Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Research into display sharing techniques for distributed computing environments

The X-based Display Sharing solution for distributed computing environments is described. The Display Sharing prototype includes the base functionality for telecast and display copy requirements. Since the prototype implementation is modular and the system design provided flexibility for the Mission Control Center Upgrade (MCCU) operational consideration, the prototype implementation can be the baseline for a production Display Sharing implementation. To facilitate the process the following discussions are presented: Theory of operation; System of architecture; Using the prototype; Software description; Research tools; Prototype evaluation; and Outstanding issues. The prototype is based on the concept of a dedicated central host performing the majority of the Display Sharing processing, allowing minimal impact on each individual workstation. Each workstation participating in Display Sharing hosts programs to facilitate the user's access to Display Sharing as host machine.

Hugg, Steven B.↗

Practical considerations in designing the engine cycle

When it is required to define the cycle parameters and calculate the performance of a real engine, there are numerous practical constraints that need to be taken into account. These fall into two main categories: the limitations of available component technologies, and the operational considerations that are dependent on aircraft application. The lecture discusses the main technology limiters and indicates how they are incorporated into the cycle definition process. Operational factors include the extent of the intended flight envelope and range of critical flight conditions for which performance must be assured, and the balance to be struck between minimising fuel consumption, maximising installed power and constraining costs of ownership. Taking these technology and operational influences into account, the basic cycle characteristics and approach to cycle choice are examined for three main classes of aircraft: subsonic transports, military combat aircraft and helicopters.

M G Philpot↗

In-time System-wide Safety Assurance (ISSA) Concept of Operations and Design Considerations for Urban Air Mobility (UAM)

Emerging operations involving Advanced Air Mobility (AAM), such as Urban Air Mobility (UAM), pose a challenge to safety assurance and to accessibility within the National Airspace System (NAS).In particular, the public has a low tolerance for risk in aviation and the current NAS tends to be labor-intensive with limited ability to scale up for UAM. In response to this landscape, NASA is collaborating with industry to define a Concept of Operations (ConOps) for In-time System-Wide Safety Assurance (ISSA) for scalable UAM involving a service-oriented architecture. This architecture focuses safety investments for technological solutions that can overcome safety related barriers for emerging operations. By working with industry, consensus can be reached on desirable system traits that are based on integration and fusion of data and leverage increasingly autonomous and automated systems. These complex systems can identify anomalies, precursors, and trends that together enable more proactive management of operational risks. AAM and UAM elevate the need for risk management in relation to increasing density and heterogeneity of vehicles and operations. Whereas safety in today’s NAS is built on a history of programs and technologies that react to incidents and accidents, AAM presents an opportunity to leverage that experience and its implications and proactively integrate safety into the earliest designs of vehicles and systems. In a perfect world AAM and UAM would not be inherently dangerous but until then ensuring the highest quality of safety requirements is the bridge to mitigating risks.

In-Time System-Wide Safety Assurance↗

Reference Station Design for Heavy-Duty Vehicles

Five alternative design configurations for a heavy-duty hydrogen refueling truck stop are detailed in this work. Each of the station concepts provides fast, 5-minute, 50 kg fills of up to 4 vehicles simultaneously, with a station capacity of 4200 kg/day. Two on-site production stations using PEM electrolysis are considered: one with off-peak production of the daily capacity; and one with on-demand production of hydrogen during vehicle refueling. Three delivered liquid hydrogen station concepts are considered: one with the same, high-pressure cascade storage system for dispensing as the electrolysis supplied stations, with low-pressure vaporization of the liquid hydrogen and pressurization via a compressor; and two with on-demand pressurization: one by low-pressure vaporization and compressors; and one with a cryogenic pump and high-pressure vaporization. Design, economic, and operational considerations for each of the components needed in these station concepts is provided. Of all the station concepts, the delivered liquid station with a low-pressure vaporizer and a cascade dispensing system has the lowest capital costs and equipment footprint, but the second highest operating costs primarily due to high costs for liquid hydrogen delivery. The lowest operating cost station is that with on-site production via PEM electrolysis at off-peak hours with a cascade delivery system. The low-pressure buffer storage system and electrolyzers have a large footprint and considerable capital costs, but could result in a low total cost of ownership, depending on the design timeline. The liquid hydrogen station with a cryo-pump has moderate capital costs, the lowest operating costs of the three delivered hydrogen stations, and the same small equipment footprint as the delivered liquid, cascade dispensing system. As cryogenic pumping technology improves and the capital costs for these pumps decreases, this station concept will become even more favorable. Three-dimensional renderings of the five station concepts provide station designers with a starting point for the development of heavy-duty refueling stations.

08 HYDROGEN↗

Quiet aircraft design and operational characteristics

The application of aircraft noise technology to the design and operation of aircraft is discussed. Areas of discussion include the setting of target airplane noise levels, operational considerations and their effect on noise, and the sequencing and timing of the design and development process. Primary emphasis is placed on commercial transport aircraft of the type operated by major airlines. Additionally, noise control engineering of other types of aircraft is briefly discussed.

Hodge, Charles G.↗

On-Orbit Propulsion System Performance of ISS Visiting Vehicles

The International Space Station (ISS) represents the culmination of over two decades of unprecedented global human endeavors to conceive, design, build and operate a research laboratory in space. Uninterrupted human presence in space since the inception of the ISS has been made possible by an international fleet of space vehicles facilitating crew rotation, delivery of science experiments and replenishment of propellants and supplies. On-orbit propulsion systems on both ISS and Visiting Vehicles are essential to the continuous operation of the ISS. This paper compares the ISS visiting vehicle propulsion systems by providing an overview of key design drivers, operational considerations and performance characteristics. Despite their differences in design, functionality, and purpose, all visiting vehicles must adhere to a common set of interface requirements along with safety and operational requirements. This paper addresses a wide variety of methods for satisfying these requirements and mitigating credible hazards anticipated during the on-orbit life of propulsion systems, as well as the seamless integration necessary for the continued operation of the ISS.

Martin, Mary Regina M.↗

Study of the application of advanced technologies to laminar flow control systems for subsonic transports. Volume 1: Summary

A study was conducted to evaluate the technical and economic feasibility of applying laminar flow control to the wings and empennage of long-range subsonic transport aircraft compatible with initial operation in 1985. For a design mission range of 10,186 km (5500 n mi), advanced technology laminar-flow-control (LFC) and turbulent-flow (TF) aircraft were developed for both 200 and 400-passenger payloads, and compared on the basis of production costs, direct operating costs, and fuel efficiency. Parametric analyses were conducted to establish the optimum geometry for LFC and TF aircraft, advanced LFC system concepts and arrangements were evaluated, and configuration variations maximizing the effectiveness of LFC were developed. For the final LFC aircraft, analyses were conducted to define maintenance costs and procedures, manufacturing costs and procedures, and operational considerations peculiar to LFC aircraft. Compared to the corresponding advanced technology TF transports, the 200- and 400-passenger LFC aircraft realized reductions in fuel consumption up to 28.2%, reductions in direct operating costs up to 8.4%, and improvements in fuel efficiency, in ssm/lb of fuel, up to 39.4%. Compared to current commercial transports at the design range, the LFC study aircraft demonstrate improvements in fuel efficiency up to 131%. Research and technology requirements requisite to the development of LFC transport aircraft were identified.

Sturgeon, R. F.↗

Terminal Area Considerations for UAS Detect and Avoid

Unmanned Aircraft Systems need to be able to comply with manned aviation ‘see and avoid’ separation requirements. A Detect and Avoid (DAA) System includes sensors, a tracker, and alerting and guidance algorithms that assist a remote pilot in maintaining separation from airborne traffic. To date, DAA system requirements development has focused on operations transiting to and from Class A or special use airspace. Current efforts are defining DAA system requirements for operations in and around terminal airspace. As a contribution to the current efforts, this paper highlights results from a Human in the Loop (HiTL) experiment comparing methods of changing from the transit-specific alerting and guidance criteria to proposed terminal-specific alerting and guidance criteria. It discusses operational considerations that are beyond the HiTL.

Unmanned Aircraft Systems↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Mission Concepts and Operations for Asteroid Mitigation Involving Multiple Gravity Tractors

The gravity tractor concept is a proposed method to deflect an imminent asteroid impact through gravitational tugging over a time scale of years. In this study, we present mission scenarios and operational considerations for asteroid mitigation efforts involving multiple gravity tractors. We quantify the deflection performance improvement provided by a multiple gravity tractor campaign and assess its sensitivity to staggered launches. We next explore several proximity operation strategies to accommodate multiple gravity tractors at a single asteroid including formation-flying and mechanically-docked configurations. Finally, we utilize 99942 Apophis as an illustrative example to assess the performance of a multiple gravity tractor campaign.

Foster, Cyrus↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

Development of the Architectural Simulation Model for Future Launch Systems and its Application to an Existing Launch Fleet

A significant portion of lifecycle costs for launch vehicles are generated during the operations phase. Research indicates that operations costs can account for a large percentage of the total life-cycle costs of reusable space transportation systems. These costs are largely determined by decisions made early during conceptual design. Therefore, operational considerations are an important part of vehicle design and concept analysis process that needs to be modeled and studied early in the design phase. However, this is a difficult and challenging task due to uncertainties of operations definitions, the dynamic and combinatorial nature of the processes, and lack of analytical models and the scarcity of historical data during the conceptual design phase. Ultimately, NASA would like to know the best mix of launch vehicle concepts that would meet the missions launch dates at the minimum cost. To answer this question, we first need to develop a model to estimate the total cost, including the operational cost, to accomplish this set of missions. In this project, we have developed and implemented a discrete-event simulation model using ARENA (a simulation modeling environment) to determine this cost assessment. Discrete-event simulation is widely used in modeling complex systems, including transportation systems, due to its flexibility, and ability to capture the dynamics of the system. The simulation model accepts manifest inputs including the set of missions that need to be accomplished over a period of time, the clients (e.g., NASA or DoD) who wish to transport the payload to space, the payload weights, and their destinations (e.g., International Space Station, LEO, or GEO). A user of the simulation model can define an architecture of reusable or expendable launch vehicles to achieve these missions. Launch vehicles may belong to different families where each family may have it own set of resources, processing times, and cost factors. The goal is to capture the required resource levels of the major launch elements and their required facilities. The model s output can show whether or not a certain architecture of vehicles can meet the launch dates, and if not, how much the delay cost would be. It will also produce aggregate figures of missions cost based on element procurement cost, processing cost, cargo integration cost, delay cost, and mission support cost. One of the most useful features of this model is that it is stochastic where it accepts statistical distributions to represent the processing times mimicking the stochastic nature of real systems.

Rabadi, Ghaith↗

Hitchhiker mission operations: Past, present, and future

What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.

Anderson, Kathryn↗

Microgrid Black Start Challenges: The Role of Grid-Forming Inverters

Grid-forming (GFM) inverters are becoming increasingly important for future power systems, particularly in establishing and restarting microgrids after blackouts. The use of GFM inverters enables microgrids to operate independently of utility power and provide key advantages over synchronous generators in black start scenarios, including rapid startup and stable voltage and frequency support for critical loads. However, inverter-driven black start introduces unique challenges and operational considerations. This article examines key challenges and solutions, emphasizing inverter design, control strategies, and microgrid system requirements. Drawing on analysis, simulation, and experimental results, this article highlights the central role of GFM inverters in ensuring reliable and resilient microgrid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing durability of polymer electrolyte membrane using cation size selective agents

Radical species generated during proton exchange membrane fuel cell operation considerably limit the achievable durability, particularly for heavy-duty vehicle applications. A promising solution to the problem is the incorporation of radical scavenger additives such as cerium which mitigates chemical attacks on the membrane. However, these additives migrate during fuel cell operation causing a loss in durability and performance due to detrimental interaction with various components of the fuel cell. Here, we study cation size selective agents as a means to immobilize cerium within perfluorosulfonic acid (PFSA) membranes. We synthesized an organometallic complex of cerium with 15-Crown-5 and investigated the effectiveness of this complex to immobilize cerium. Over 300% increase in cerium retention and an 80% increase in chemical durability were observed owing to the stabilization effect of crown ethers on cerium. Migration under a potential gradient can be eliminated while the complex also contributes to the enhancement in cerium radical scavenging activity. In conclusion, current challenges with the proposed solution are highlighted and future work is discussed.

25 ENERGY STORAGE↗

Spin scan imaging at Jupiter

The general feasibility of spin scan imaging from spinning platforms in outer planet orbiters was investigated. The study was limited to consideration of a typical orbiter mission to Jupiter with an orbit designed to provide repetitive close approaches to the Galilean satellites. Discussed are: (1) data requirements for imaging experiments at Jupiter and its satellites; (2) spin scan camera and baseline camera selection; and (3) operational considerations bearing on imager performance. A physical camera model including relationships identifying the supporting requirements was developed and used to determine the characteristics of the baseline camera.

Sinclair, K. F.↗

Extraction of stability and control derivatives from orbiter flight data

The Space Shuttle Orbiter has provided unique and important information on aircraft flight dynamics. This information has provided the opportunity to assess the flight-derived stability and control derivatives for maneuvering flight in the hypersonic regime. In the case of the Space Shuttle Orbiter, these derivatives are required to determine if certain configuration placards (limitations on the flight envelope) can be modified. These placards were determined on the basis of preflight predictions and the associated uncertainties. As flight-determined derivatives are obtained, the placards are reassessed, and some of them are removed or modified. Extraction of the stability and control derivatives was justified by operational considerations and not by research considerations. Using flight results to update the predicted database of the orbiter is one of the most completely documented processes for a flight vehicle. This process followed from the requirement for analysis of flight data for control system updates and for expansion of the operational flight envelope. These results show significant changes in many important stability and control derivatives from the preflight database. This paper presents some of the stability and control derivative results obtained from Space Shuttle flights. Some of the limitations of this information are also examined.

Iliff, Kenneth W.↗