Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nuclear infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Nuclear Interdiction Through Relocatable Detectors

The NNSA Office of Nuclear Smuggling Detection and Deterrence (NSDD) has investigated a set of minimal-infrastructure radiation detection systems as alternatives to fixed Radiation Portal Monitors (RPMs) for nuclear interdiction applications. These versatile and relocatable systems can improve nuclear security in missions or locations that do not warrant or support a standard fixed radiation detection system. Over 2019, a variety of relocatable detectors were characterized at the Interdiction Technologies Integration Laboratory at Pacific Northwest National Laboratory (PNNL). Evaluated detectors were diverse in their size and capabilities, ranging from backpack-sized systems to lane-spanning cargo scanning portals. Both spectroscopic and non-spectroscopic pedestrian and vehicle detection systems were characterized against uranium and plutonium sources. Signatures from the sources were modulated by both shielding and distance to quantify the performance of the relocatable systems as signal strength was decreased. Findings showed that relocatable spectroscopic detectors with isotope identification capabilities could reduce nuisance alarm rates compared to conventional fixed installation, gross-counting, radiation portal monitors. In vehicle scanning applications, detection ability generally trended with detection volume, regardless of spectral capability. In pedestrian scanning applications, several smaller backpack-sized detector systems were found to be more sensitive to detecting material than pedestrian portal monitors. The results of this characterization effort have helped inform the deployment of versatile equipment to improve nuclear security missions.

relocatable detectors, Nuclear Security↗

PRO-X Fuel Cycle Transportation and Crosscutting Progress Report

The PRO-X program is actively supporting the design of nuclear systems by developing a framework to both optimize the fuel cycle infrastructure for advanced reactors (ARs) and minimize the potential for production of weapons-usable nuclear material. Three study topics are currently being investigated by Sandia National Laboratories (SNL) with support from Argonne National Laboratories (ANL). This multi-lab collaboration is focused on three study topics which may offer proliferation resistance opportunities or advantages in the nuclear fuel cycle. These topics are: 1) Transportation Global Landscape, 2) Transportation Avoidability, and 3) Parallel Modular Systems vs Single Large System (Crosscutting Activity).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modeling the use of mobile modular gas samplers in near-field detection

The Wireless Independent Noble Gas Sampler (WINGS) is a mobile, modular gas sampling system designed for use in low infrastructure environments. In the case of a suspected underground nuclear explosion (UNE), WINGS units could be deployed to detect noble gases emanating from the suspected explosion site or identify gases originating from another source entering the local area from offsite. In conclusion, this work uses the atmospheric transport modeling tool inline WRF-HYSPLIT to test the effectiveness of WINGS units around a suspected UNE site as a function of sampler density and distance from the emission point of gases from a UNE.

Air sampling↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Informed, Performance-Based, Technology-Inclusive Regulatory Infrastructure: Technology-Inclusive Determination of Mechanistic Source Terms for Offsite Dose-Related Assessments for Advanced Nuclear Reactor Facilities

This report summarizes a risk informed, performance-based and technology-inclusive approach to determine source terms for dose related assessments at advanced nuclear facilities. This approach uses a graded process which allows both the non-mechanistic source terms calculation methods, which adopt conservative approaches and assumptions based on known physical and chemical principles, and more importantly the mechanistic source term calculation methods, which consider design-specific scenarios and use best estimate models with uncertainty quantification for a range of licensing basis events (LBEs), to be used for the design and licensing of advanced nuclear technologies. The source terms developed with this graded approach, and radionuclide inventories elsewhere in the facility that are determined during source term analysis, can be used to address licensing issues to support the application processes of 10 CFR Part 50 for a construction permit and operating license or 10 CFR Part 52 for a Combined Operating License (COL), Standard Design Certification, Early Site Permit, Standard Design Approval or Manufacturing License. They can also be used for other purposes including equipment environmental qualification, control room habitability analyses, and assessments of severe accident risks in environmental impact statements. There are many advanced reactor concepts being developed including high temperature gas-cooled reactor (HGTR), sodium-cooled fast reactor (SFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), micro-reactor, etc. The graded approach presented in this report for source terms determination is, to the extent possible, generic to any of these reactor designs and to future reactor designs. This report provides information on the review of the regulatory foundation for use of conservative bounding source terms as well as event-specific mechanistic source terms for advanced nuclear reactor designs.

07 ISOTOPE AND RADIATION SOURCES↗

Laboratory Directed Research and Development Program Activities (LDRD 2021 Annual Report)

Each year, Brookhaven National Laboratory (BNL) is required to provide a report of its completed Laboratory Directed Research and Development Program (LDRD) projects to the Department of Energy (DOE) Office of Scientific and Technical Information in accordance with DOE Order 413.2C Chg1 (MinChg) dated August 2, 2018. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2021, in fulfillment of that requirement. In FY 2021, the BNL LDRD Program funded 68 projects, 24 of which were new starts, at a total cost of $17.1M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified six scientific initiatives that define the Laboratory’s scientific future and that will enable it to realize its overall vision. This requires simultaneous excellence in all aspects of BNL’s work – from science and operations, to external partnerships with the local, state, and national communities, and beyond. This is enabled by safe, efficient, and secure operations; by an unwavering commitment to a diverse, equitable, and inclusive environment, including workforce development, both with staff and reaching out to the community; and by a strong focus on renewed infrastructure. The six scientific initiatives are: (1) Nuclear Physics: The Electron Ion Collider, (2) Clean Energy and Climate, (3) Quantum Information Science and Technology, (4) Discovery Science Driven by the Human-AI-Facility Integration, (5) High Energy Physics: Building for Discovery, and (6) Accelerating Isotope Production: Ensuring the Nation’s Supply is Secure. The funded projects support BNL’s six scientific initiatives and priority programs as well as new areas of research and competencies at the Laboratory that are consistent with the Laboratory’s vision and mission. In total, these LDRD investments supported 80 postdoctoral researchers and graduate students in whole or in part and resulted in 136 publications and 3 awards. This Program Activities Report represents the future of BNL science; it is an impressive body of exploratory work that investigates many scientific and technical directions in support of the DOE and BNL missions.

07 ISOTOPE AND RADIATION SOURCES↗

LDRD 2022 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a report of its completed Laboratory Directed Research and Development Program (LDRD) projects to the Department of Energy (DOE) Office of Scientific and Technical Information in accordance with DOE Order 413.2C Chg1 (MinChg) dated August 2, 2018. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2022, in fulfillment of that requirement. In FY 2022, the BNL LDRD Program funded 70 projects, 30 of which were new starts, at a total cost of $17.2M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified seven scientific initiatives that define the Laboratory’s scientific future and that will enable it to realize its overall vision. This requires simultaneous excellence in all aspects of BNL’s work – from science and operations, to external partnerships with the local, state, and national communities, and beyond. This is enabled by safe, efficient, and secure operations; by an unwavering commitment to a diverse, equitable, and inclusive environment, including workforce development, both with staff and reaching out to the community; and by a strong focus on renewed infrastructure. The seven scientific initiatives are: 1) Nuclear Physics: uncover the structure of visible matter by constructing and operating the Electron-Ion Collider at BNL to maintain international leadership in nuclear physics for decades; 2) Clean Energy and Climate: support a net-zero U.S. economy through fundamental research in basic energy and climate sciences to revolutionize grid-scale storage, renewable integration, and the study of atmospheric processes with a new facility to improve climate predictability; 3) Quantum Information Science and Technology: discover new quantum materials to enhance quantum computers and develop an entanglement sharing quantum network as a prototype for the first quantum internet; 4) Discovery Science Driven by the Human-AI Facility Integration: revolutionize the operation of experiments across the sciences at user facilities and in core programs; 5) High Energy Physics: understand the origin of space and time with the ATLAS high luminosity upgrade at CERN and the future Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment; 6) Isotope Production: accelerate and expand isotope production to ensure the security of the Nation’s supply; 7) Accelerator Science and Technology: harness the cross-cutting accelerator science expertise at BNL to develop new facilities, improve and expand its user facilities, and promote the use of accelerators in industry. The funded projects support BNL’s seven scientific initiatives and priority programs as well as new areas of research and competencies at the Laboratory that are consistent with the Laboratory’s vision and mission. In total, these LDRD investments supported 43 postdoctoral researchers in whole or in part and resulted in 138 publications and 7 awards. This Program Activities Report represents the future of BNL science; it is an impressive body of exploratory work that investigates many scientific and technical directions in support of the DOE and BNL missions.

99 GENERAL AND MISCELLANEOUS↗

FY 2021 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. This FY 2021 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. The SSP was developed according to the narrative requirements from the “FY 2021 DOE Site Sustainability Plan Guidance” document issued in August 2020. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move INL toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into the INL Annual Laboratory Plan Fiscal Year 2020 (INL/LTD-20-59747), and operations and acquisition systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars.

exploration↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

National Reactor Innovation Center Update

Authorized by the Nuclear Energy Innovation Capabilities Act (NEICA) DOE-Office of Nuclear Energy; INL Nuclear Science & Tech Partner with industry to bridge the gap between research and commercial deployment Leverage national lab expertise and infrastructure

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Developing an AI-Powered Zero-Trust Cybersecurity Framework for Malware Prevention in Nuclear Power Plants

This study presents the development of an AI-powered Zero-Trust cybersecurity framework for malware prevention in nuclear power plants. The framework aims to enhance the security of critical systems within nuclear power plants by adopting the principles of Zero-Trust and leveraging artificial intelligence (AI) technologies. By assuming no implicit trust in any user or device and continuously authenticating and authorizing access, the framework ensures a robust defense against malware attacks. The integration of AI allows for the detection and prevention of malware through behavioral analytics, endpoint protection, network segmentation, and continuous monitoring. The paper discusses the key considerations, steps, and technologies involved in developing this framework, emphasizing the importance of regular updates, training, compliance, and auditing. The proposed framework serves as a comprehensive approach to safeguarding nuclear power plants from sophisticated malware threats and protecting the integrity and safety of critical infrastructure.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Facility Disposition and Modernization Partnership includes 1) Leading modernization efforts through infrastructure investments, technology development, and facility stewardship; 2) Development and implementation of the nuclear deactivation and downgrade strategy for nuclear facilities; 3) Reduction of risk to the environment, public, and workers; 4) Shrinking the DOE legacy footprint.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Approach to Post-Irradiation Examination of Nuclear Materials at Idaho National Laboratory

Idaho national Laboratory (INL) is the U.S. lead national laboratory for the Department of Energy’s Office of Nuclear Energy (DOE-NE), providing much of the nuclear research, development and demonstration capability needed to move nuclear innovation forward to deployment. INL’s Materials and Fuels Complex hosts a unique combination of personnel, facilities and infrastructure and offers the ability to perform post-irradiation examinations (PIE) of nuclear materials spanning multiple length scales. The ability to combine engineering-scale analysis and sub-microscopic characterization provides valuable insights into fuel and structural material behavior and degradation mechanisms. The holistic approach is used to accelerate these materials demonstration and deployment. Selected studies will be presented, highlighting the impact of these techniques on improving fuel reliability, safety, and efficiency, thereby advancing the development of sustainable and advanced nuclear energy technologies.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗