Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Enhancing Power Resilience for Remote Communities: A Comprehensive Renewable Energy Solution for Itbayat Island

The island of Itbayat, Philippines, faces significant challenges in maintaining a reliable and resilient power supply due to its current reliance on a vulnerable power distribution system managed by a local electric cooperative. The existing infrastructure, which includes diesel generators and a radial network configuration with some above-ground lines, is highly susceptible to frequent typhoons and adverse weather conditions. These factors, combined with inadequate staffing and high operational costs, result in frequent power outages that disrupt daily life and hinder economic development. This white paper proposes a comprehensive solution to enhance the resilience and reliability of Itbayat's power system by integrating renewable energy sources, specifically solar photovoltaic (PV) systems, battery storage, and a microgrid controller. The proposed solution aims to reduce dependency on diesel fuel, optimize energy use, and provide a sustainable and robust power supply for the island. Key components of the solution include: 1. Solar PV Installation: Deploying solar PV panels to harness abundant solar energy, reducing reliance on diesel fuel. 2. Battery Storage Systems: Installing battery storage to store excess solar energy and ensure a continuous power supply during low solar generation periods. 3. Microgrid Controller: Implementing a microgrid controller to manage and optimize the integration of solar PV, battery storage, and existing diesel generators. The proposed solution addresses several critical issues, including system vulnerability, generator dependency, and operational inefficiencies. By adopting this innovative approach, Itbayat Island can achieve a more resilient, efficient, and sustainable energy infrastructure, ensuring a stable power supply for its residents and enhancing overall energy security.

14 SOLAR ENERGY↗

Solar vs. Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions. The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. The 4.5 meter (m) diameter pathfinder lander's primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander's In Situ Resource Utilization (ISRU) payload would demonstrate liquid oxygen propellant production using atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept's propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept's propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,116 to 2,396 kg, versus the 2,686 kg fission power scheme. However, solar power masses are expected to approach or exceed the fission payload mass at landing sites further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling. Next, the team developed a solar-powered point design solution for a conceptual four-crew, 500-day surface mission consisting of up to four landers per crewed expedition mission. Unlike the demonstration mission, a lengthy power outage due to the global dust storms that are known to occur on Mars would pose a safety hazard to a crewed mission. A similar fission versus solar power trade study performed by NASA in 2007 concluded that fission power was more reliable-with a much lower mass penalty-than solar power for this application. However, recent advances in solar cell and energy storage technologies and changes in operational assumptions prompted NASA to revisit the analysis. For the purpose of this exercise a particular landing site at Jezero Crater, located at 18o north latitude, was assumed. A fission power system consisting of four each 10 kW Kilopower fission reactors was compared to a distributed network of Orion-derived Ultraflex solar arrays and Lithium ion batteries mounted on every lander. The team found that a solar power system mass of about 9,800 kg would provide the 22 kilowatts (kW) keep-alive power needed to survive a dust storm lasting up to 120-days at average optical depth of 5, and 35 kW peak power for normal operations under clear skies. Although this is less than half the mass estimated during the 2007 work (which assumed latitudes up to 30o) it is still more than the 7,000 kg mass of the fission system which provides full power regardless of dust storm conditions.

Rucker, Michelle A.↗

Understanding Resilience Valuation for Energy Systems: An Overview of the NREL-NYSERDA Research Collaboration

Energy resilience has become a national priority as Americans experience more power outages attributed to climate change, extreme weather, and cyber events. Energy system owners and operators recognize that they must prepare differently for outages today than they did in the past. Decision makers at all levels face unique challenges and opportunities in effectively and equitably executing a transition to more resilient power systems. The New York State Energy Research and Development Authority (NYSERDA) recently added resilience to its mission statement. The authority engaged with the National Renewable Energy Laboratory (NREL) in a collaborative effort to: 1) understand options for measuring and valuing resilience investment benefits, and 2) inform how resilience could be operationalized across NYSERDA initiatives and program areas.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Overcoming Resilience Challenges on the Outer Banks of North Carolina

In 2021, the Town of Nags Head, located in the Outer Banks region of North Carolina, was among the first cohort of coastal and island communities to participate in the U.S. Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP), which offers technical assistance and cash awards to competitively selected coastal, remote, and island communities seeking to transform their energy systems and increase their energy resilience. As a barrier island separated from mainland North Carolina, Nags Head experiences impacts from extreme weather events, including power outages, especially during hurricane season. To address challenges, the Nags Head ETIPP team sought to improve the town's disaster resilience by ensuring that critical facilities can remain powered during and after extreme events. With support from experts at Sandia National Laboratories, the National Renewable Energy Laboratory, and the Coastal Studies Institute, the community team identified the following goals for its participation in ETIPP: 1. Identify and prioritize critical facilities that, when powered during disruptions, support the town's resilience. 2. Analyze the potential for on-site solar photovoltaic (PV) and storage systems at 2-4 prioritized critical facilities owned and/or operated by the town. 3. Analyze the potential for interconnecting solar PV and storage systems at a cluster of public and privately owned facilities into a resilient microgrid. 4. Explore finance options and utility interconnection requirements and compensation mechanisms. 5. Summarize outcomes and next steps for town leadership.

25 ENERGY STORAGE↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗

Lightning location system supervising Swedish power transmission network

For electric utilities, the ability to prevent or minimize lightning damage on personnel and power systems is of great importance. Therefore, the Swedish State Power Board, has been using data since 1983 from a nationwide lightning location system (LLS) for accurately locating lightning ground strikes. Lightning data is distributed and presented on color graphic displays at regional power network control centers as well as at the national power system control center for optimal data use. The main objectives for use of LLS data are: supervising the power system for optimal and safe use of the transmission and generating capacity during periods of thunderstorms; warning service to maintenance and service crews at power line and substations to end operations hazardous when lightning; rapid positioning of emergency crews to locate network damage at areas of detected lightning; and post analysis of power outages and transmission faults in relation to lightning, using archived lightning data for determination of appropriate design and insulation levels of equipment. Staff have found LLS data useful and economically justified since the availability of power system has increased as well as level of personnel safety.

Melin, Stefan A.↗

Power System Resilience Considering Hurricane Storms and Generator Step-up Transformers

Power system resilience describes the system’s ability to withstand and recover quickly from unexpected power outages due to extreme events. As society’s electrification continues at a rapid rate, it is imperative electric infrastructure is designed and operated with extra security. This work studies the impact of severe hurricane storms on the power system located along the United States’ Eastern Seaboard. Specific focus is designated to steady state system operation and loss of large generation step up power transformers. A series of phasor domain power system simulations are conducted to determine the critical point at which the system loses steady state operability. Additionally, active power load shedding and generator dispatching are studied as mitigation and recovery strategies. Results indicate generator dispatching as an effective proactive mitigation strategy and load shedding as an effective recovery strategy.

Liu, Yilu↗

Modeling the impact of extreme summer drought on conventional and renewable generation capacity: Methods and a case study on the Eastern U.S. power system

Across recent years, there has been a growing prevalence of extreme weather events throughout the United States, posing significant challenges to the reliable and resilient operation of power systems. Specifically, summer droughts threaten to severely reduce available generation capacity to meet regional electricity demand, potentially leading to power outages. This underscores the importance of accurate resource adequacy (RA) assessment to ensure the reliable operation of the nation’s energy infrastructure. Accurately evaluating the usable capacity of regional generation fleets is a challenging undertaking due to the intricate interactions between power systems and hydro-climatic systems. Here, this paper proposes a systematic and analytical framework to evaluate the impacts of extreme summer drought events on the available capacity of various generating technologies, incorporating both meteorological and hydrologic factors. The framework provides detailed plant-level capacity derating models for hydroelectric, thermoelectric, and renewable power plants, facilitating evaluations with high temporal and spatial resolution. The application of the proposed impact assessment framework to the 2025 generation fleet of the real-world power system within the PJM and SERC regions of the United States yields insightful results. By analyzing the daily usable capacity of 6,055 at-risk generators across the study region, it shows that the summer capacity deration is most significant for hydroelectric and once-through thermal power plants, followed by recirculating thermal power plants and combustion turbines. In the event of the recurrence of the 2007 southeastern summer drought event in the near future, the generation fleet could experience a substantial reduction in available capacity, estimated at approximately 8.5 GW, compared to typical summer conditions. The sensitivity analysis reveals that the usable capacity of the generation fleet would suffer an even more significant decrease under conditions of increasingly severe summer droughts. The proposed approach and the findings of this study provide valuable methodologies and insights, empowering stakeholders to bolster the resilience of power systems against the potentially devastating effects of future extreme drought events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Intelligence Measurements and Sensor Systems (AIMS): Gaussian Processes in Remote Sensing: Literature Review

Power grid resilience and reliability is crucial to supporting critical infrastructure. Service interruptions can have devastating consequences to communication, emergency, and transportation services, just to name a few. In addition to infrastructure, power services are crucial to everyday life. Nearly every element of modern-day living relies on a stable and functioning power grid - heating and cooling systems to lighting, refrigeration, telecommunications, and internet access. Interruptions in the power supply can range from minor inconveniences, such as the temporary loss of internet or television services, to more significant problems, like the inability to access medical equipment or emergency services during critical situations. As climate conditions worsen, the reliability of the power grid becomes even more significant. Extreme weather events, such as hurricanes, wildfires, or severe storms, can cause serious damage to power infrastructure, leading to prolonged power outages. Rising temperatures and changing weather patterns can strain the grid, resulting in increased demand for electricity, stressing transmission and distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Distribution System Restoration Using Distributed Energy Resources and Tie-Switches

Distributed energy resources (DERs), such as solar PVs and energy storage, can be used to restore distribution system critical loads after the extreme weather events to increase grid resilience. However, coordinating multiple DERs together with tie-switches for multi-step restoration process under renewable uncertainty is challenging. This paper proposes a deep reinforcement learning to control discrete actions of switching on/off tie switches and DERs for critical load restoration. The restoration problem is first cast into the Markov decision process suitable for DRL. Then, the original soft actor critic (SAC) method for continuous actions has been extended to handle discrete and continuous actions. Numerical comparison results with other stochastic optimization-based approaches on the modified IEEE 33-bus system show that the proposed method can achieve fast critical load restoration in the presence of substation power outage while maintaining system voltage limit throughout the restoration process.

active distribution systems↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

Case Study: Seattle Waterfront Networked Microgrid Evaluation - Case Study for Port Electrification Handbook

Many ports and waterfronts are evaluating alternative electrification efforts, including electrification of passenger and vehicle ferries. In Seattle, the Washington State Department of Transportation, in conjunction with Seattle City Light (the local utility) and the Port of Seattle, are working to deploy a hybrid electric ferry and provide charging at Seattle’s Colman dock. As part of this ferry electrification effort, Seattle City Light is considering including a large battery energy storage system (BESS) to help “buffer” the ferry charging. The “buffer” provides energy arbitrage and spreads out the large amount of power needed to recharge the ferry to times when the ferry is out of the dock – rather than one very large peak for 15 minutes, the battery storage allows it to be a smaller power value over a longer duration. This initial BESS concept served as the jumping off point to explore an expanded microgrid concept via a notional test system that incorporates additional distributed energy resources (DER) and infrastructure upgrades to the local distribution infrastructure at the Seattle Waterfront and neighboring Port of Seattle properties. This case study examined the potential for secondary use of the BESS within a networked microgrid during the scenario of a large-scale power outage, such as a natural disaster.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Shape Control of Solar Collectors Using Shape Memory Alloy Actuators

Solar collectors that are focused on a central receiver are designed with a mechanism for defocusing the collector or disabling it by turning it out of the path of the sun's rays. This is required to avoid damaging the receiver during periods of inoperability. In either of these two cases a fail-safe operation is very desirable where during power outages the collector passively goes to its defocused or deactivated state. This paper is principally concerned with focusing and defocusing the collector in a fail-safe manner using shape memory alloy actuators. Shape memory alloys are well suited to this application in that once calibrated the actuators can be operated in an on/off mode using a minimal amount of electric power. Also, in contrast to other smart materials that were investigated for this application, shape memory alloys are capable of providing enough stroke at the appropriate force levels to focus the collector. Design and analysis details presented, along with comparisons to test data taken from an actual prototype, demonstrate that the collector can be repeatedly focused and defocused within accuracies required by typical solar energy systems. In this paper the design, analysis and testing of a solar collector which is deformed into its desired shape by shape memory alloy actuators is presented. Computations indicate collector shapes much closer to spherical and with smaller focal lengths can be achieved by moving the actuators inward to a radius of approximately 6 inches. This would require actuators with considerably more stroke and some alternate SMA actuators are currently under consideration. Whatever SMA actuator is finally chosen for this application, repeatability and fatigue tests will be required to investigate the long term performance of the actuator.

Lobitz, D. W.↗

Improved Emergency Egress Lighting System for the ISS

Emergency lights provide illumination in corridors, stairwells, ramps, escalators, aisles, and exit passageways during power failures. Safety and visibility are critical during a power outage. If emergency lights fail to operate properly, the building occupants can become disoriented. Four documents in a collection discuss different topics relating to a proposed improved emergency egress lighting system (EELS) for the International Space Station (ISS). While the present EELS is designed around rows of green-light-emitting diodes, the proposed system contains strips of electroluminescent tape using different colors for each egress path. The proposed EELS can be powered by the same battery currently used by the present EELS, but would require an inverter because electroluminescent devices require AC. Electroluminescent devices also require significantly less current and, depending on the color, would emit 3 to 8 times the light of the present EELS. In addition, they could operate for up to 75 hours (versus .20 minutes for the present system). The first document contains a one-page summary of the proposal and an evaluation of technical merit. The second document summarizes the motivation for, and the design of, the proposed EELS. The third document addresses relevant aspects of the measurement of spectral sensitivity and the psychophysics of perception of light. The fourth document presents additional background information and technical specifications for the electroluminescent tapes.

Eaton, Leslie L.↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗