Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The Zwicky Transient Facility: Surveys and Scheduler

Presented here is a novel algorithm for scheduling the observations of time-domain imaging surveys. Our integer linear programming approach optimizes an observing plan for an entire night by assigning targets to temporal blocks, enabling strict control of the number of exposures obtained per field and minimizing filter changes. A subsequent optimization step minimizes slew times between each observation. Our optimization metric self-consistently weights contributions from time-varying airmass, seeing, and sky brightness to maximize the transient discovery rate. We describe the implementation of this algorithm on the surveys of the Zwicky Transient Facility and present its on-sky performance.

79 ASTRONOMY AND ASTROPHYSICS↗

Options for Subscale Maturation of Advanced Reactor Technologies Testing for Nuclear Thermal Propulsion

Several options could be implemented to establish an irradiation testing capability suitable for investigation of the performance of multiple nuclear thermal propulsion fuel elements at prototypic conditions. The prototypic conditions of interest are based on the current needs of the National Aeronautics and Space Administration’s Space Nuclear Power Program. The results of such testing are also intended to reduce the risks currently seen for any future subscale or full-scale ground testing of an engine-reactor system. The optimal solution is dependent upon several factors such as performance, cost, availability, schedule, technology readiness level, and plans for future testing in the SNP Program. Three options, based on different combinations of these factors, are considered in this report.

33 ADVANCED PROPULSION SYSTEMS↗

The XRISM Science Data Center: Optimizing the Scientific Return from a Unique X-ray Observatory

The X-Ray Imaging and Spectroscopy Mission, XRISM, is currently scheduled to launch in 2022 with the objective of building on the brief, but significant, successes of the ASTRO-H (Hitomi) mission in solving outstanding astrophysical questions using high resolution X-ray spectroscopy. The XRISM Science Operations Team (SOT) consists of the JAXA-led Science Operations Center (SOC) and NASA-led Science Data Center (SDC), which work together to optimize the scientific output from the Resolve high-resolution spectrometer and the Xtend wide-field imager through planning and scheduling of observations, processing and distribution of data, development and distribution of software tools and the calibration database (CaldB), support of ground and in-flight calibration, and support of XRISM users in their scientific investigations of the energetic universe. Here, we summarize the roles and responsibilities of the SDC and its current status and future plans. The Resolve instrument poses particular challenges due to its unprecedented combination of high spectral resolution and throughput, broad spectral coverage, and relatively small field-of-view and large pixel-size. We highlight those challenges and how they are being met.

XRISM↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

Multistage robust optimization for the day-ahead scheduling of hybrid thermal-hydro-wind-solar systems

The integration of large-scale uncertain and uncontrollable wind and solar power generation has brought new challenges to the operations of modern power systems. In a power system with abundant water resources, hydroelectric generation with high operational flexibility is a powerful tool to promote a higher penetration of wind and solar power generation. In this paper, we study the day-ahead scheduling of a thermal-hydro-wind-solar power system. The uncertainties of renewable energy generation, including uncertain natural water inflow and wind/solar power output, are taken into consideration. We explore how the operational flexibility of hydroelectric generation and the coordination of thermal-hydro power can be utilized to hedge against uncertain wind/solar power under a multistage robust optimization (MRO) framework. To address the computational issue, mixed decision rules are employed to reformulate the original MRO model with a multi-level structure into a bi-level one. Column-and-constraint generation (C &CG) algorithm is extended into the MRO case to solve the bi-level model. The proposed optimization approach is tested in three real-world cases. Furthermore, the computational results demonstrate the capability of hydroelectric generation to promote the accommodation of uncertain wind and solar power.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Specific recommendations for accurate and direct use of PET-CT in PET guided radiotherapy for head and neck sites

Purpose: To provide specific experience-based guidance and recommendations for centers wishing to develop, validate, and implement an accurate and efficient process for directly using positron emission tomography-computed tomography (PET-CT) for the radiotherapy planning of head and neck cancer patients. Methods: A PET-CT system was modified with hard-top couch, external lasers and radiotherapy immobilization and indexing devices and was subject to a commissioning and quality assurance program. PET-CT imaging protocols were developed specifically for radiotherapy planning and the image quality and pathway tested using phantoms and five patients recruited into an in-house study. Security and accuracy of data transfer was tested throughout the whole data pathway. The patient pathway was fully established and tested ready for implementation in a PET-guided dose-escalation trial for head and neck cancer patients. Results: Couch deflection was greater than for departmental CT simulator machines. An area of high attenuation in the couch generated image artifacts and adjustments were made accordingly. Using newly developed protocols CT image quality was suitable to maintain delineation and treatment accuracy. Upon transfer of data to the treatment planning system a half pixel offset between PET and CT was observed and corrected. By taking this into account, PET to CT alignment accuracy was maintained below 1 mm in all systems in the data pathway. Transfer of structures delineated in the PET fusion software to the radiotherapy treatment planning system was validated. Conclusions: A method to perform direct PET-guided radiotherapy planning was successfully validated and specific recommendations were developed to assist other centers. Of major concern is ensuring that the quality of PET and CT data is appropriate for radiotherapy treatment planning and on-treatment verification. Couch movements can be compromised, bore-size can be a limitation for certain immobilization techniques, laser positioning may affect setup accuracy and couch deflection may be greater than scanners dedicated to radiotherapy. The full set of departmental commissioning and routine quality assurance tests applied to radiotherapy CT simulators must be carried out on the PET-CT scanner. CT image quality must be optimized for radiotherapy planning whilst understanding that the appearance will differ between scanners and may affect delineation. PET-CT quality assurance schedules will need to be added to and modified to incorporate radiotherapy quality assurance. Methods of working for radiotherapy and PET staff will change to take into account considerations of both parties. PET to CT alignment must be subject to quality control on a loaded and unloaded couch preferably using a suitable emission phantom, and tested throughout the whole data pathway. Data integrity must be tested throughout the whole pathway and a system included to verify that delineated structures are transferred correctly. Excellent multidisciplinary team communication and working is vital, and key staff members on both sides should be specifically dedicated to the project. Patient pathway should be clearly devised to optimize patient care and the resources of all departments. Recruitment of a cohort of patients into a methodology study is valuable to test the quality assurance methods and pathway.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated payload and mission planning, phase 3. Volume 4: Optimum utilization of Spacelab racks and pallets

The methodology to optimize the utilization of Spacelab racks and pallets and to apply this methodology to the early STS Spacelab missions was developed. A review was made of Spacelab Program requirements and flow plans, generic flow plans for racks and pallets were examined, and the principal optimization criteria and methodology were established. Interactions between schedule, inventory, and key optimization factors; schedule and cost sensitivity to optional approaches; and the development of tradeoff methodology were addressed. This methodology was then applied to early spacelab missions (1980-1982). Rack and pallet requirements and duty cycles were defined, a utilization assessment was made, and several trade studies performed involving varying degrees of Level IV integration, inventory level, and shared versus dedicated Spacelab racks and pallets.

Logston, R. G.↗

Runway Operations Planning: A Two-Stage Heuristic Algorithm

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

Anagnostakis, Ioannis↗

SU-F-19A-08: Optimal Time Release Schedule of In-Situ Drug Release During Permanent Prostate Brachytherapy

Purpose: Permanent prostate brachytherapy spacers can be used to deliver sustained doses of radiosentitizing drug directly to the target, in order to enhance the radiation effect. Implantable nanoplatforms for chemo-radiation therapy (INCeRTs) have a maximum drug capacity and can be engineered to control the drug release schedule. The optimal schedule for sensitization during continuous low dose rate irradiation is unknown. This work studies the optimal release schedule of drug for both traditional sensitizers, and those that work by suppressing DNA repair processes. Methods: Six brachytherapy treatment plans were used to model the anatomy, implant geometry and calculate the spatial distribution of radiation dose and drug concentrations for a range of drug diffusion parameters. Three state partial differential equations (cells healthy, damaged or dead) modeled the effect of continuous radiation (radiosensitivities α,β) and cellular repair (time tr) on a cell population. Radiosensitization was modeled as concentration dependent change in α,β or tr which with variable duration under the constraint of fixed total drug release. Average cell kill was used to measure effectiveness. Sensitization by means of both enhanced damage and reduced repair were studied. Results: Optimal release duration is dependent on the concentration of radiosensitizer compared to the saturation concentration (csat) above which additional sensitization does not occur. Long duration drug release when enhancing α or β maximizes cell death when drug concentrations are generally over csat. Short term release is optimal for concentrations below saturation. Sensitization by suppressing repair has a similar though less distinct trend that is more affected by the radiation dose distribution. Conclusion: Models of sustained local radiosensitization show potential to increase the effectiveness of radiation in permanent prostate brachytherapy. INCeRTs with high drug capacity produce the greatest benefit with drug release over weeks. If in-vivo drug concentrations are not able to approach saturation concentration, durations of days is optimal. DOD 1R21CA16977501; A. David Mazzone Awards Program 2012PD164.

60 APPLIED LIFE SCIENCES↗

Optimizing observing sequence design for periodic and non-periodic phenomena : a Bayesian approach

In this paper we report on our progress on addressing these issues. We have developed an approximate expression for the uniformity of phase coverage that can be used when scheduling to assess candidate sample times. We describe the results obtained using this estimator, and compare them with detailed simulations. We describe our progress and plans for integrating optimizing criteria for both periodic and non-periodic observations into a single observation sequence.

Bayesian↗

Prospective study evaluating the use of IV contrast on IMRT treatment planning for lung cancer

Purpose: To investigate the impact of exclusively using intravenous (IV) contrast x-ray computed tomography (CT) scans on lung cancer intensity-modulated radiation therapy (IMRT) treatment planning. Methods: Eight patients with lung cancer (one small cell, seven nonsmall cell) scheduled to receive IMRT consented to acquisition of simulation CT scans with and without IV contrast. Clinical treatment plans optimized on the noncontrast scans were recomputed on contrast scans and dose coverage was compared, along with the γ passing rates. Results: IV contrast enhanced scans provided better target and critical structure conspicuity than the noncontrast scans. Using noncontrast scan as a reference, the median absolute/relative differences in mean, maximum, and minimum doses to the planning target volume (PTV) were −4.5 cGy/−0.09%, 41.1 cGy/0.62%, and −19.7 cGy/−0.50%, respectively. Regarding organs-at-risk (OARs), the median absolute/relative differences of maximum dose to heart was −13.3 cGy/−0.32%, to esophagus was −63.4 cGy/−0.89%, and to spinal cord was −16.3 cGy/−0.46%. The median heart region of interest CT Hounsfield Unit (HU) number difference between noncontrast and contrast scans was 136.4 HU (range, 94.2–161.8 HU). Subjectively, the regions with absolute dose differences greater than 3% of the prescription dose were small and typically located at the patient periphery and/or at the beam edges. The median γ passing rate was 0.9981 (range, 0.9654–0.9999) using 3% absolute dose difference/3 mm distance-to-agreement criteria. Overall, all evaluated cases were found to be clinically equivalent. Conclusions: PTV and OARs dose differences between noncontrast and contrast scans appear to be minimal for lung cancer patients undergoing IMRT. Using IV contrast scans as the primary simulation dataset could increase treatment planning efficiency and accuracy by avoiding unnecessary scans, manually region overriding, and planning errors caused by nonperfect image registrations.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Facility Utilization and Risk Analysis for Remediation of Legacy Transuranic Waste at the Savannah River Site - 13572

Savannah River Nuclear Solutions (SRNS) completed the Accelerated TRU Project for remediating legacy waste at the Savannah River Site with significant cost and schedule efficiencies due to early identification of resources and utilization of risk matrices. Initial project planning included identification of existing facilities that could be modified to meet the technical requirements needed for repackaging and remediating the waste. The project schedule was then optimized by utilization of risk matrices that identified alternate strategies and parallel processing paths which drove the overall success of the project. Early completion of the Accelerated TRU Project allowed SRNS to pursue stretch goals associated with remediating very difficult TRU waste such as concrete casks from the hot cells in the Savannah River National Laboratory. Project planning for stretch goals also utilized existing facilities and the risk matrices. The Accelerated TRU project and stretch goals were funded under the American Recovery and Reinvestment Act (ARRA). (authors)

54 ENVIRONMENTAL SCIENCES↗

Runway Scheduling for Charlotte Douglas International Airport

This paper describes the runway scheduler that was used in the 2014 SARDA human-in-the-loop simulations for CLT. The algorithm considers multiple runways and computes optimal runway times for departures and arrivals. In this paper, we plan to run additional simulation on the standalone MRS algorithm and compare the performance of the algorithm against a FCFS heuristic where aircraft avail of runway slots based on a priority given by their positions in the FCFS sequence. Several traffic scenarios corresponding to current day traffic level and demand profile will be generated. We also plan to examine the effect of increase in traffic level (1.2x and 1.5x) and observe trends in algorithm performance.

runway scheduling↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

An expert system for ground support of the Hubble space telescope

The Hubble Space Telescope is an orbiting optical observatory due to be launched by the Space Shuttle in late 1987. It is a complex, multi-instrument observatory whose resources will be available to the world-wide astronomical community. The 'Transformation' system is a hybrid system which utilizes a rule-based expert system to convert scientific proposals into pre-optimized linked hierarchies of spacecraft activities. These activities are generated in a format that can be directly scheduled by the planning and scheduling component of the Space Telescope ground support system. The Transformation system will be described in detail in this paper, with particular attention given to the rule base.

Rosenthal, Don↗

Development of technology needs for the SEI TNIM network

A comparison of the salient features of the SEI with previous space exploration programs shows the need for a telecommunications, navigation and information management (TNIM) system level reoptimization. An approach is developed that takes the various candidate mission plans and decomposes them into architectural building blocks, many of which are common to several of the plans. Once identified, each of these blocks can then be parametrically examined with respect to performance benefit, cost, technology, and schedule risk tradeoffs. As the Space Exploration Initiative plan is established, these TNIM building blocks may be fused into an optimized system architecture.

Wachs, M. R.↗

Neoadjuvant Sandwich Treatment With Oxaliplatin and Capecitabine Administered Prior to, Concurrently With, and Following Radiation Therapy in Locally Advanced Rectal Cancer: A Prospective Phase 2 Trial

Purpose: Systemic failure remains the major challenge in management of locally advanced rectal cancer (LARC). To optimize the timing of neoadjuvant treatment and enhance systemic control, we initiated a phase 2 trial to evaluate a new strategy of neoadjuvant sandwich treatment, integrating induction chemotherapy, concurrent chemoradiation therapy, and consolidation chemotherapy. Here, we present preliminary results of this trial, reporting the tumor response, toxicities, and surgical complications. Methods and Materials: Fifty-one patients with LARC were enrolled, among which were two patients who were ineligible because of distant metastases before treatment. Patients were treated first with one cycle of induction chemotherapy consisting of oxaliplatin, 130 mg/m² on day 1, with capecitabine, 1000 mg/m² twice daily for 14 days every 3 weeks (the XELOX regimen), followed by chemoradiation therapy, 50 Gy over 5 weeks, with the modified XELOX regimen (oxaliplatin 100 mg/m²), and then with another cycle of consolidation chemotherapy with the XELOX regimen. Surgery was performed 6 to 8 weeks after completion of radiation therapy. Tumor responses, toxicities, and surgical complications were recorded. Results: All but one patent completed the planned schedule of neoadjuvant sandwich treatment. Neither life-threatening blood count decrease nor febrile neutropenia were observed. Forty-five patents underwent optimal surgery with total mesorectal excision (TME). Four patients refused surgery because of clinically complete response. There was no perioperative mortality in this cohort. Five patients (11.1%) developed postoperative complications. Among the 45 patients who underwent TME, pathologic complete response (pCR), pCR or major regression, and at least moderate regression were achieved in 19 (42.2%), 37 (82.2%), and 44 patients (97.8%), respectively. Conclusions: Preliminary results suggest that the strategy of neoadjuvant sandwich treatment using XELOX regimen as induction, concomitant, and consolidation chemotherapy to the conventional radiation is well tolerated. The strategy is highly effective in terms of pCR and major regression, which warrants further investigation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗