Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power distribution unit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unlocking load growth at the grid edge: Practices for managing, recovering, and allocating distribution system investments

Utilities and utility regulators are preparing to make significant investments in the electricity distribution system driven by expected load growth in coming years and decades. Regulators will be tasked with vetting investment proposals and implementing cost recovery and allocation mechanisms. In particular, state regulators are anticipating the need to make proactive distribution system investments, building the capability to serve new load in advance of demand. This report focuses on load growth from homes and businesses that adopt electric vehicles and heat pump heating technologies. Through a review of legislation and regulatory dockets in a subset of states, we provide insights into emerging utility and regulatory practices to recover and allocate costs of electrification-driven distribution system investments necessary to accommodate these technologies. Our review focused on utility electrification programs, line extension policies, and proactive investments. Our report is largely descriptive, offering detailed information about approaches different state commissions and utilities have implemented to inform future decision-making.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scalability of Real-time Distribution Models

This work will focus on developing the capabilities and validating the models for a sub transmission network with multiple feeders and microgrids. To achieve this scale of Hardware-in-the-loop (HitL) simulation, it is necessary to federate and collaborate. The work aims to design the large-scale feeder models to allow federation with complementary testbeds in the future. The feeder would be designed to be reconfigurable to put the system into a variety of modes. Aggregators models will be included in each distribution network’s federate to take control actions and interact with the management systems. Lastly, the feeder model will support large scale resilience studies involving complex Distributed Energy Resources (DER) controls, microgrid studies and emulation of complex data flows in future grid architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal operation of multi-plant steam district heating systems for enhanced efficiency and sustainability

Despite their crucial role in supplying heat and power to universities, industries, and healthcare facilities, many steam-based district heating systems rely on outdated control methods. Among these, multi-central plant districts are particularly challenging due to the complexities of coordinating multiple plants, optimizing load distributions, and managing system downtime. In response, new operational strategies are developed to enhance the efficiency and sustainability of steam districts while utilizing existing resources. These strategies include reducing plant operational pressure without compromising the reliable supply to buildings and optimizing load allocation across multiple plants. The load allocation considers boiler part-load efficiency, runtime, network losses, and building pressure set points, and is compared with traditional multi-boiler controls. To support this exploration, new dynamic Modelica models are developed. In addition, methods to reduce modeling complexities are incorporated, enhancing their suitability for practical applications. A holistic district-wide analysis using a real university case study demonstrates a 4.7% fuel savings by lowering boiler operational pressure from 900 kPa to 600 kPa, along with a 13.3% reduction in condensation losses across the distribution network. Furthermore, the load allocation approach results in a 13.1% reduction in fuel consumption during peak winter periods and 15.3% during shoulder periods, with corresponding decreases in carbon emissions and fuel costs. This approach can also save maintenance costs by reducing the boiler runtime by 49.6%. In conclusion, this research underscores the benefits of retrofitting aging steam district heating systems, offering immediate operational improvements by enhancing efficiency, meeting regulatory compliance, and extending infrastructure lifespans while delaying costly overhauls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Single-Phase to Split-Phase Inverters with Advanced Grid Support Functions for Grid-Interactive Applications

This work presents a cost-effective single-phase to split-phase inverter with a reduced switch count, achieving grid interactive performance while maintaining operational efficiency. The proposed system integrates an Andronov-Hopf oscillator based secondary controller, which inherently embeds a nonlinear resistive droop architecture, ensuring rapid dynamic response. A Lyapunov energy function-based primary control enhances transient stability and regulation, while an internal model-based point of common coupling voltage estimation enables cost optimization without additional sensors. Equipped with advanced grid support functionalities, the inverter facilitates seamless distribution system operation with enhanced robustness. The effectiveness of the proposed architecture and control strategy is validated through MATLAB/Simulink and PLECS simulations, demonstrating its feasibility for high-performance grid-supportive applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resources and Storage [Slides]

This training offers an overview of distributed energy resources and storage, drawing on examples from the Energy Technology Innovation Partnership Project. Examples of community technical assistance projects included in this training include projects in Guam and Deer Island and Stonington, Maine.

24 POWER TRANSMISSION AND DISTRIBUTION↗

End-to-end microgrid protection using distributed data-driven methods

This paper introduces an end-to-end microgrid protection framework that offers real-time system monitoring, fault-related decision making, and circuit breaker control. This is achieved through the design of distributed data-driven techniques based on the support vector machine method, where each relay is responsible for distributed data collection, fault detection, fault localization, and fault isolation. Local communication is established among neighboring relays, fostering cooperative fault localization and isolation. This decentralized design not only reduces the computational and communication requirements but also enables the adaptability of each relay under varying operational dynamics. The proposed end-to-end protection framework was validated using MATLAB/Simulink simulations on a 100% renewable microgrid, achieving an accuracy of 93.1% with response time of 0.0523 s, in protecting against a range of fault scenarios that are characterized by various types, locations, impedances, load conditions, photovoltaic power levels, and microgrid operating modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Networked Microgrid Topology Reconfiguration to Promote Fairness in Proactive Load Shedding

Increasing occurrences of natural disasters and grid emergency events consistently challenge the safe and reliable operations of power systems. During such emergency situations, system operators may proactively shed load to mitigate risks. However, uncoordinated implementation of load shedding may disrupt electricity supply and even lead to cascading failures. Meanwhile, it is crucial to address potential biases affecting different customers when executing load shedding. This paper addresses the dynamic topology reconfiguration problem for networked microgrids with distributed energy resources under emergency conditions. Specifically, we propose a novel rolling-horizon optimization model that integrates fairness-aware constraints into the networked microgrid topology reconfiguration. Unlike existing approaches that focus solely on efficiency or apply fairness considerations in static settings, our method explicitly incorporates temporal fairness constraints to restrict repeated or excessive load curtailment for load blocks. Moreover, the fairness-aware constraints are specifically developed for the context of dynamic networked microgrid topology reconfiguration, and are designed to be convex or amenable to linear reformulations, which offers a more tractable alternative to traditional models with non-convex formulations. Numerical studies on a modified IEEE 13-bus system and a larger-sized SMART-DS networked microgrid system demonstrate the performance of the proposed algorithm towards more fairness-aware networked microgrid topology reconfiguration decision-making.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Driven Modeling of High-Resolution Residential Load Profiles Using Low-Resolution Smart Meter Measurements

Accurate and high-resolution residential load profiles are essential for power system modeling, demand response planning, and effective grid operation. As the energy sector moves towards a more actively managed distribution system, the ability to understand residential energy consumption at a minute-by-minute scale becomes increasingly critical. High-resolution load profiles provide key insights into demand patterns and user behavior, enabling grid operators to design more effective energy solutions; however, residential load measurements in the field are typically recorded at low resolutions, such as 15-60 minutes, which makes it hard to study the characteristics of different residential customers. This paper addresses these challenges by introducing a data-driven approach to generate realistic, high-resolution residential load profiles based on lowre-solution measurements and weather information. The proposed method retains the key features of the actual residential load measurements while offering appliance-level energy consumption details for each residential building. The results demonstrate the effectiveness of the proposed load profile generator, proving its capability to support utilities in optimizing residential energy management and ensuring a more reliable and resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Modernization of Cooperatives and Municipal Utilities via Breakthrough System Monitoring, Control and Optimization (CRADA Final Report)

This project aims at developing and demonstrating successful implementation of breakthrough approaches in real-time data visualization as well as real-time distributed DER control and optimization to provide ample benefits to both utilities and end users. The National Renewable Energy Laboratory (NREL), Holy Cross Energy (HCE), National Rural Electric Cooperative Association (NRECA) and Survalent are collaborating to enable Cooperative and Municipal utilities to fully leverage DERs as part of their strategies for providing safe, reliable, and affordable electric services to their customers and help meet DOE Grid modernization goal of achieving at least 10% active devices to provide grid flexibility by 2035. This project will use novel real-time control algorithms and approaches for distributed control recently developed under DOE-funded projects, using the date from the Survalent’s basic SCADA engine, GIS and AMI engines deployed at HCE combined with NRECA’s globally-used MultiSpeak(R) software interoperability specification for seamless and real-time communications between electric utility enterprise software to embrace DER as part of their strategies for providing safe, reliable and affordable electric service to their customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decoding Resilience by Modeling Outage and Restoration Processes in Distribution Grids: A Pittsburgh Case Study

Climate-induced extreme weather events, such as floods and heatwaves, pose significant challenges to the resilience of urban power distribution grids. This paper examines the outage and restoration dynamics of Pittsburgh's power grid during the flood event in April 2024 and three heatwaves in June, July, and August 2024. We introduce a comprehensive modeling framework that integrates outage and restoration processes, enabling the quantification of resilience metrics, including total customer-hours of power outage, maximum residual values, and restoration durations across various ZIP codes. Our analysis highlights spatial disparities in outage impacts and restoration efficiencies, with ZIP Code 15222 experiencing the highest cumulative disruptions, while ZIP Code 15217 shows lower susceptibility. By linking statistical trends with weather events, this study underscores the critical need for targeted infrastructure upgrades and advanced restoration strategies. Furthermore, the proposed framework offers valuable insights for planning and managing resilient power systems in the face of increasing climate stress.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development and Experimental Validation of a High-Power DC Distribution Testbed for Advanced Charging Infrastructure and Energy Management

This paper presents the development of a hardware testbed for DC-distributed high-power charging (HPC) stations. As DC distributed solutions emerge as a viable solution to optimize HPC site operations, challenges such as interoperability, protection, and seamless integration of distributed energy resources (DER) persist. These issues underscore the need for a robust testing facility to investigate compliance of available commercial off-the-shelf (COTS) market devices. The developed testbed features a DC-distributed charging hub including a charger, emulated energy storage system (ESS), and site level communication and controller implementation. It facilitates the testing of COTS hardware, charger prototypes, standards validation and site energy management system (SEMS) controllers at rated power. This paper details the development of the charging infrastructure platform, implementation of communication system, validation of different SEMS algorithms, and understanding improvements required for future expansion. Using the developed testbed, interoperability gaps for SEMS implementation with multi-vehicle concurrent charging via a multi-port charger are experimentally observed. Aimed at supporting the transition to large-scale EV charging infrastructure deployment and DER integration, this testbed plays a crucial role in conformity testing of COTS device interoperability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A matheuristic for design and dispatch of a utility-connected distributed energy system

Modeling distributed power generation systems often requires complicated mathematical expressions that present challenges for commercial optimization solvers. Here, this paper presents a matheuristic to solve a mixed-integer optimization model that informs decisions regarding the design and dispatch of a utility-connected microgrid. We deploy a genetic algorithm to search the system design space and a linear program to solve the economic dispatch problem. The model is a component of a web tool that requires solutions within a few minutes. Our method yields objective function values within 5% of an exogenously produced optimal in fewer than 30 seconds for 90% of our test cases compared to only 10% of our test cases by a traditional optimization solver in the same amount of time.

24 POWER TRANSMISSION AND DISTRIBUTION↗