind development. This work uses DOE buoy observations off the coasts of New Jersey and Virginia to evaluate the performance of Modern Era Retrospective Analysis for Research and Applications-2 (MERRA-2), the North American Regional Reanalysis (NARR), the European Center for Medium-Range Weather Forecasts (ECMWF) Reanalysis 5th generation (ERA5), and the National Oceanic and Atmospheric Administration (NOAA) assimilation system Rapid Refresh (RAP). Biases and degrees of correspondence are determined for each reanalysis product in order to provide insights on the performance and uncertainty for long-term wind resource characterization. With the baseline metrics determined, this work proceeds with an investigation into the sources of large deviations between the modeled and observed hub height wind speeds during the East Coast lidar buoy deployments. Consistent sources of reanalysis model error include stably stratified flow conditions, high wind shear, flow parallel to the coastline, and tropical and winter storms. For the near shore New Jersey location, offshore winds (i.e. blowing from land to water) tend to be associated with model overestimation of observed hub height wind speed, while winds parallel to the coastline are correlated with model underestimation of wind speed. Similarly, near the Virginia buoy, during southerly winds (parallel to the coastline) models underestimate the observed wind speed due to coastal upwelling. Reanalysis model wind speeds underestimate the hub height winds with increasing stable atmospheric stratification. Reanalysis model biases are seen when the observed wind speeds approach or exceed typical turbine cut-out speeds (around 20 m s-1). Large model errors during winter and tropical storm events, high wind speed events, and ramp events are often the result of wind speed timing and magnitude offsets. Overall, ERA5 provides the most successful representation of observed offshore hub height wind speeds at the U.S. East Coast buoy locations and is therefore best suited as an input boundary condition for model case studies. ERA5 performs well for a variety of atmospheric phenomena, including storms and sea breezes, however RAP, the next most successful reanalysis model, performs best in capturing the frequency of ramp events.

17 WIND ENERGY↗

An Independent Analysis of the Spitzer/IRAC Phase Curves of WASP43 b

We present here a reanalysis of the Spitzer Space Telescope phase curves of the hot Jupiter WASP43 b, using the wavelet pixel-independent component analysis, a blind signal-source separation method. The data analyzed were recorded with the Infrared Array Camera and consisted of two visits at 3.6 μm, and one visit at 4.5 μm, each visit covering one transit and two eclipse events. To test the robustness of our technique we repeated the analysis on smaller portions of the phase curves, and by employing different instrument ramp models. Our reanalysis presents significant updates of the planetary parameters compared to those reported in the original phase curve study of WASP43 b. In particular, we found (1) higher nightside temperatures, (2) smaller hotspot offsets, (3) a greater consistency (∼1σ) between the two 3.6 μm visits, and (4) a greater similarity with the predictions of the atmospheric circulation models. Our parameter results are consistent within 1σ with those reported by a recent reanalysis of the same data sets. For each visit we studied the variation of the retrieved transit parameters as a function of various sets of stellar limb-darkening coefficients, finding significant degeneracy between the limb-darkening models and the analysis output. Furthermore, we performed the analysis of the single transit and eclipse events, and we examined the differences between these results with the ones obtained with the whole phase curve. Finally we provide a formula useful to optimize the trade-off between precision and duration of observations of transiting exoplanets.

79 ASTRONOMY AND ASTROPHYSICS↗