Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Ground System Milestones: 20 Years of Earth Observing Satellite Mission Operations

Aqua, Aura, and Terra are Earth observing satellites that serve in the Earth Observing System (EOS). Terra, the flagship mission of the EOS, was launched in 1998. Aqua was launched in 2002 and Aura was launched in 2004. Each spacecraft was designed for a 6 year lifespan. Currently, each spacecraft meets all mission and science requirements. As technology advances, the onboard hardware and software remain the same, however, our ground system progresses. In the past twenty years, many changes have taken place. Our goal is to describe the life of the ground system from launch, to present day, and touch on our future plans. The focus of our presentation will be how EOS has and continues to modernize our ground system for the future. We would like to share our experiences and give insight into the operational challenges of a 20 year old ground system. Our hope is for future mission operators and those maintaining potential age defying satellites to use our past experiences and lessons learned for future operational concepts.

Barrett, Grant↗

Mars 2020 Surface Mission Performance Modeling: Part 3. Mission Performance Modeling Approach and Results

We have developed a comprehensive model of the Mars 2020 rover surface mission used to identify and evaluate mission productivity and operability challenges and opportunities. The surface mission performance model combines many aspects of rover design, operations approach, system behaviors, and mission constraints into an integrated model of surface mission performance. The surface mission model applies monte-carlo methodologies in order to investigate the key sources of mission performance variability and their effects with respect to overall mission performance. Our modeling efforts aims to investigate and inform engineering design and development efforts, as well as the landing site selection process led by the Mars science community. We believe that an integrated mission performance model such as this is important to aligning engineering and science efforts across the project.

Ono, Masahiro↗

The Cassini-Huygens Sequence Development Process

Each phase of the sequence development process had to overcome many operational challenges due to the immense complexity of the spacecraft, tour design, pointing capabilities, flight rules and software development. This paper will address the specific challenges related to each of those complexities and the methods used to overcome them during operation.

science planning↗

End-user Assessment of the NASA SPoRT GLM Stoplight Product

National Weather Service (NWS) offices monitor and forecast the threat for lightning within their County Warning Areas for various impact-based decision support services (IDSS). These forecasts are provided routinely for aviation operations, but irregularly for large-scale, outdoor events, which typically have varying safety requirements with regards to lightning. Lightning monitoring and forecasting can require synthesizing a plethora of data, so products that make this process more efficient and effective are sought by the operational community. The NASA Short-term Prediction Research and Transition (SPoRT) Center has begun to develop several products to address these operational challenges during the lifecycle of lightning activity, and conduct evaluations in concentrated (Research-to-Operations/Operations-to-Research) efforts. The product evaluated for this study is the Geostationary Lightning Mapper (GLM) Stoplight product, which addresses lightning safety specifically with regards to lightning recency and cessation. The GLM Stoplight product displays the spatial extent of lightning and uses color-coded pixels to show the recency of lightning in 10-minute increments. This presentation highlights results from an assessment of the GLM Stoplight product by select NWS offices, as well as emergency managers, that took place over a 5-week period from May 1st to June 2nd. Feedback was collected on the GLM Stoplight product and on a new and interactive lightning viewer, which allowed participants to tailor visualization of the product based on their location and desired application. Results will help NASA SPoRT gain a better understanding of how forecasters and emergency managers use lightning data for safety applications. In addition, the assessment will inform research on any necessary modifications to this and future lightning products to assist end users.

Kelley Murphy↗

Natural gas maximal load delivery for multi-contingency analysis

An increasing dependence on natural gas has amplified existing vulnerabilities to the power grid, including disruptions to gas transmission networks from natural and man-made disasters. To address the operational challenges arising from these disruptions, we, in this study, consider the problem of estimating the steady-state operating capacity of a damaged gas pipeline network while ensuring the maximal delivery of load. Specifically, we formulate the mixed-integer nonconvex maximal load delivery (MLD) problem, which proves difficult to solve on large-scale networks. To address this challenge, we present a relaxation of the MLD problem and use it to determine bounds on the transport capacity of a gas pipeline system. A rigorous computational evaluation over network models ranging in size from 11 to 4,197 junctions shows that the relaxation-based method is suitable for analyzing the impacts of multi-contingency network disruptions, often converging to the optimal solution of the relaxation in less than ten seconds.

03 NATURAL GAS↗

AI-Guided Reasoning-Based Operator Support System for the Nuclear Power Plant Management

The Decision-making process in the Nuclear Power Plant (NPP) control room faces some challenges: operator incomplete knowledge, insufficient time for responding to the highly dynamic events, and a large number of indicators to monitor. Because of the complexity of the NPP system, it is hard to pre-plan all the failures/mitigative actions. An intelligent operator support system is vital to mitigate these shortcomings. In this paper, an AI declarative approach (Answer Set Programming (ASP)) is employed to represent our knowledge of the nuclear power plant in the form of logic rules. This represented knowledge is structured to form a reasoning-based operator support system. When an incident occurs, this ASP-based reasoning support system is demonstrated to be capable of fault identification (diagnosis), informing the operator of different scenarios and consequences, and generating the control options (decision making).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design and Manufacturing of High Performance, Reduced Charge Heat Exchangers

Air-to-fluid heat exchangers (HXs) play a critical role as the main heat transfer component in Heating, Ventilation, Air-Conditioning, and Refrigeration (HVAC&R) systems. However, their airside thermal resistance significantly inhibits their overall performance. Furthermore, these HXs must be continually more compact to meet the latest refrigerant charge limits to reduce emissions. Recent literature suggests that traditional HX geometries (e.g., round or flat tubes with fins), have reached their limits, and more sophisticated shape- and topology-optimized designs are required to achieve the next jump in performance. This research sheds light on the next generation of air-to-refrigerant HXs and aims to address several practical issues to commercialization such as novelty challenges (improved performance for significant charge reduction; modeling expertise & time investment), manufacturing challenges (non-round tube manufacturing; tube-header integration; product qualification, e.g., burst pressure testing, extreme operational environment, etc.), and operational challenges (flow maldistribution, fouling & wetting, noise & vibration). For example, a >20% improvement on one (or more) HX-level performance metrics (e.g., envelope volume, airside pressure drop, face area, capacity, refrigerant charge, weight, cost, etc.) must be achieved before a HX design is considered for commercialization. We present a new, comprehensive and experimentally validated air-to-refrigerant HX optimization framework with simultaneous thermal-hydraulic performance and mechanical strength considerations for novel, non-round, shape- and topology-optimized tubes capable of optimizing single and two-phase HX designs for any refrigerant choice and performance requirement with significant engineering time savings compared to conventional design practices. The framework was exercised for a wide range of applications and refrigerants, resulting in HXs which achieved greater than 20% improved performance, 20% reductions in size, and 25% reductions in refrigerant charge. To enable non-round tube bundle use in next generation HVAC&R equipment, novel manufacturing techniques were investigated, including the development of conventional manufacturing methods for small diameter, non-round tubes and novel tube-header integration strategies. In total, ten HX prototypes were manufactured, nine using conventional methods directly attributed to this project and one using advanced additive manufacturing methods. The five-year manufacturing feasibility of the proposed HXs was found to have a good outlook. The non-round tube HX simulated performance was validated through comprehensive experimental testing, including nine in-house component-level tests, one independent component-level test at an industry partner laboratory, and in-house system-level tests of using a commercially-available, residential packaged A/C unit which was retrofitted with a non-round tube prototype HX. It was found that HX designs proposed by the new framework can successfully predict experimental thermal-hydraulic performance within ±10-20% the first time with no manual design changes, eliminating the need for time-consuming and expensive prototyping efforts. This work will accelerate design and time to market for next generation HXs while simultaneously facilitating industry transition to new refrigerants at lower charge.

42 ENGINEERING↗

NASA Lunar Mining and Construction Activities and Plans

The Space Exploration Policy enacted by the US Congress in 2005 calls for the US National Aeronautics and Space Administration (NASA) to implement a sustained and affordable human and robotic program to explore the solar system and beyond; Extend human presence across the solar system, starting with a human return to the Moon by the year 2020, in preparation for human exploration of Mars and other destinations; Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about the destinations for human exploration; and Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests. In 2006, NASA released the Lunar Architecture Study, which proposed establishing a lunar Outpost on the Moon with international participation to extend human presence beyond Earth's orbit, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere. The establishment of sustained human presence on the Moon for science and exploration combines the design, integration, and operation challenges experienced from both the short Apollo lunar missions and the build-up and sustained crew operations of the International Space Station (ISS). Apollo experience reminds developers and mission planners that hardware must operate under extremely harsh environmental and abrasive conditions and every kilogram of mass and payload must be critical to achieve the mission s objectives due to the difficulty and cost of reaching the lunar surface. Experience from the ISS reminds developers and mission planners that integration of all hardware must be designed and planned from the start of the program, operations and evolution of capabilities on a continuous basis are important, and long-term life-cycle costs and logistical needs are equally or more important than minimizing early development and test costs. Overarching all of this is the need to implement efforts that are sustainable and affordable. One area NASA is developing that can significantly change how systems required for sustained human presence are designed and integrated, as well as potentially break our reliance on Earth supplied logistics, is In-Situ Resource Utilization (ISRU). ISRU, also known living off the land, involves the extraction and processing of local resources into useful products. In particular, the ability to make propellants, life support consumables, fuel cell reagents, and radiation shielding can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. Also, the ability to modify the lunar landscape for safer landing, transfer of payloads from the lander an outpost, dust generation mitigation, and infrastructure placement and buildup are also extremely important for long-term lunar operations. While extra-terrestrial excavation, material handling and processing, and site preparation and construction may be new to NASA and other space agencies, there is extensive terrestrial hardware and commercial experience that can be leveraged. This paper will provide an overview of current NASA activities in lunar ISRU mining and construction and how terrestrial experience in these areas are important to achieving the goal of affordable and sustainable human exploration.

Sanders, Gerald B.↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

Optimal Operations Management of Mobility-on-Demand Systems

The emergence of the sharing economy in urban transportation networks has enabled new fast, convenient and accessible mobility services referred to as Mobilty-on-Demand systems (e.g., Uber, Lyft, DiDi). These platforms have flourished in the last decade around the globe and face many operational challenges in order to be competitive and provide good quality of service. A crucial step in the effective operation of these systems is to reduce customers' waiting time while properly selecting the optimal fleet size and pricing policy. In this paper, we jointly tackle three operational decisions: (i) fleet size, (ii) pricing, and (iii) rebalancing, in order to maximize the platform's profit or its customers' welfare. To accomplish this, we first devise an optimization framework which gives rise to a static policy. Then, we elaborate and propose dynamic policies that are more responsive to perturbations such as unexpected increases in demand. We test this framework in a simulation environment using three case studies and leveraging traffic flow and taxi data from Eastern Massachusetts, New York City, and Chicago. Our results show that solving the problem jointly could increase profits between 1% and up to 50%, depending on the benchmark. Moreover, we observe that the proposed fleet size yield utilization of the vehicles in the fleet is around 75% compared to private vehicle utilization of 5%.

Wollenstein-Betech, Salomón↗

Juno Gravity Science: Preparing for Data Collection at Jupiter

One of the primary goals of the Juno mission is to investigate Jupiter’s interior by mapping its gravitational field with the gravity science instrument. The Juno spacecraft has two radio science components that comprise the gravity science instrument: the X-band telecommunications system for a X-up/X-down link and a Ka-band Translator for a Ka-up/Ka-down link. The Deep Space Network’s DSS-25 beam waveguide antenna at the Goldstone Deep Space Communications Complex in California provides the X- and Ka-band uplink alongside an Advanced Water Vapor Radiometer to calibrate tropospheric effects. X-band and Ka-band downlink data are collected with both open-loop and closed-loop receivers located at the complex. Utilization of Ka-band provides scientific benefit to the Doppler measurements, but also adds operational challenges. Pointing of the uplink and downlink Ka-band signals requires additional systems to be calibrated and operated by the Deep Space Network; and the higher frequency of Ka-band means the signal dynamics are increased by a factor of four over X-band signals. Due to the spacecraft’s elliptical orbit and 4000 kilometer perijove altitude, it accelerates at an extreme rate as it approaches Jupiter, inducing large dynamic ranges in Doppler range of approximately 6 MHz over 3 hours at Ka-band. After the installation of a new Ka-band transmitter at DSS-25 for Juno was completed in 2015, end-to-end testing was conducted to ensure readiness for operations at Jupiter and provide an initial assessment of the performance. Cruise testing was conducted in the same operational configuration that the system will be used in during perijove passes. Processed open-loop data yielded uncalibrated Doppler residuals of 1.9 mHz at X-band and 6.0 mHz at Ka-band with 5-second compression time. Conduction of these tests has prepared the instrument and the operations team for science data collection during the science phase of the mission.

Buccino, Dustin↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Application of Machine Learning Techniques to Aviation Operations: Promises and Challenges

There is an increasing interest in applying methods based on Machine Learning Techniques (MLT) to problems in aviation operations. The current interest is based on developments in Cloud Computing, the availability of open software and the success of MLT in automation, consumer behavior and finance involving large database. This paper reviews the current-state-of-the art in applying MLT to aviation operations, its promises and challenges. Historically aviation operations have been analyzed using physics-based models and provide information for making operational decisions. This paper compares the methodology used in and issues to be addressed in applying either model-driven or data-driven methods. Some aviation operations involving many decision makers, multiple objectives, poor or unavailable physics-based models and a rich historical database are prime candidates for data-driven methods. The application of MLT to aviation operations falls into three categories: (a) based on the lack of a physics-based model, MLT is the favored approach, (b) marginal difference between regression methods using physics-based models and MLT and (c) better results using a blend of physics-based methods combined with MLT. As always, the best approach depends on the task, the physical understanding of the problem and the quality and quantity of the available data.

Sridhar, Banavar↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Within the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control. Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.

Mars↗

Impact of molten salt inflow on the temperature distribution in thermal energy storage tanks at startup for central receiver concentrating solar power plants

Concentrating Solar Power (CSP) systems with molten salt thermal energy storage (TES) tanks are one of the most promising, renewable-based energy conversion technologies for larger-scale power generation. The TES tank is one of the most critical components in CSP plants due to its high-temperature operation (up to 565 °C), daily thermal cycling, and intermittent solar radiation conditions. The plant startup is one of the most challenging operation conditions that could lead to damaging thermal gradients due to low salt inventory levels. In this study an analytical model for the sparger ring was developed and integrated with a detailed computational fluid dynamics model of a commercial-scaled molten salt tank. The integrated model allows an accurate representation of the tank operation to evaluate the effect of molten salt inflow on the mixing process. The tank filling process during plant startup was analyzed considering sparger rings with variations in design features, including inlet orifice configurations, number of orifices, direction of the inlets, and orifice diameter. The results demonstrated that higher temperature gradients are obtained in the tank floor during the plant startup. A sparger ring configuration with a predetermined orifice inlet inclination (30°, 45° and 60°) leads to significant temperature differences in the floor, between 57 °C and 62 °C, but better homogeneity in the temperature of the salt inventory. Lower salt inflow velocities result in a more homogeneous floor temperature, with maximum temperature differences under 38 °C. The sparger ring configuration with 52 orifices of 1-in. diameter and vertical flow showed better homogeneity in the temperature differences as a function of the salt level and lower temperature gradients in the tank floor. Because large temperature gradients in the tank's floor have been identified as one of the main factors contributing to tank failures, assessing various sparger ring design features is fundamental to determining proper inflow conditions that lead to low-temperature gradients and reducing failure susceptibility.

14 SOLAR ENERGY↗

Integrated Data Modeling and Simulation on the Joint Polar Satellite System Program

The Joint Polar Satellite System is a modern, large-scale, complex, multi-mission aerospace program, and presents a variety of design, testing and operational challenges due to: (1) System Scope: multi-mission coordination, role, responsibility and accountability challenges stemming from porous/ill-defined system and organizational boundaries (including foreign policy interactions) (2) Degree of Concurrency: design, implementation, integration, verification and operation occurring simultaneously, at multiple scales in the system hierarchy (3) Multi-Decadal Lifecycle: technical obsolesce, reliability and sustainment concerns, including those related to organizational and industrial base. Additionally, these systems tend to become embedded in the broader societal infrastructure, resulting in new system stakeholders with perhaps different preferences (4) Barriers to Effective Communications: process and cultural issues that emerge due to geographic dispersion and as one spans boundaries including gov./contractor, NASA/Other USG, and international relationships.

Roberts, Christopher J.↗