Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pra”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Reliability and Probabilistic Risk Assessment - How They Play Together

Since the Space Shuttle Challenger accident in 1986, NASA has extensively used probabilistic analysis methods to assess, understand, and communicate the risk of space launch vehicles. Probabilistic Risk Assessment (PRA), used in the nuclear industry, is one of the probabilistic analysis methods NASA utilizes to assess Loss of Mission (LOM) and Loss of Crew (LOC) risk for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability distributions to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: 1) what can go wrong that would lead to loss or degraded performance (i.e., scenarios involving undesired consequences of interest), 2) how likely is it (probabilities), and 3) what is the severity of the degradation (consequences). Since the Challenger accident, PRA has been used in supporting decisions regarding safety upgrades for launch vehicles. Another area that was given a lot of emphasis at NASA after the Challenger accident is reliability engineering. Reliability engineering has been a critical design function at NASA since the early Apollo days. However, after the Challenger accident, quantitative reliability analysis and reliability predictions were given more scrutiny because of their importance in understanding failure mechanism and quantifying the probability of failure, which are key elements in resolving technical issues, performing design trades, and implementing design improvements. Although PRA and reliability are both probabilistic in nature and, in some cases, use the same tools, they are two different activities. Specifically, reliability engineering is a broad design discipline that deals with loss of function and helps understand failure mechanism and improve component and system design. PRA is a system scenario based risk assessment process intended to assess the risk scenarios that could lead to a major/top undesirable system event, and to identify those scenarios that are high-risk drivers. PRA output is critical to support risk informed decisions concerning system design. This paper describes the PRA process and the reliability engineering discipline in detail. It discusses their differences and similarities and how they work together as complementary analyses to support the design and risk assessment processes. Lessons learned, applications, and case studies in both areas are also discussed in the paper to demonstrate and explain these differences and similarities.

Safie, Fayssal↗

Methodology for the Incorporation of Passive Component Aging Modeling into the RAVEN/ RELAP-7 Environment

Passive system, structure and components (SSCs) will degrade over their operation life and this degradation may cause to reduction in the safety margins of a nuclear power plant. In traditional probabilistic risk assessment (PRA) using the event-tree/fault-tree methodology, passive SSC failure rates are generally based on generic plant failure data and the true state of a specific plant is not reflected realistically. To address aging effects of passive SSCs in the traditional PRA methodology [1] does consider physics based models that account for the operating conditions in the plant, however, [1] does not include effects of surveillance/inspection. This paper represents an overall methodology for the incorporation of aging modeling of passive components into the RAVEN/RELAP-7 environment which provides a framework for performing dynamic PRA. Dynamic PRA allows consideration of both epistemic and aleatory uncertainties (including those associated with maintenance activities) in a consistent phenomenological and probabilistic framework and is often needed when there is complex process/hardware/software/firmware/ human interaction [2]. Dynamic PRA has gained attention recently due to difficulties in the traditional PRA modeling of aging effects of passive components using physics based models and also in the modeling of digital instrumentation and control systems. RAVEN (Reactor Analysis and Virtual control Environment) [3] is a software package under development at the Idaho National Laboratory (INL) as an online control logic driver and post-processing tool. It is coupled to the plant transient code RELAP-7 (Reactor Excursion and Leak Analysis Program) also currently under development at INL [3], as well as RELAP 5 [4]. The overall methodology aims to: • Address multiple aging mechanisms involving large number of components in a computational feasible manner where sequencing of events is conditioned on the physical conditions predicted in a simulation environment such as RELAP-7. • Identify the risk-significant passive components, their failure modes and anticipated rates of degradation • Incorporate surveillance and maintenance activities and their effects into the plant state and into component aging progress. • Asses aging affects in a dynamic simulation environment 1. C. L. SMITH, V. N. SHAH, T. KAO, G. APOSTOLAKIS, “Incorporating Ageing Effects into Probabilistic Risk Assessment –A Feasibility Study Utilizing Reliability Physics Models,” NUREG/CR-5632, USNRC, (2001). 2. T. ALDEMIR, “A Survey of Dynamic Methodologies for Probabilistic Safety Assessment of Nuclear Power Plants, Annals of Nuclear Energy, 52, 113-124, (2013). 3. C. RABITI, A. ALFONSI, J. COGLIATI, D. MANDELLI and R. KINOSHITA “Reactor Analysis and Virtual Control Environment (RAVEN) FY12 Report,” INL/EXT-12-27351, (2012). 4. D. ANDERS et.al, "RELAP-7 Level 2 Milestone Report: Demonstration of a Steady State Single Phase PWR Simulation with RELAP-7," INL/EXT-12-25924, (2012).

97 MATHEMATICS AND COMPUTING↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

There are many ways of reducing the O&M costs; this work presents an innovative framework of reducing O&M costs by utilizing the onsite Flex equipment at NPPs. Flex strategies were postulated by the U.S. Nuclear Regulatory Commission (NRC) in the wake of Fukushima Dai-ichi accident to address beyond-design-basis accidents and improve plant flexibility. Onsite Flex includes equipment such as portable pumps, generators, batteries, compressors, and other supporting equipment or tools, all stored in a dedicated and secure building designed to withstand external hazards. In the past years, several NPPs have invested in procuring and maintaining the onsite Flex asset that stands unutilized most of the time. Recently there have been active efforts to develop strategies through which NPPs can take credit for the Flex equipment. This work focuses on identifying areas where Flex equipment can be utilized during normal plant operation and develop a framework that would aide in reduction of O&M costs without impacting plant safety. Earlier work in the current project, published in INL/EXT 18 51531, had presented the risk- and cost-analysis framework for utilizing FLEX portable equipment during technical specification required shutdown due to component failure. The licensee event report (LER) database of the NRC shows that the commercial NPPs in the US reported 86 technical specification required shutdowns since year 2010. When a component failure or unavailability leads to a technical specification required shutdown, the NPPs suffers both direct costs in terms of loss of revenue arising from the loss of generation and indirect costs in form of reporting and inspection required by the NRC. The earlier work developed the following framework and implemented it on a demonstration probabilistic risk assessment (PRA) model to utilize the portable Flex equipment when a component failure could potentially lead to a technical specification required shutdown: 1. Identify the components, the failure or unavailability of which would result in a 10 CFR 50.73(a)(2)(i)A-reportability requirement, postulated by the NRC for technical specification required shutdown to be reported in NRC’s LER database. 2. Identify the Flex equipment that can be utilized as a standby to the failed component. 3. Develop a probabilistic risk assessment (PRA) model that incorporates the Flex equipment within the current plant PRA model. 4. Perform PRA calculations to determine change in core damage frequency and change in risk-informed allowable outage time. 5. Perform cost-benefit analysis to determine the economic feasibility of implementing the Flex equipment The current work, presented in this report, implement the above framework in a plant PRA model obtained from a US commercial nuclear power plant by prestaging onsite FLEX equipment as a redundancy to the existing auxiliary feedwater system, and pre-coordinating with offsite FLEX centers. The new configuration increased the allowable outage time by about a fifty percent overall for the diesel generator being out of service. The benefits to NPPs of utilizing the Flex equipment during normal operations, and performing the PRA developed in this work, include: 1. A risk-informed plant shutdown alternative to the current technical specification required shutdown. 2. Extension of allowable outage time to initiate technical specification required shutdown. 3. Reducing economic impact of component failure, avoiding plant shutdown, and maximizing generation. 4. Save the direct and indirect costs associated with technical specification required shutdown.

42 ENGINEERING↗

Peer Review of NRC Standardized Plant Analysis Risk Models

The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Importance Measures in the Designand Operation of Nuclear Power Plants

This monograph presents and discusses risk importance measures as quantified by the probabilistic risk assessment (PRA) models of nuclear power plants (NPPs) developed according to the current standards and practices. Usually, PRA tools calculate risk importance measures related to a single ?basic event? representing particular failure mode. This is, then, reflected in many current PRA applications. The monograph focuses on the concept of ?component-level? importance measures that take into account different failure modes of the component including common-cause failures (CCFs). In opening sections the roleof risk assessment in safety analysis of an NPP is introduced and discussion given of ?traditional?, mainly deterministic, design principles which have been established to assign a level of importance to a particular system, structure or component. This is followed by an overview of main risk importance measures for risk increase and risk decrease from current PRAs. Basic relations which exist among the measures are shown. Some of the current practical applications of risk importancemeasures from the field of NPP design, operation and regulation are discussed. The core of the monograph provides a discussion on theoreticalbackground and practical aspects of main risk importance measures at the level of ?component? as modeled in a PRA, starting from the simplest case, single basic event, and going toward more complexcases with multiple basic events and involvements in CCF groups. The intent is to express the component-level importance measures via theimportance measures and probabilities of the underlying single basic events, which are the inputs readily available from a PRA model andits results. Formulas are derived and discussed for some typical cases. The formulas and their results are demonstrated through some practicalexamples, done by means of a simplified PRA model developed in and run by RiskSpectrum? tool, which are presented in the appendices. The monograph concludes with discussion of limitations of the use of risk importance measures and a summary of component-level importance cases evaluated.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

SAPHIRE 8 Volume 1 - Overview and Summary

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE 8 can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which leads to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for managing models such as flooding and fire. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). In SAPHIRE 8, the act of creating a model has been separated from the analysis of that model in order to improve the quality of both the model (e.g., by avoiding inadvertent changes) and the analysis. Consequently, in SAPHIRE 8, the analysis of models is performed by using what are called Workspaces. Currently, there are Workspaces for three types of analyses: (1) the NRC’s Accident Sequence Precursor program, where the workspace is called “Events and Condition Assessment (ECA);” (2) the NRC’s Significance Determination Process (SDP); and (3) the General Analysis (GA) workspace. Workspaces are independent of each other and modifications or calculations made within one workspace will not affect another. In addition, each workspace has a user interface and reports tailored for their intended uses. This report provides an overview of the functions and features available in SAPHIRE 8 and presents general instructions for using the software. Since SAPHIRE 8 expands upon Version 7, new and improved features will be discussed.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Volume 3 - Users' Guide

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer. However, the INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users comprised of a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events, quantify associated damage outcome frequencies, and identify important contributors to this damage (Level 1 PRA) and to analyze containment performance during a severe accident and quantify radioactive releases (Level 2 PRA). It can be used for a PRA evaluating a variety of operating conditions, for example, for a nuclear reactor at full power, low power, or at shutdown conditions. Furthermore, SAPHIRE can be used to analyze both internal and external initiating events and has special features for transforming models built for internal event analysis to models for external event analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to both the public and the environment (Level 3 PRA). This reference guide will introduce the SAPHIRE Version 8.0 software. A brief discussion of the purpose and history of the software is included along with general information such as installation instructions, starting and stopping the program, and some pointers on how to get around inside the program. Next, database concepts and structure are discussed. Following that discussion are nine sections, one for each of the menu options on the SAPHIRE main menu, wherein the purpose and general capabilities for each option are furnished. Next, the capabilities and limitations of the software are provided.

99 GENERAL AND MISCELLANEOUS↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Code Reference Manual

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer. However, the INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users comprised of a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events, quantify associated damage outcome frequencies, and identify important contributors to this damage (Level 1 PRA) and to analyze containment performance during a severe accident and quantify radioactive releases (Level 2 PRA). It can be used for a PRA evaluating a variety of operating conditions, for example, for a nuclear reactor at full power, low power, or at shutdown conditions. Furthermore, SAPHIRE can be used to analyze both internal and external initiating events and has special features for transforming models built for internal event analysis to models for external event analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to both the public and the environment (Level 3 PRA). SAPHIRE includes a separate module called the Graphical Evaluation Module (GEM). GEM provides a highly specialized user interface with SAPHIRE that automates SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events in a very efficient and expeditious manner. This reference guide will introduce the SAPHIRE Version 7.0 software. A brief discussion of the purpose and history of the software is included along with general information such as installation instructions, starting and stopping the program, and some pointers on how to get around inside the program. Next, database concepts and structure are discussed. Following that discussion are nine sections, one for each of the menu options on the SAPHIRE main menu, wherein the purpose and general capabilities for each option are furnished. Next, the capabilities and limitations of the software are provided.

99 GENERAL AND MISCELLANEOUS↗

Effect of bedrest on circadian rhythms of plasma renin, aldosterone, and cortisol

Previous studies of normal men after 5 d of bedrest showed that circulatory instability on head-up tilt or standing is preceded by increased plasma renin activity (PRA) at bedrest. In the present study, the circadian rhythms of PRA, aldosterone, and cortisol have been observed in five normal men on a constant diet. In ambulatory controls, PRA and aldosterone increased normally after standing. On the third morning of bedrest, PRA was higher than before, and at noon, PRA was higher than in standing controls. The nocturnal peaks of PRA resulting from episodic renin secretion during sleep were higher after bedrest. Plasma aldosterone was also increased by bedrest. The findings are compatible with the theory that intermittent beta-adrenergic nerve activity during sleep is increased after bedrest, but other factors, such as loss of body sodium and a lower plasma volume, may also be involved.

Chavarri, M.↗

Effect of hydration on plasma vasopressin, renin, and aldosterone responses to head-up tilt

If plasma vasopressin (PVP), plasma renin (PRA), and plasma aldosterone (PA) responses to change in posture are mediated only by alterations in intrathoracic baroreceptor activity hydration status should have minimal influence on these responses. To test this hypothesis, six male subjects underwent 45 min of 70 deg head-up tilt (HUT) following 26 h dehydration, and again, 105 min later, following rehydration. Compared with preceding supine hydrated control values, PVP, PRA, and PA increased (p less than 0.001) during dehydrated HUT, but only PVP and PRA increased during rehydrated HUT (p less than 0.001). The dissociation during rehydrated HUT of PRA and PA may have been related more to the reduction (p less than 0.001) in plasma potassium concentration than to the accompanying decrease (p less than 0.001) in plasma osmolality and sodium concentration. Although increases in PVP and PRA during HUT were attenuated (p less than 0.01) following rehydration, this attenuation was associated with the absence of symptoms of overt hypotension following rehydration. However, since rehydration did not abolish the increases in PVP and PRA induced by HUT, it is concluded that the present observations support the concept of intrathoracic baroreceptor involvement in the regulation of vasopressin secretion and renin release.

Harrison, M. H.↗

Detection of dust impacts by the Voyager planetary radio astronomy experiment

The Planetary Radio Astronomy (PRA) instrument detected large numbers of dust particles during the Voyager 2 encounter with Neptune. The signatures of these impacts are analyzed in some detail. The major conclusions are described. PRA detects impacts from all over the spacecraft body, not just the PRA antennas. The signatures of individual impacts last substantially longer than was expected from complementary Plasma Wave Subsystem (PWS) data acquired by another Voyager experiment. The signatures of individual impacts demonstrate very rapid fluctuations in signal strength, so fast that the data are limited by the speed of response of the instrument. The PRA detects events at a rate consistently lower than does the Plasma Wave subsystem. Even so, the impact rate is so great near the inbound crossing of the ring plane that no reliable estimate of impact rate can be made for this period. The data are consistent with the presence of electrons accelerated by ions within an expanding plasma cloud from the point of impact. An ancillary conclusion is that the anomalous appearance of data acquired at 900 kHz appears to be due to an error in processing the PRA data prior to their delivery rather than due to overload of the PRA instrument.

Evans, David R.↗

Derivation of Failure Rates and Probability of Failures for the International Space Station Probabilistic Risk Assessment Study

National Aeronautics and Space Administration s (NASA) International Space Station (ISS) Program uses Probabilistic Risk Assessment (PRA) as part of its Continuous Risk Management Process. It is used as a decision and management support tool to not only quantify risk for specific conditions, but more importantly comparing different operational and management options to determine the lowest risk option and provide rationale for management decisions. This paper presents the derivation of the probability distributions used to quantify the failure rates and the probability of failures of the basic events employed in the PRA model of the ISS. The paper will show how a Bayesian approach was used with different sources of data including the actual ISS on orbit failures to enhance the confidence in results of the PRA. As time progresses and more meaningful data is gathered from on orbit failures, an increasingly accurate failure rate probability distribution for the basic events of the ISS PRA model can be obtained. The ISS PRA has been developed by mapping the ISS critical systems such as propulsion, thermal control, or power generation into event sequences diagrams and fault trees. The lowest level of indenture of the fault trees was the orbital replacement units (ORU). The ORU level was chosen consistently with the level of statistically meaningful data that could be obtained from the aerospace industry and from the experts in the field. For example, data was gathered for the solenoid valves present in the propulsion system of the ISS. However valves themselves are composed of parts and the individual failure of these parts was not accounted for in the PRA model. In other words the failure of a spring within a valve was considered a failure of the valve itself.

Vitali, Roberto↗

Probabilistic Risk Assessment for Decision Making During Spacecraft Operations

Decisions made during the operational phase of a space mission often have significant and immediate consequences. Without the explicit consideration of the risks involved and their representation in a solid model, it is very likely that these risks are not considered systematically in trade studies. Wrong decisions during the operational phase of a space mission can lead to immediate system failure whereas correct decisions can help recover the system even from faulty conditions. A problem of special interest is the determination of the system fault protection strategies upon the occurrence of faults within the system. Decisions regarding the fault protection strategy also heavily rely on a correct understanding of the state of the system and an integrated risk model that represents the various possible scenarios and their respective likelihoods. Probabilistic Risk Assessment (PRA) modeling is applicable to the full lifecycle of a space mission project, from concept development to preliminary design, detailed design, development and operations. The benefits and utilities of the model, however, depend on the phase of the mission for which it is used. This is because of the difference in the key strategic decisions that support each mission phase. The focus of this paper is on describing the particular methods used for PRA modeling during the operational phase of a spacecraft by gleaning insight from recently conducted case studies on two operational Mars orbiters. During operations, the key decisions relate to the commands sent to the spacecraft for any kind of diagnostics, anomaly resolution, trajectory changes, or planning. Often, faults and failures occur in the parts of the spacecraft but are contained or mitigated before they can cause serious damage. The failure behavior of the system during operations provides valuable data for updating and adjusting the related PRA models that are built primarily based on historical failure data. The PRA models, in turn, provide insight into the effect of various faults or failures on the risk and failure drivers of the system and the likelihood of possible end case scenarios, thereby facilitating the decision making process during operations. This paper describes the process of adjusting PRA models based on observed spacecraft data, on one hand, and utilizing the models for insight into the future system behavior on the other hand. While PRA models are typically used as a decision aid during the design phase of a space mission, we advocate adjusting them based on the observed behavior of the spacecraft and utilizing them for decision support during the operations phase.

dynamic fault trees↗

Dynamic Importance Measures in the ADAPT Framework

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until user-defined end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One current limitation of DDETs is the assessment of results, which is not as well developed as in traditional PRA. A concept that is used in PRA to assess the significance of a basic event is the concept of importance measures (IMs). In traditional PRA, IMs only consider the likelihood of occurrence of non-occurrence of a basic event. The application of importance measures to DDETs must take into consideration not only the occurrence and non-occurrence of an event, but also uncertain timing or severity. This work describes three general dynamic importance measures (DIMs) as implemented in the Analysis of Dynamic Accident Progression Trees (ADAPT) DDET driver code. The measures account for the change in progression of the DDET resulting from the different values of each uncertain variable under investigation. The DIMs are applied to a sample DDET to demonstrate the type of insights that may be gained from each one. These measures will facilitate comparison of the impact of dynamic branching events on a consequence of interest, which also allow DDETs to be used in prioritizing plant investments. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Statistical Testing Approach for Quantifying Software Reliability; Application to an Example System

The U.S. Nuclear Regulatory Commission (NRC) encourages the use of probabilistic risk assessment (PRA) technology in all regulatory matters, to the extent supported by the state-of-the-art in PRA methods and data. Although much has been accomplished in the area of risk-informed regulation, risk assessment for digital systems has not been fully developed. The NRC established a plan for research on digital systems to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems in the PRA's of nuclear power plants (NPPs), and, (2) incorporating digital systems in the NRC's risk-informed licensing and oversight activities. Under NRC's sponsorship, Brookhaven National Laboratory (BNL) explored approaches for addressing the failures of digital instrumentation and control (I and C) systems in the current NPP PRA framework. Specific areas investigated included PRA modeling digital hardware , development of a philosophical basis for defining software failure , and identification of desirable attributes of quantitative software reliability methods . Based on the earlier research, statistical testing is considered a promising method for quantifying software reliability. It is widely recognized that software failures are due to the triggering of pre-existing defects by the software's operational environment. Software defects can arise from errors made in user requirements or coding errors introduced during the developmental process. The software's operational environment includes factors such as the time history of digital system inputs, communication interfaces, the internal state of the digital system, and external conditions. Thus, software reliability is a function of both the number of pre-existing defects and the presence of a triggering condition caused by the manner in which the software is used. In this paper, we describe a statistical software-testing approach for quantifying software reliability and applied it to the loop-operating control system (LOCS) of an experimental loop of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The work involved collaboration between BNL and INL. The objectives of the study include: (1) Development of a statistical testing approach for estimating software failure probability on demand, the results of which are suitable for including in a probabilistic risk assessment (PRA); and, (2) Application of the approach to the LOCS to estimate its failure probability, and obtain insights into the feasibility, practicality, and usefulness of the estimation in models of digital systems for inclusion in nuclear power plants' PRAs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗