Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Microreactor Transportation Emergency Planning Challenges

This report discusses microreactor transportation emergency planning and response challenges. The emphasis of the report is on transporting a microreactor containing irradiated fuel by highway and rail. The report first discusses microreactors in general, including microreactor fuel types and the use of hazardous material in microreactor designs. The report presents a microreactor concept of operations for transport highway, rail, and vessel and presents several transportation regulatory challenges associated with microreactors. Updates contained in this report include the transportation implications of revising the uranium lung absorption category for tri-structural isotropic (TRISO) particle fuel, discussion of exercises and drills including the 2024 Naval Spent Nuclear Fuel Transportation Accident Demonstration with the Shoshone-Bannock Tribes and the State of Idaho, and Tribal and State perspectives on microreactor transportation emergency response planning. Additional microreactor transportation external engagement activities conducted during FY2024 are also discussed. The report discusses the implications of the recent East Palestine, Ohio, rail accident for transportation emergency response planning. Included in this update is a discussion of H.R. 8996, the Railroad Safety Enhancement Act of 2024.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Grid Expansion Optimal Planning Tools (GridEO): Manual for Users and Developers

This report describes Grid Expansion Optimal Planning Tools (GridEO). GridEO is a Python package for electric power grid capacity expansion modeling. With GridEO, the user can build and solve instances of the Capacity Expansion Planning (CEP) problem to determine an optimal plan of investment in capacity of various types of power grid equipment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recommendations for a Fundamental Nuclear Material Control (FNMC) Plan for TRISO Fuel Fabrication Facilities Under NRC Regulations

A fundamental nuclear material control (FNMC) plan, which is required for all fuel fabrication facilities that are authorized to possess more than 1 effective kg of special nuclear material, describes how material control and accounting (MC&A) requirements will be met to comply with US Nuclear Regulatory Commission (NRC) regulations. Tristructural isotropic (TRISO) fuel fabrication facilities are likely to have issues in meeting MC&A requirements because of the new processes and fuel types their work involves. This report provides recommendations for an FNMC plan specifically for a TRISO fuel fabrication facility under NRC regulations and includes a draft outline of an FNMC plan. This report was produced for the Materials Protection, Accounting, and Control Technologies (MPACT) program under the Nuclear Fuel Cycle Technologies programs within the US Department of Energy’s Office of Nuclear Energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

McGrath Community Energy Planning

The City of McGrath, a remote Alaskan community reliant on diesel fuel, developed a Community Energy Plan through the Energy Technologies Innovation Partnership Project (ETIPP) to address high energy costs, infrastructure vulnerabilities, and long-term sustainability. Guided by community-led priorities and technical assistance from partners including NREL, REAP, and ANTHC, the plan identifies eight focus areas: distribution system upgrades, solar and battery integration, river energy potential, emergency backup power, housing efficiency, water system losses, independent power producer models, and targeted funding strategies. The plan combines local knowledge with technical analysis to chart a path toward a more resilient, affordable, and sustainable energy future for McGrath.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

Energy burden aware and thermal resilience informed thermal energy storage system planning for disadvantaged communities

Disadvantaged communities often face a disproportionate energy burden because they need to allocate a higher percentage of their income to energy costs. More importantly, climate change-induced extreme weather events, such as heat waves and severe cold snaps, exacerbate these communities’ energy burdens. As a result, low- and medium-income communities are more likely to experience energy supply disruptions, increased health risks, and elevated energy bills because of inadequate thermal insulation and airtightness in their houses. Thermal energy storage (TES) systems, such as large-scale (community-level) geothermal energy storage and small-scale (building-level) phase change material (PCM)–based storage, have a great potential to improve building energy efficiency and to enhance thermal comfort, load shifting, and integration with renewable energy. The objective of this study is to optimally allocate building level PCM-based TES systems at the community level by considering energy equity and extreme weather effects. To this end, we developed an energy burden and thermal resilience–informed TES system planning framework, which includes three modules: (1) a community-level energy burden and thermal resilience assessment module, (2) building-level a TES system integration and assessment module, and (3) a community-level optimal planning module. Case studies were conducted on four disadvantaged communities in Montgomery and Shelby Counties in Tennessee with energy burdens >10% and with high percentages of people of color. The results indicate that this comprehensive planning framework can assist disadvantaged communities in reducing their energy burden and in bolstering their resilience against the adverse effects of climate change.

Shen, Zhenglai↗

Transforming Regional Transmission Planning: FERC Order 1920 Explained [Slides]

This presentation presents the key topics from FERC Order 1920: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation. It breaks down and summarizes the main reforms from the regulation including comments from diverse perspectives on how the new rules may be implemented. This presentation can serve as a resource for diverse stakeholders including policymakers, utilities, industry, and researchers who seek to understand how the new ruling may impact regional transmission planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Action Plan for Rail Energy and Emissions Innovation

The Action Plan for Rail Energy and Emissions Innovation proposes actions to reduce and nearly eliminate emissions in the U.S. rail sector, in line with the U.S. economy-wide goal of net-zero greenhouse gas (GHG) emissions by 2050. It also proposes actions to leverage the rail system to reduce emissions from other modes. The national goal of achieving a zero-emission freight system by 2050 draws our attention to the fact that freight transport cannot be addressed simply mode by mode, but it should instead be treated as an interdependent system. This is especially true when pursuing decarbonization. This action plan presents how both rail transport and decarbonization intersect with our national transportation decarbonization blueprint, the decarbonization of the freight system, and national transmission goals. The intended audience of this report is the stakeholders who will advance rail decarbonization in a just and economical way by propelling the suite of actions listed here. This includes government at all levels, rail companies, locomotive manufacturers, labor unions, Amtrak, and more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Form Follows Function (F3): A framework for community-based energy resilience planning in the Midwest

This is the final technical report for the Form Follows Function (F3) grant project led by the City of Duluth, MN. F3 was an innovative two-year initiative that created a replicable, human-centered energy resilience planning process specifically designed for smaller, cold-climate communities in the Midwest. F3 demonstrated both systems-level government planning and community-based research techniques to inform renewable investments and community preparedness strategies.

14 SOLAR ENERGY↗

Kotzebue Strategic Energy Plan

The Kotzebue Strategic Energy Plan outlines a community-driven roadmap to reduce reliance on imported diesel, lower energy costs, and build a resilient energy future for Kotzebue, Alaska. Developed in 2024-2025 through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project (ETIPP), the plan was led by the Native Village of Kotzebue in collaboration with Kotzebue Electric Association, the City of Kotzebue, the Northwest Arctic Borough, NANA Regional Corporation, and regional partners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Strategic Planning for Energy-Resilient Communities

Distributed energy resources (DERs) offer flexibility and community benefits in both blue- and black-sky conditions. Outside of a power disruption, they can provide significant cost savings and reduce grid stress during times of high demand. During a disruption to the central grid, these technologies can meet critical energy needs through the use of battery storage. However, communities must consider many planning and design dimensions and tradeoffs to integrate energy systems that meet financial and resilience goals. This presentation, given at the 2026 State Energy Conference of North Carolina, defines resilience in an energy context, discusses strategies and best practices for planning resilient energy systems and sites, including resilience hubs and microgrids, highlights NLR tools and capabilities for helping communities in this space, and features successful case studies in North Carolina related to energy resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Technology Proving Ground FY-2026 Program Plan (Rev.1)

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗