Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nonconforming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Gain and offset calibration reduces variation in exposure-dependent SNR among systems with identical digital flat-panel detectors

Purpose: The conditions under which vendor performance criteria for digital radiography systems are obtained do not adequately simulate the conditions of actual clinical imaging with respect to radiographic technique factors, scatter production, and scatter control. Therefore, the relationship between performance under ideal conditions and performance in clinical practice remains unclear. Using data from a large complement of systems in clinical use, the authors sought to develop a method to establish expected performance criteria for digital flat-panel radiography systems with respect to signal-to-noise ratio (SNR) versus detector exposure under clinical conditions for thoracic imaging. Methods: The authors made radiographic exposures of a patient-equivalent chest phantom at 125 kVp and 180 cm source-to-image distance. The mAs value was modified to produce exposures above and below the mAs delivered by automatic exposure control. Exposures measured free-in-air were corrected to the imaging plane by the inverse square law, by the attenuation factor of the phantom, and by the Bucky factor of the grid for the phantom, geometry, and kilovolt peak. SNR was evaluated as the ratio of the mean to the standard deviation (SD) of a region of interest automatically selected in the center of each unprocessed image. Data were acquired from 18 systems, 14 of which were tested both before and after gain and offset calibration. SNR as a function of detector exposure was interpolated using a double logarithmic function to stratify the data into groups of 0.2, 0.5, 1.0, 2.0, and 5.0 mR exposure (1.8, 4.5, 9.0, 18, and 45 {mu}Gy air KERMA) to the detector. Results: The mean SNR at each exposure interval after calibration exhibited linear dependence on the mean SNR before calibration (r{sup 2} = 0.9999). The dependence was greater than unity (m = 1.101 {+-} 0.006), and the difference from unity was statistically significant (p < 0.005). The SD of mean SNR after calibration also exhibited linear dependence on the SD of the mean SNR before calibration (r{sup 2} = 0.9997). This dependence was less than unity (m = 0.822 {+-} 0.008), and the difference from unity was also statistically significant (p < 0.005). Systems were separated into two groups: systems with a precalibration SNR higher than the median SNR (N = 7), and those with a precalibration SNR lower than the median SNR (N = 7). Posthoc analysis was performed to correct for expanded false positive results. After calibration, the authors noted differences in mean SNR within both high and low groups, but these differences were not statistically significant at the 0.05 level. SNR data from four additional systems and one system from those previously tested after replacement of its detector were compared to the 95% confidence intervals (CI) calculated from the postcalibration SNR data. The comparison indicated that four of these five systems were consistent with the CI derived from the previously tested 14 systems after calibration. Two systems from the paired group that remained outside the CI were studied further. One system was remedied with a grid replacement. The nonconformant behavior of the other system was corrected by replacing the image receptor. Conclusions: Exposure-dependent SNR measurements under conditions simulating thoracic imaging allowed us to develop criteria for digital flat-panel imaging systems from a single manufacturer. These measurements were useful in identifying systems with discrepant performance, including one with a defective grid, one with a defective detector, and one that had not been calibrated for gain and offset. The authors also found that the gain and offset calibration reduces variation in exposure-dependent SNR performance among the systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

De sitter space and perpetuum mobile

The general arguments that any interacting nonconformal classical field theory in de Sitter space leads to the possibility of constructing a perpetuum mobile is given. The arguments are based on the observation that massive free falling particles can radiate other massive particles on the classical level as seen by the free falling observer. The intensity of the radiation process is not zero even for particles with any finite mass, i.e., with a wavelength which is within causal domain. Hence, we conclude that either de Sitter space cannot exist eternally or that one can build a perpetuum mobile.

79 ASTRONOMY AND ASTROPHYSICS↗

Optimal-Order Preconditioners for Linear Systems Arising in the Semismooth Newton Solution of a Class of Control-Constrained Problems

We present a new multigrid preconditioner for the linear systems arising in the semismooth Newton method solution of certain control-constrained, quadratic distributed optimal control problems. Using a piecewise constant discretization of the control space, each semismooth Newton iteration essentially requires inverting a principal submatrix of the matrix entering the normal equations of the associated unconstrained optimal control problem, the rows (and columns) of the submatrix representing the constraints deemed inactive at the current iteration. Previously developed multigrid preconditioners for the aforementioned submatrices were based on constructing a sequence of conforming coarser spaces and proved to be of suboptimal quality for the class of problems considered. Instead, the multigrid preconditioner introduced in this work uses nonconforming coarse spaces, and it is shown that, under reasonable geometric assumptions on the constraints that are deemed inactive, the preconditioner approximates the inverse of the desired submatrix to optimal order. The preconditioner is tested numerically on a classical elliptic-constrained optimal control problem and further on a constrained image-deblurring problem.

97 MATHEMATICS AND COMPUTING↗

Large-Eddy Simulation over Complex Terrain Using an Improved Immersed Boundary Method in the Weather Research and Forecasting Model

Abstract The Weather Research and Forecasting (WRF) Model is increasingly being used for higher-resolution atmospheric simulations over complex terrain. With increased resolution, resolved terrain slopes become steeper, and the native terrain-following coordinates used in WRF result in numerical errors and instability. The immersed boundary method (IBM) uses a nonconformal grid with the terrain surface represented through interpolated forcing terms. Lundquist et al.’s WRF-IBM implementation eliminates the limitations of WRF’s terrain-following coordinate and was previously validated with a no-slip boundary condition for urban simulations and idealized terrain. This paper describes the implementation of a log-law boundary condition into WRF-IBM to extend its applicability to general atmospheric complex terrain simulations. The implementation of the improved WRF-IBM boundary condition is validated for neutral flow over flat terrain and the complex terrain cases of Askervein Hill, Scotland, and Bolund Hill, Denmark. First, comparisons are made to similarity theory and standard WRF results for the flat terrain case. Then, simulations of flow over the moderately sloped Askervein Hill are used to demonstrate agreement between the IBM and terrain-following WRF results, as well as agreement with observations. Finally, Bolund Hill simulations show that WRF-IBM can handle steep topography (standard WRF fails) and compares well to observations. Overall, the new WRF-IBM boundary condition shows improved performance, though the leeside representation of the flow can be potentially further improved.

54 ENVIRONMENTAL SCIENCES↗

End-to-end GPU acceleration of low-order-refined preconditioning for high-order finite element discretizations

In this article, we present algorithms and implementations for the end-to-end GPU acceleration of matrix-free low-order-refined preconditioning of high-order finite element problems. The methods described here allow for the construction of effective preconditioners for high-order problems with optimal memory usage and computational complexity. The preconditioners are based on the construction of a spectrally equivalent low-order discretization on a refined mesh, which is then amenable to, for example, algebraic multigrid preconditioning. The constants of equivalence are independent of mesh size and polynomial degree. For vector finite element problems in H(curl) and H(div) (e.g., for electromagnetic or radiation diffusion problems), a specially constructed interpolation–histopolation basis is used to ensure fast convergence. Detailed performance studies are carried out to analyze the efficiency of the GPU algorithms. The kernel throughput of each of the main algorithmic components is measured, and the strong and weak parallel scalability of the methods is demonstrated. The different relative weighting and significance of the algorithmic components on GPUs and CPUs is discussed. Results on problems involving adaptively refined nonconforming meshes are shown, and the use of the preconditioners on a large-scale magnetic diffusion problem using all spaces of the finite element de Rham complex is illustrated.

97 MATHEMATICS AND COMPUTING↗

Large-scale 3D geoelectromagnetic modeling using parallel adaptive high-order finite element method

Here, we have investigated the use of the adaptive high-order finite-element method (FEM) for geoelectromagnetic modeling. Because high-order FEM is challenging from the numerical and computational points of view, most published finite-element studies in geoelectromagnetics use the lowest order formulation. Solution of the resulting large system of linear equations poses the main practical challenge. We have developed a fully parallel and distributed robust and scalable linear solver based on the optimal block-diagonal and auxiliary space preconditioners. The solver was found to be efficient for high finite element orders, unstructured and nonconforming locally refined meshes, a wide range of frequencies, large conductivity contrasts, and number of degrees of freedom (DoFs). Furthermore, the presented linear solver is in essence algebraic; i.e., it acts on the matrix-vector level and thus requires no information about the discretization, boundary conditions, or physical source used, making it readily efficient for a wide range of electromagnetic modeling problems. To get accurate solutions at reduced computational cost, we have also implemented goal-oriented adaptive mesh refinement. The numerical tests indicated that if highly accurate modeling results were required, the high-order FEM in combination with the goal-oriented local mesh refinement required less computational time and DoFs than the lowest order adaptive FEM.

58 GEOSCIENCES↗

A deep learning-enhanced framework for multiphysics joint inversion

Joint inversion has drawn considerable attention due to the availability of multiple geophysical data sets, ever-increasing computational resources, the development of advanced algorithms, and its ability to reduce inversion uncertainty. A key issue of joint inversion is to develop effective strategies to link different geophysical data in a unified mathematical framework, in which the information obtained from different models can complement each other. We have developed a deep learning-enhanced joint inversion framework to simultaneously reconstruct different physical models by fusing different types of geophysical data. Traditionally, structure similarity constraints are pursued by joint inversion algorithms using manually crafted formulations (e.g., cross gradient). The constraint is constructed by a deep neural network (DNN) during the learning process. The framework is designed to combine the DNN and a traditional independent inversion workflow and improve the joint inversion result iteratively. The network can be easily extended to incorporate multiphysics without structural changes. Numerical experiments on the joint inversion of 2D DC resistivity data and seismic traveltime are used to validate our method. In addition, this learning-based framework demonstrates excellent generalization abilities when tested on data sets using different geologic structures. It also can handle different sensing configurations and nonconforming discretization.

Geochemistry & Geophysics↗

Analysis of the Axial Gap Vs Fiberboard Moisture Content in a 9975 Shipping Package

The fiberboard assembly within a 9975 shipping package contains a modest amount of moisture, which can migrate to the cooler regions of the package when an internal heat load is present. Typically, this leads to increased moisture levels in the bottom fiberboard layers, along with elevated chloride levels which can leach from the fiberboard. Concerns have been raised that this condition could lead to corrosion of the stainless steel drum. It has been postulated that checking the axial gap at the top of the package against the current 1 inch maximum criterion provides a sufficient indication regarding the integrity of the fiberboard and drum. This report estimates the increase in axial gap that might be expected for a given moisture increase in the bottom fiberboard layers, and the likelihood that the increase will create a nonconforming condition that will lead to identification of the moisture increase. Using data relating the fiberboard moisture content with the degree of compaction under load, the present analysis indicates that the axial gap will increase by 0.282 inch as the bottom fiberboard layers approach the saturation point. This increase will cause approximately 58% of packages with otherwise nominal package component dimensions to fail the axial gap criterion, based on a survey of axial gap values recorded in K-Area surveillance activities. As the moisture content increases above saturation, the predicted increase in axial gap jumps to 0.405 inch, which would result in 92% or more of all packages failing the axial gap criterion. The data and analysis described in this report are specific to cane fiberboard. While it is expected that softwood fiberboard will behave similarly, such behavior has not yet been demonstrated.

36 MATERIALS SCIENCE↗

CMM Interim Check (U)

Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

42 ENGINEERING↗

Defense Waste Processing Facility Canister Closure Weld Current Validation Testing

Two closure welds on filled Defense Waste Processing Facility (DWPF) canisters failed to be within the acceptance criteria in the DWPF operating procedure SW4-15.80-2.3 (1). In one case, the weld heat setting was inadvertently provided to the canister at the value used for test welds (i.e., 72%) and this oversight produced a weld at a current of nominally 210 kA compared to the operating procedure range (i.e., 82%) of 240 kA to 263 kA. The second weld appeared to experience an instrumentation and data acquisition upset. The current for this weld was reported as 191 kA. Review of the data from the Data Acquisition System (DAS) indicated that three of the four current legs were reading the expected values, approximately 62 kA each, and the fourth leg read zero current. Since there is no feasible way by further examination of the process data to ascertain if this weld was actually welded at either the target current or the lower current, a test plan was executed to provide assurance that these Nonconforming Welds (NCWs) meet the requirements for strength and leak tightness. Acceptance of the welds is based on evaluation of Test Nozzle Welds (TNW) made specifically for comparison. The TNW were nondestructively and destructively evaluated for plug height, heat tint, ultrasonic testing (UT) for bond length and ultrasonic volumetric examination for weld defects, burst pressure, fractography, and metallography. The testing was conducted in agreement with a Task Technical and Quality Assurance Plan (TTQAP) (2) and applicable procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and convergence analysis of the conforming virtual element method for polyharmonic problems

In the recent years, there has been a tremendous interest to numerical methods that approximate partial differential equations (PDEs) on computational meshes with arbitrarily-shaped polygonal/polyhedral (polytopal, for short) elements. A nonexhaustive list of such methods include the Mimetic Finite Difference method [4, 9, 21, 24, 28, 33, 35, 62, 64–67], the Polygonal Finite Element Method [68, 73, 74], the polygonal Discontinuous Galerkin Finite Element Methods [5, 7, 8, 10, 13–15, 18, 36, 38, 39, 41, 50], the Hybridizable Discontinuous Galerkin and Hybrid High-Order Methods [46–48, 51], the Gradient Discretization method [49, 53, 54], the Finite Volume Method [52], and the BEM-based FEM [71]. An alternative approach that also proved to be very successful is provided by the Virtual Element method (VEM), which was originally proposed in [19] for the numerical treatment of second-order elliptic problems [43, 44], and readily extended to linear and nonlinear elasticity [22, 25, 56], plate bending problems [37], Cahn-Hilliard equation [3], Stokes equations [2], Laplace-Beltrami equation [55], Darcy-Brinkam equation [76], discrete topology optimization problems [6], fracture networks problems [29], eigenvalue problems [59, 75]. The mixed virtual element formulation was proposed in [20, 34]; the nonconforming Virtual element formulations was proposed for second-order elliptic problems in [16], and later extended to general advection-reaction-diffusion problems, Stokes equation, the biharmonic problems, the iegenvalue problem, and the Schrodinger equation in [11, 30, 42, 45, 58, 80]. The p- and hp-version of the VEM were developed in [26, 27] and efficient multigrid methods for the resulting linear system of equations in [12]. A posteriori error estimates can be found in [40].

97 MATHEMATICS AND COMPUTING↗

Design Considerations Which Can Simplify Manufacturing (U) [Slides]

The purpose of this paper is to recommend design considerations which can significantly reduce the time required to manufacture parts, reducing cost to manufacture parts while increasing the quality of manufactured parts and minimize the likelihood of nonconformance conditions. The product design is ultimately the responsibility of the project engineers and their design teams. This paper is not intended to supersede design requirements.

42 ENGINEERING↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU09-OP2-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Variant fuel compact lot LEU09-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU09. LEU09 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-93073A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enriched uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93073A can be found in ORNL/TM-2008/134. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-12. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 3.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 UCO Baseline Compact Lot LEU07-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU06-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 B&W UO₂ Compact Lot LEU11-OP2-Z (Revision 1)

This document is a compilation of characterization data for the candidate AGR-2 B&W UO 2 fuel compact lot LEU11-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU11. LEU11 came from Babcock and Wilcox (B&W) coated particle lot G73H-10-93085B, which was an upgraded batch of TRISO-coated 500 μm nominal diameter, 9.6% low enriched uranium oxide kernels (LEU). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73AA-10-69308. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73H-10-93085B can be found in ORNL/TM-2009/255. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 4.3 of SPC-923 provides the property requirements for the heat treated UO 2 compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-14. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 4.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fiberboard Properties and Degradation Rates for Storage of 9975 Shipping Packages in KAC (2021 Status Report)

Thermal, mechanical, and physical properties have been measured on fiberboard samples following accelerated aging for up to 16 years. The aging environments include elevated temperature up to 250 ºF (the maximum allowed service temperature for fiberboard in 9975 packages) and elevated humidity. Accelerated aging results have been analyzed and used to build aging models. Correlations relating several properties (thermal conductivity, energy absorption, weight, dimensions, and density) to their rate of change in potential storage environments have been developed. Combined with an estimate of the actual conditions the fiberboard experiences in K-Area Complex (KAC), these models allow development of service life predictions. KAC completed calculations that supported extending the service life of 9975 packages with 3013 and non3013 containers in storage from 15 years to 20 years. These calculations addressed the potential for degraded fiberboard properties following 20 years in storage using degradation models developed previously. The updated degradation models developed in this report have been compared to the assumptions in these calculations, and the current results for fiberboard dimensions, density, radial thermal conductivity, and energy absorption remain consistent with those calculations. The axial thermal conductivity degradation rate slightly exceeds calculations estimate of 0.5% per year between 130 and 160 °F. Additional data will continue to be collected to permit future refinements to the models and assumptions. Some of the predicted degradation rates presented in this report are extreme. However, these relate to environments that do not exist within KAC or would be postulated only as upset conditions that would not likely persist for an extended period. For a typical package stored in KAC with approximately 10-12 watts internal heat load or less, and ambient temperatures below 90 ºF, the fiberboard assemblies experience storage conditions less severe than any of the aging environments. Fiberboard in conforming packages with lower internal heat loads should experience little or no degradation and is expected to provide a service life beyond the currently approved 20 year storage period. Packages with higher internal heat loads may not continue to perform their required safety functions beyond 20 years. Ultimately, service life will be determined by the cumulative effect of degradation from all the conditions these packages might encounter. The results and model predictions presented in this report are applicable to 9975 packages with cane or softwood fiberboard overpack assemblies. These degradation models do not address the effects of nonconforming conditions such as the presence of excess moisture and mold or beetle infestations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗