Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “public utility commissions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Panel discussion: Challenges and improvements in accident dose analysis; Regulatory and industry perspective

Full text of publication follows. Design basis accident (DBA) analyses are one of several ways nuclear power plant licensees demonstrate, and the U.S. Nuclear Regulatory Commission (NRC) staff verifies, that the design and location of a nuclear power plant are appropriate and that the protection of health and safety of the public is maintained. In July 2000, the NRC staff issued Regulatory Guide 1.183, 'Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors' (RG 1.183) [1]. RG 1.183 provides a method acceptable to the NRC staff for complying with the regulatory requirements contained in Title 10 of the Code of Federal Regulation (10 CFR) Section 50.67 (50.67), 'Accident source term' [2]. RG 1.183 also provides assumptions and parameters used to model postulated DBA radiological analyses for light-water reactors (LWR). Since the initial issuance of RG 1.183, the NRC staff and the nuclear power plant licensees have both gained substantial experience with the implementation of 10 CFR 50.67 and RG 1.183. Based on this experience, comments from licensees, the anticipation of licensing advanced LWRs, and new research, the NRC is developing a proposed revision to RG 1.183. This panel discussion will provide a discussion of that proposed revision, its potential impact on existing and future evaluations, and the industry perspective on the revised guidance. References: 1) USNRC, Regulatory Guide 1.183, 'Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors,' Revision 0, U.S. Nuclear Regulatory Commission, Washington, D.C. (2000), Electronic copies are also available in ADAMS (http://www.nrc.gov/reading-rm/adams.html), under Accession No. ML003716792. 2) U.S. Code of Federal Regulations, Title 10 (Energy), Part 50 (Domestic Licensing of Production and Utilization Facilities), Section 67, (Accident source term), Office of the Federal Register, Washington, DC (1999). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

2014 Southern Nevada Household Travel Survey

The 2014 Southern Nevada Household Travel Survey collected information from residents in the Las Vegas area to update the regional travel demand model and assess travel behavior. The Regional Transportation Commission of Southern Nevada contracted with Westat to conduct the survey. The survey was conducted in two phases—from March to May 2014 and from August to October 2014. Participants provided demographic and travel data (via a travel log). A 10% subsample (1,694 participants) was randomly selected to take part in a wearable global positioning system (GPS) technology-based component of the study, the purpose of which was to assess the level of trip under-reporting in the self-reported travel logs. Participants in the GPS portion of the study were instructed to record trips in their travel logs on the first day only, while passively recording their travel for three full days.

1Hz data↗

2001 Atlanta Household Travel Survey

The 2001 Atlanta Household Travel Survey collected demographic, socioeconomic, and travel information on work and non-work travel behavior for a 48-hour travel period. The study was conducted on behalf of the Atlanta Regional Commission, and it is an essential element in the transportation planning and modeling efforts for the 13-county Atlanta region. The main objective of the study was to produce data that could be used to develop and calibrate travel demand models for use in travel forecasting, land use planning, and air quality planning to improve the transportation system. The second component in the survey was the deployment of an electronic travel diary with person-based GPS and an accelerometer to collect health and activity information. Travel data includes trip generation, trip distribution, and modal choice. The survey recruited a total of 12,184 households to participate in the study. Of these, 8,069 households (66%) completed travel. The 8,069 households, when weighted, represent 21,323 persons, 14,449 vehicles, and 126,127 places visited from April 2001 through April 2002. This dataset is part of the Metropolitan Travel Survey Archive, which includes travel surveys from numerous public agencies across the United States and is archived by the Transportation Secure Data Center to ensure their continued public availability.

1Hz data↗

2011 Atlanta, Georgia, Regional Travel Survey

The 2011 Regional Travel Survey collected trip data from households across 20 counties in and around Atlanta, Georgia, to improve regional travel demand forecasts. The survey was conducted by PTV NuStats, GeoStats, and PG Americas Inc. on behalf of the Atlanta Regional Commission. The goal was to collect trip data from a minimum of 10,000 households with a subsample of 1,000 households providing global positioning system (GPS) data. The GPS add-on consisted of two sample groups. The first sample group was provided with GPS devices to install in their personal vehicles (797 vehicles) to collect the speed and location of a vehicle during an assigned study period. The second sample group (1,653 participants) was provided with a wearable GPS device to collect the speed and location of an individual during an assigned study period. People participating in the wearable add-on part of the study were chosen because their travel diaries reported use of public transit in day-to-day travel. Each GPS participant was grouped into either the spring phase (March to May 2011) or the fall phase (July to September 2011), and data were recorded for a maximum of seven days for vehicle units and three days for wearable units.

1Hz data↗

1988 Delaware Valley Regional Planning Commission Household Travel Survey

The Delaware Valley Regional Planning Commission conducted household travel surveys in 1988 for the Delaware Valley region of Pennsylvania, which consists of Bucks, Chester, Delaware, Montgomery, and Philadelphia counties. The home interview travel survey was intended to measure the travel habits of area residents, and it generated needed information on trip generation rates, trip distribution, and model choice. This information was used for model calibration and validation on the trip generation, trip distribution, and model split models. The data includes demographic and socioeconomic details, as well as travel patterns, for 1,567 households. A total of 5,733 people reported a total of 18,899 trips. The survey was conducted on a weekday, Monday through Friday, and only ten survey locations contained weekend day travel.

1Hz data↗

HVAC Duct Pressure Optimization System

The US Department of Energy, the California Energy Commission, and other public and private entities including the venture capital community are seeking technical solutions that include “smart, grid-interactive, efficient buildings - to best serve the needs of building occupants and the grid while reducing energy consumption overall.” In this paper, a systems engineering approach is used to examine elements of a prior proof-of-concept project along with new ideas seeking to justify additional research funding to further advance the technology. With additional research and development funding, the technology described here has the potential to achieve success toward development of a commercially viable product. These types of projects provide financial and environmental benefit to American taxpayers and investors. Cost effectiveness and return on investment are key criteria for energy efficiency projects. By evaluating the end-to-end processes including manufacturing, installation, commissioning and comparing various options, we arrived at a proposed implementation concept of a HVAC Duct Pressure Optimization System that saves energy in commercial buildings and improves the return on investment by a factor of 6X compared to previous research projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2000 Delaware Valley Regional Planning Commission Household Travel Survey

This survey was conducted from March through December 2000 under the auspices of the Delaware Valley Regional Planning Commission and the Southern Jersey Transportation Planning Organization and funded through the Pennsylvania and New Jersey departments of transportation. Cambridge Systematics provided quality assurance under a subcontract to NuStats. The purpose of the survey was to obtain information about work and non-work trip generation, trip distribution, modal choice, and traffic assignment, as well as to obtain data on average vehicle occupancy. The dataset contains demographic and travel data on 5,677 households in the 14-county study area. Of those households, 4,217 were from the 10-county Delaware Valley region of Pennsylvania and New Jersey. The 4,217 Delaware Valley households, when weighted, represent 9,358 members and 6,069 vehicles, and reported a total of 31,631 trips.

1Hz data↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

2005 Washoe County Travel Characteristics Study

The primary objective of the 2005 Washoe County Travel Characteristics Study was to document travel behavior data characteristics of regional households in Washoe County, Nevada, in order to update the regional transportation model. The household travel survey, which was conducted from October through November, was one of several surveys conducted in the fall of 2005 for the Regional Transportation Commission (RTC) of Washoe County, with the other surveys focusing on documenting transit usage, visitor travel behavior, and external travel through the region. The data collected were drawn from 1,174 households within the RTC planning area and contain information about 2,679 household members, 2,138 vehicles, and 11,077 unlinked trips. The household travel survey entailed the collection of activity and travel information for all household members regardless of age during a specific 24-hour period. The survey relied on the willingness of regional households to 1) provide demographic information about their household, its members, and its vehicles and 2) have all household members record all travel and activity for a specific 24-hour period, including address information for all locations visited, trip purpose, mode, and travel times.

1Hz data↗

2008 NIRPC Household Travel Inventory

The Northwestern Indiana Regional Planning Commission (NIRPC) Household Travel Inventory, also sponsored by the Indiana Department of Transportation, is a comprehensive study of the demographic and travel of residents of Lake, Porter, and La Porte counties in northwest Indiana. The primary objective of the study was to provide data for the continued development and refinement of the Indiana regional travel demand forecast models. 3,838 households from northwest Indiana participated in the survey, which entailed the collection of activity and travel information for all household members regardless of age during a randomly assigned 24- or 48-hour period. NIRPC travel survey data provided the information required on base-year daily trips made by study area residents to the Chicago CBD. This travel market is treated separately because of the importance of transit for its travelers.

1Hz data↗

2000 Bay Area Travel Survey

In 2000, the San Fransisco Bay Area Metropolitan Transportation Commission launched its fifth travel survey effort in the nine-county Bay Area. More than 15,000 households participated. The survey was an activity-based travel survey that collected information on all in-home and out-of-home activities over a two-day period, including weekday and weekend pursuits. Like the 1990 survey, the 2000 Bay Area Travel Survey also included an additional sample of 3,000 households using Bay Area Rapid Transit. Respondents were asked to report detailed information regarding their travel, including trip locations, mode of transportation, trip start and end times, trip purpose, and trip activities. Demographic variables include gender, age, employment status, occupation, income, education level, ethnicity, as well as whether a respondent held a valid driver's license, was a student, and had a disability.

1Hz data↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Remote Sensing and Spatial Growth Modeling Coupled with Air Quality Modeling to Assess the Impact of Atlanta, Georgia on the Local and Regional Environment

The growth of cities, both in population and areal extent, appears as an inexorable process. Urbanization continues at a rapid rate, and it is estimated that by the year 2025, 80 percent of the world s population will live in cities. Directly aligned with the expansion of cities is urban sprawl. Urban expansion has profound impacts on a host of biophysical, environmental, and atmospheric processes. A reduction in air quality over cities is a major result of these impacts. Strategies that can be directly or indirectly implemented to help remediate air quality problems in cities and that can be accepted by political decision makers and the general public are now being explored to help bring down air pollutants and improve air quality. The urban landscape is inherently complex and this complexity is not adequately captured in air quality models, particularly the Community Multiscale Air Quality (CMAQ) model that is used to assess whether urban areas are in attainment of EPA air quality standards, primarily for ground level ozone. This inadequacy of the CMAQ model to sufficiently respond to the heterogeneous nature of the urban landscape can impact how well the model predicts ozone pollutant levels over metropolitan areas and ultimately, whether cities exceed EPA ozone air quality standards. We are exploring the utility of high-resolution remote sensing data and urban spatial growth modeling (SGM) projections as improved inputs to the meteorology component of the CMAQ model focusing on the Atlanta, Georgia metropolitan area as a case study. These growth projections include "business as usual" and "smart growth" scenarios out to 2030. The growth projections illustrate the effects of employing urban heat island mitigation strategies, such as increasing tree canopy and albedo across the Atlanta metro area, which in turn, are used to model how ozone and air temperature can potentially be moderated as impacts on elevating ground-level ozone, as opposed to not utilizing heat island mitigation strategies. The National Land Cover Dataset at 30m resolution is being used as the land use/land cover input and aggregated to the 4km scale for the MM5 mesoscale meteorological model and the (CMAQ) modeling schemes. Use of these data have been found to better characterize low density/suburban development as compared with USGS 1km land use/land cover data that have traditionally been used in modeling. Air quality prediction for future scenarios to 2030 is being facilitated by land use projections using a spatial growth model. Land use projections were developed using the 2030 Regional Transportation Plan developed by the Atlanta Regional Commission, the regional planning agency for the area. This allows the State Environmental Protection agency to evaluate how these transportation plans will affect future air quality. The coupled SGM and air quality modeling approach provides insight on what the impacts of Atlanta s growth will be on the local and regional environment and exists as a mechanism that can be used by policy makers to make rationale decisions on urban growth and sustainability for the metropolitan area in the future.

Quattrochi, Dale A.↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

5ω Optical Thomson Scattering Report

The 5ω Optical Thomson Scattering system on the National Ignition Facility (NIF) is a diagnostic designed to measure temporally and spatially resolved plasma conditions in Inertial Confinement Fusion (ICF) Hohlraums. The system was proposed in 2014 and a phased approach to implementation was developed. In phase one the collection system was designed, built, and fielded on the NIF to be used for 3ω Thomson scattering measurements and background measurements near 211 nm (5ω. The initial commissioning experiment for the collection system was completed in Oct. 2016. Commissioning of the collection system continued through 2017 and the system is now fielded for a range of user experiments and regularly produces publication quality data. A dedicated 5ω probe laser was designed and built to allow Thomson scattering measurements in the presence of 2 MJ of 3ω drive energy. Due to scattered light (spectral reflections, laser-plasma instabilities, and unconverted drive energy) from the 3w drive lasers typical wavelengths (2ω and 4ω) fielded at other laser facilities like the Nova Laser Facility and the Omega Laser Facility were unable to meeting the signal to background requirements in design studies. A 10 Joule 5ω probe was proposed as a solution that met requirements. This 10 Joule laser was more energetic than previously fielded 5w lasers by 2-3 orders of magnitude. As part of a risk reduction plan, phase two of the project was to develop a 1 Joule, 5ω laser to demonstrate conversion efficiency >20% from 1ω to 5ω and make initial Thomson scattering measurements in the first few nanoseconds of an ICF laser pulse. Initial tests of the 5w conversion were completed at the Laboratory for Laser Energetics (LLE) and produced record 5ω energies. Based on these results from LLE, a 1 Joule, 5w laser system was designed for the NIF in 2018 and commissioning began in 2019. Commissioning of the 5ω laser system continued through 2023 and was eventually paused in Q1 of FY24 due to completing resource constraints. Commissioning of the 5w laser system proved incredibly challenging. Multiple issues were identified during commissioning and resolved, but issues remain. Currently there is not a clear understanding of why 5ω scattered has not been detected on the OTS collection system. Based on offline measurements, calculations, and preshot measurements the system appears to meet all requirements. Potential target physics issues have been investigated and do not appear to be an issue. The current hypothesis is that there is an error in one or more aspects of the offline testing not translating to expected performance when the system is fielded on the NIF. Additional full system testing in-situ utilizing the complete OTS system and NIF target chamber center time is needed to further test potential failure modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The 1990 San Francisco Bay Area Metropolitan Transportation Commission Household Survey

The San Francisco Bay Area's Metropolitan Transportation Commission (MTC) and the regional transportation planning agency for the nine-county Bay Area conducted the survey. The basic purpose for the survey was for the development of travel demand models to simulate the various components of travel behavior: auto ownership, trip frequency (trip generation), and the distribution of trips between origins and destinations by travel mode. Planners at MTC envisioned the 1990 survey as the first wave of a multi-wave household panel survey designed to capture both short- and long-term changes in regional travel behavior. The 1990 survey collected single-weekday travel data from nearly 9,900 Bay Area households and multiple-weekday travel data from nearly 1,500 households. The 1990 survey effort also included a separate sub-project, funded by the Bay Area Rapid Transit (BART) District, to collect multiple-weekday travel data from 1,000 BART-using households. The BART survey and the MTC multiple-weekday survey were completed in the spring of 1990; the MTC single-weekday survey was continued and completed during the autumn of 1990.

1Hz data↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗