Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power asset utilization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

Development of Miniaturized High-Temperature Multi-Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings.

20 FOSSIL-FUELED POWER PLANTS↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2022

A summary of NREL's good stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, infrastructure and capability upgrades, and examples of R&D impact. In fiscal year 2022, ESIF researchers made breakthroughs in everything from long-duration energy storage and cybersecurity visualizations to a world record in heavy-duty hydrogen vehicle fueling, and built out research assets to advance microgrid operation and controls, renewable hydrogen production, electric vehicles, energy-efficient buildings, and more.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Human Mars Transportation Applications Using Solar Electric Propulsion

Advanced solar electric power systems and electric propulsion technology constitute viable elements for conducting human Mars transfer missions that are roughly comparable in performance to similar missions utilizing alternative high thrust systems, with the one exception being their inability to achieve short Earth-Mars trip times. A modest solar electric propulsion human Mars scenario is presented that features the use of conjunction class trajectories in concert with pre-emplacement of surface assets that can be used in a series of visits to Mars. Major elements of the Mars solar electric transfer vehicle can be direct derivatives of present state-of-the-art Solar array and electric thruster systems. During the study, several elements affecting system performance were evaluated, including varying Earth orbit altitude for departure, recapturing the transfer stage at Earth for reuse, varying power system mass-to-power ratio, and assessing solar array degradation on performance induced by Van Allen belt passage. Comparisons are made to chemical propulsion and nuclear thermal propulsion Mars vehicles carrying similar payloads.

Donahue, Benjamin B.↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

Technology Strategy Assessment: Findings from Storage Innovations 2030 Thermal Energy Storage

The concept of thermal energy storage (TES) can be traced back to early 19th century, with the invention of the ice box to prevent butter from melting. Modern TES development began with building heating and cooling and concentrated solar thermal technologies for power generation in the early 1900s and late 1970s, respectively. TES systems provide many advantages compared with other long-duration energy storage (LDES) technologies, which include low costs, long operational lives, high energy density, synchronous power generation capability with inertia that inherently stabilizes the grid, and the ability to output both heat and electricity. TES Use Cases TES technologies can couple with most renewable energy systems, including wind, photovoltaic, and concentrated solar thermal energy, and can be used for heat-to-heat, heat-to-electricity, electricity-to-heat, and electricity-to-electricity (bidirectional electricity) applications. The three types of TES that have heat as an input or output are grouped together for the purposes of this report. Retrofitting retired thermal power plants can be a potential cost-effective option for TES with electricity output because they both use a similar thermal-to-electricity type of conversion. Additionally, TES can directly serve heat demand for buildings and industrial processes, displacing fossil fuels to achieve broad decarbonization. Bidirectional Electricity Figure 1 shows a bidirectional electricity TES (ETES) architecture that is emerging as a prime technology for LDES at a grid scale. The ETES technology can utilize existing TES technology infrastructures, has no geological limitations (such as mountains and water for pumped storage hydro, underground natural caverns for compressed-air energy storage, etc.), and is capable of deployment anywhere in the United States and the world for broad uses. Particularly, ETES technology can be placed at retired fossil-fueled thermal power plants to reuse decommissioned assets, protect job security in associated communities, and provide resilient and high-inertia (i.e., spinning) power to the grid. Heat Input and Output There also are many ways to integrate TES within heat-to-electricity, heat-to-heat, and electricity-to-heat applications, such as those used in concentrating solar power (CSP), buildings, district heating, and industry process heat applications. These categories can be further classified for low- and high-temperature applications. High-temperature thermal energy storage (HTTES) heat-to-electricity TES applications are currently associated with CSP deployments for power generation. TES with CSP has been deployed in the Southwestern United States with rich solar resources and has proved its value to the electric grid. Electricity-to-heat and heat-to-heat HTTES applications present great potential for decarbonizing energy-intensive industrial process heat applications [8, 9], such as iron ore processing, iron smelting, cement production, glass manufacturing, mineral processing, and chemical production. Some industrial processes require process heat at temperatures > 1,400°C, so HTTES can be utilized to reduce fuel consumption in those processes through fuel, oxidizer, and process material pre-heating. Thermal energy storage for augmenting existing industrial process heat applications makes a much more attractive economic case because the energy penalty due to thermal-to-electric conversion is eliminated. Co-located applications of power production and heat also can add to the value stacking of integrating utility-scale TES; however, these scenarios are very case specific and not practically possible in many cases. These constraints are primarily attributed to the existing infrastructure being designed, developed, and constructed for many decades around the most economically feasible technologies, such as electricity and a selection of fossil fuels for heat input. Low-temperature TES can be utilized for building and district heating and cooling, as well as some process heat applications in electricity-to-heat and heat-to-heat configurations. Lower temperature TES (LTTES) can be added to heat pump equipment (electric input), either directly interacting with the refrigerant in the condenser or evaporator, or through a secondary heat transfer fluid. It also can be integrated in the building envelope or within the ducts of the heating, ventilation, and air conditioning (HVAC) system. Cost-effective integration of TES into buildings adds significant cost, and it is one of the key barriers preventing the commercialization and deployment of TES. The optimal strategy for integrating TES with buildings has yet to be determined for various applications of TES. Nevertheless, thermal storage materials are far less costly per unit of energy stored than electricity storage materials. This means that thermal storage has the potential to reduce the cost to society of energy storage.

25 ENERGY STORAGE↗

Online Detection of Inter-Turn Winding Faults in Single-Phase Distribution Transformers Using Smart Meter Data

Turn-to-turn faults between primary windings due to insulation degradation are a major cause of distribution transformer failure, and occur due to high levels of stress such as overloading and overheating. An additional consequence of these faults is an increased voltage on the transformer secondary due to effective change in turns ratio. This paper develops a novel method for early detection of insulation degradation and subsequent inter-turn winding failure by monitoring the transformer secondary voltage. The algorithm is based on a cumulative sum (CUSUM) statistic and compares voltages on neighbouring transformers to flag degrading assets. Results obtained from simulation as well as experimental data show that smart meter measurements can be utilized to achieve very high detection accuracy while keeping costs low. Here, the paper also demonstrates the validity of the algorithm in the presence of measurement noise, residential solar power injection etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methodology to Calibrate Fragility Curves Using Limited Real-World Data

With increasing human dependence on electricity and increasing energy demand, electrical infrastructure has emerged to be one of the most critical services. This is one of the main reasons for making the power grid more resilient to extreme events during which uninterrupted power supply is crucial in keeping the consequences of the extreme event limited. The first step towards making the overall power grid more resilient is to evaluate the probabilities of failure for all assets at risk from the excitation caused by extreme events. Thus, this paper presents the methodology to calibrate fragility curves. The strength of the proposed approach is its ability to calibrate the fragility curves utilizing limited data, which is the most common constraint in carrying out such analyses. This paper describes the calibration of transmission tower fragility curves for Puerto Rico utilizing only damage reports for hurricane Maria. That, combined with Puerto Rico's wind modeling & geographic information system, this study also calibrates fragility curves for transmission towers made with four different construction materials.

Bereta dos Reis, Fernando↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide was developed to improve decision-making in the electricity planning process by strengthening dialogue between electricity system planners and stakeholders throughout the process. This document was created for anyone who is first getting exposed to scenario results from power system planning models, or for those who are beginning to interact with power system modelers. It does not assume any experience with power system modeling, or familiarity with electricity planning concepts. This guide can be helpful to a wide range of people, including but not limited to state utility commissioners and commission staff, state energy offices, and intervenors in the planning process. It is targeted to those who are evaluating or reviewing model results presented by a utility, which typically span utility-scale generation and storage (and associated transmission) assets. This guide is designed to provide enough background and guidance that stakeholders can formulate and ask questions to evaluate model results through a deeper understanding of the key assumptions, data, and methods that drive decision outcomes. The ultimate purpose of this work is to increase transparency in the electricity planning process by enabling stakeholders to better engage and evaluate model results. A follow-on guide will provide a deeper dive into emerging topics, which are expected to become more prominent in the electricity planning process, but whose methods and approaches are still being refined.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Changes in Hydropower Resource Operations Following Participation in the CAISO Energy Imbalance Market - A Case Study

Portland General Electric (PGE), an investor-owned electric utility serving nearly 900,000 customers in 51 Oregon cities, joined Western Energy Imbalance Market (EIM) – a California Independent System Operator (CAISO) platform for sharing cleaner and more efficient generation resources among multiple states in the Western U.S. While participation in EIM brings a new set of economic opportunities for PGE by capturing flexibility needs in the market, it also changes operational patterns (e.g., more frequent start/stop, off-nominal power output, and ramping) of PGE’s conventional generation fleet, including hydropower units. With 492 MW of hydropower capacity, which constitutes 15\% of PGE’s generation mix, it is important for PGE (as any other EIM-participant utility) to understand how participation in EIM impacts its hydropower assets, and how a techno-economically sustainable operation of those assets could be accomplished. In this paper, a case study is performed with PGE's hydropower generation facilities to assess and quantify EIM-participation driven changes in hydropower operational patterns.

hydropower, operational patterns, energy imbalance↗