Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “manufacturing process planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X- 38CrewReturnVehicle(CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by NASA:s Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Space shuttle maintenance program planning document

A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

Brown, D. V.↗

Overview of the NASA balloon R&D program

The catastrophic balloon failure during the first half of the 1980's identified the need for a comprehensive and continuing balloon research and development (R&D) commitment by NASA. Technical understanding was lacking in many of the disciplines and processes associated with scientific ballooning. A comprehensive balloon R&D plan was developed in 1986 and implemented in 1987. The objectives were to develop the understanding of balloon system performance, limitations, and failure mechanisms. The program consisted of five major technical areas: structures, performance and analysis, materials, chemistry and processing, and quality control. Research activitites have been conducted at NASA/Goddard Space Flight Center (GSFC)-Wallops Flight Facility (WFF), other NASA centers and government facilities, universities, and the balloon manufacturers. Several new and increased capabilities and resources have resulted from this activity. The findings, capabilities, and plan of the balloon R&D program are presented.

Smith, I. Steve, Jr.↗

Mechanical Prototyping and Manufacturing Internship

The internship was located at the Johnson Space Center (JSC) Innovation Design Center (IDC), which is a facility where the JSC workforce can meet and conduct hands-on innovative design, fabrication, evaluation, and testing of ideas and concepts relevant to NASA's mission. The tasks of the internship included mechanical prototyping design and manufacturing projects in service of research and development as well as assisting the users of the IDC in completing their manufacturing projects. The first project was to manufacture hatch mechanisms for a team in the Systems Engineering and Project Advancement Program (SETMAP) hexacopter competition. These mechanisms were intended to improve the performance of the servomotors and offer an access point that would also seal to prevent cross-contamination. I also assisted other teams as they were constructing and modifying their hexacopters. The success of this competition demonstrated a proof of concept for aerial reconnaissance and sample return to be potentially used in future NASA missions. I also worked with Dr. Kumar Krishen to prototype an improved thermos and a novel, portable solar array. Computer-aided design (CAD) software was used to model the parts for both of these projects. Then, 3D printing as well as conventional techniques were used to produce the parts. These prototypes were then subjected to trials to determine the success of the designs. The solar array is intended to work in a cluster that is easy to set up and take down and doesn't require powered servomechanisms. It could be used terrestrially in areas not serviced by power grids. Both projects improve planetary exploration capabilities to future astronauts. Other projects included manufacturing custom rail brackets for EG-2, assisting engineers working on underwater instrument and tool cases for the NEEMO project, and helping to create mock-up parts for Space Center Houston. The use of the IDC enabled efficient completion of these projects at significantly reduced cost. I acquired and improved manufacturing and prototyping skills during my tour including learning about a CAD (Computer-Aided Design) program called Creo (Creo Parametric; design software), gaining valuable conventional machining experience with lathes, CNC (Computer Numerical Control) milling machines and various other tools, and improving my engineering project communication and collaboration skills. The internship also allowed me to better understand operations at NASA. I plan to work in the aerospace industry or do academic research benefitting space science and exploration, and this internship experience will enable me to have insight into manufacturing processes for research and development.

Grenfell, Peter↗

Supervised Autonomous Assembly to Create and Evolve Persistent Assets

Supervised autonomous assembly (SAA) will create a paradigm shift in the planning and design of future persistent assets (PAs), both in near zero-g environments and on planetary surfaces. SAA refers to an autonomy approach that has the benefits of autonomous assembly as well as the benefits provided by a supervisor (operator) who is available to resolve unexpected situations. SAA provides both increased design freedom as well as reduced programmatic risk. SAA enables evolution of future PAs over decades as in-space operations transition from single purpose missions to creation of PAs, such as laboratories and experimental stations which more closely resembling terrestrial laboratories that can easily adapt and evolve to new missions leveraging repeated visits to the PA. The ability to evolve enables PAs to rapidly respond to changing objectives resulting from new questions as our understanding improves. A recently initiated National Aeronautics and Space Administration (NASA) project in the Space Technology Mission Directorate (STMD) Game Changing Development (GCD) Program called the Precision Assembled Space Structure (PASS), leverages the advantages of SAA to develop technologies that enable efficient creation and evolution of hexagonal topologies; both planar (example: fuel depots) and curved (examples: telescopes and shelters). PASS will be used to provide context for the philosophy and concepts discussed as well as the decision and selections made. PASS objectives are: a) Develop confidence in SAA and on-orbit servicing, assembly and manufacturing (OSAM) technologies by executing a test campaign that uses a path-to-flight autonomous precision assembly process directly applicable to future space telescopes. b) Test autonomous technologies including automated path planning and error recovery, to emphasize a robust approach that relies on generic robots and special purpose tools. c) Validate critical component models using a digital twin that includes the assembled primary mirror support structure and assembly process. A digital twin is a high-fidelity simulation of the asset capable of predicting the on-orbit performance. The paper concludes after identifying the critical need for a modest assembly flight experiment to validate and develop confidence in the SAA paradigm, thus accelerating adoption of the benefits described. SAA is a game changing paradigm that enhances the ability of an organization to infuse new technology through rapid evolution of PAs while leveraging OSAM technologies.

Structural Modeling↗

Army (MANTECH) Thrust Area Concept: Optics Thrust Area

With the shrinking of the U.S. Army's material needs and the compression of defense requirements, the Army Manufacturing Technology (MANTECH) Program has the opportunity to advance the manufacturing state-of-the-art and solve near term production problems of the U.S. industrial base. To exploit this opportunity, the Army restructured its MANTECH efforts in FY 90 based on a thrust area concept. Each of the ten current thrusts, directed by a thrust area manager, has a broad technical objective selected to improve specific manufacturing processes. The manager is charged with setting objectives, selecting tasks, monitoring execution, leveraging external resources, and establishing microfactories to promote technology transfer. The Optics Manufacturing Thrust is an example of the concept. It is currently directed at revitalizing the domestic precision optics manufacturing base, now characterized by high labor costs and 1940's technology, through introduction of revolutionary machines, new processes, and Computer Integrated Manufacturing (CIM) principles. Leveraging of MANTECH dollars with those of industry, academia, and state governments led to the establishment of the center for Optics Manufacturing and plans for regional centers. Recognition of the U.S. as a world leader in precision optics manufacturing and a dramatic reduction of both manufacturing time and cost should accrue from thrust area efforts.

Kopacz, Stanley P.↗

Manufacturing Challenges Implementing Material Changes for the Super Light Weight External Tank: A Welding Process Perspective

A viewgraph presentation gives an overview of the manufacturing challenges in implementing welding material changes for the super lightweight external tank. Details are given on the external tank configuration, the weld purging equipment used, planning the selection of weld filler wire alloy, the initial weld microstructure, the wide panel tensile testing, and the dome cap welding.

Lawless, K.↗

Design for Safety - The Ares Launch Vehicles Paradigm Change

The lessons learned from the S&MA early involvement in the Ares I launch vehicle design phases proved that performing an in-line function jointly with engineering is critical for S&MA to have an effective role in supporting the system, element, and component design. These lessons learned were used to effectively support the Ares V conceptual design phase and planning for post conceptual design phases. The Top level Conceptual LOM assessment for Ares V performed by the S&MA community jointly with the engineering Advanced Concept Office (ACO) was influential in the final selection of the Ares V system configuration. Post conceptual phase, extensive reliability effort should be planned to support future Heavy Lift Launch Vehicles (HLLV) design. In-depth reliability analysis involving the design, manufacturing, and system engineering communities is critical to understand design and process uncertainties and system integrated failures.

Safie, Fayssal M.↗

MAB Phase Ceramics for Lunar Applications

During the ten-week internship my work focused on designing characterization protocol for 3D printed MAB phase ceramics on steel and Tiplates. I was mentored by Dr. Samuel Hocker of NASA and advised by Dr. Gupta from University of North Dakota. I also collaborated with Mackenzie Short from the University of North Dakota. The characterization protocol was divided into following steps; initially, we performed visual inspection of the plates. During this process, the coatings which spalled or delaminated were discarded for further evaluation. During the next step, we performed optical microscopy to discern and document surface features and porosities of the samples. We also noted some decomposition under the optical microscope as well. Thereafter, profilometry analysis was performed to understand the effect of power density on the surface roughness. Due to the deposited powder over the samples, the profilometry was inconclusive. We then cleaned the samples on the steel plate using ethanol and cotton swabs to wipe up the loose powder covering the samples. Detailed SEM analysis was then performed on the cleaned specimens. In parallel, the 3D printed samples on the Tiplate were cleaned by using an ultrasonic bath for 1h. Optical imaging showed that this cleaning process was more effective for cleaning except that small cracks propagated through the layered ceramics. The profilometry data gathered on the titanium plate after cleaning was more conclusive. The SEM data on the steel plate showed that there is decomposition at all wattages although at 100 W the extent of decomposition was lower. We are planning to characterize the steel samples after cleaning in ultrasonic bath for 5-10 min to minimize cracking during the cleaning process. In addition, we are also planning to study the fractured surface by SEM analysis.

Additive Manufacturing, Laser Powder Bed Fusion, S↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and Modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design and tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges of that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Automated Fiber Placement Defect Identity Cards: Cause, Anticipation, Existence, Significance, and Progression

Automated Fiber Placement (AFP), a major composite manufacturing process, can result in many defects during the layup process that often require manual corrective action to produce a part with acceptable quality. These defects are the main limitation of the technology and can be hard to categorize or define in many situations. This paper provides a thorough definition and classification of all AFP defects. This effort constitutes a comprehensive and extensive library relevant to AFP defects. The defects selected and defined in this work are based on understanding and experience from the manufacture and research of advanced composite structure. Proper classification of these defects required an in-depth literature review and consideration of various viewpoints ranging from designers, manufacturers, analysts, and inspection professionals. Collectively, these sources were utilized to develop the most accurate view of each of the individual defect types. The results are presented as identity cards for each defect type, intended to provide researchers and the manufacturing industry a clear understanding of the (1) cause, (2) anticipation, (3) existence, (4) significance, and (5) progression of the defined AFP defects. The link between AFP defects and process planning, layup strategies, and machining was also investigated. Categorization of all important automated fiber placement defects is presented.

Harik, Ramy↗

Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

Greene, William D.↗

Low Cost Nuclear Thermal Rocket Cermet Fuel Element Environment Testing

Deep space missions with large payloads require high specific impulse and relatively high thrust to achieve mission goals in reasonable time frames.1,2 Conventional storable propellants produce average specific impulse. Nuclear thermal rockets capable of producing high specific impulse are proposed. Nuclear thermal rockets employ heat produced by fission reaction to heat and therefore accelerate hydrogen, which is then forced through a rocket nozzle providing thrust. Fuel element temperatures are very high (up to 3000 K), and hydrogen is highly reactive with most materials at high temperatures. Data covering the effects of high-temperature hydrogen exposure on fuel elements are limited.3 The primary concern is the mechanical failure of fuel elements that employ high-melting-point metals, ceramics, or a combination (cermet) as a structural matrix into which the nuclear fuel is distributed. The purpose of the testing is to obtain data to assess the properties of the non-nuclear support materials, as-fabricated, and determine their ability to survive and maintain thermal performance in a prototypical NTR reactor environment of exposure to hydrogen at very high temperatures. The fission process of the planned fissile material and the resulting heating performance is well known and does not therefore require that active fissile material be integrated in this testing. A small-scale test bed designed to heat fuel element samples via non-contact radio frequency heating and expose samples to hydrogen is being developed to assist in optimal material and manufacturing process selection without employing fissile material. This paper details the test bed design and results of testing conducted to date.

Bradley, D. E.↗

NASA Technology Maturation Plan for In-space Manufacturing of Metals

As the International Space Station’s (ISS) life approaches its end, NASA intends to travel back to the Moon and establish a sustainable presence, paving a pathway towards Mars. A fundamental shift in the current logistics strategy is required to support extended missions. On-demand manufacturing enables reduced operational cost and increased long term sustainability providing a pathway towards reducing NASA’s logistics burden. The In-Space Manufacturing (ISM) portfolio at Marshall Space Flight Center is developing additive polymers, metals, and electronics manufacturing technologies to enable a sustainable presence on the Moon and enable long-duration transit missions. Manufacturing systems for in-space applications must meet a unique set of constraints requiring a maturation path independent from processes targeted for terrestrial use. In May 2023, the On Demand Manufacturing of Metals (ODMM) project, part of the ISM portfolio funded through the Game Changing Development (GCD) program office, was canceled; however, prior to cancelation, the engineering team developed a technology maturation plan for in-space manufacturing of metallic components. The status of ODMM at closeout and an overview of the technology maturation plan for ODMM are discussed.

In Space Manufacturing↗

Automated Array Assembly, Phase 2

The purpose of the overall program is to establish technological readiness and provide verification for the elements of a manufacturing sequence which would ultimately be suitable for the large-scale production of silicon solar-array modules at a selling price of less than $500/kW. A program and process plan for accomplishing this objective was developed and put into operation. Three junction-formation processes are shown; since cost analysis shows that they do not differ greatly in cost, each should be considered for technical merits and possible future cost reduction. The progress made in the various process steps of the plan is described, and conclusions are presented.

Daiello, R. V.↗

IPAD: Integrated Programs for Aerospace-Vehicle Design

The conference was organized to promote wider awareness of the IPAD program and its coming impact on American industry. The program focuses on technology issues that are critical to computer aided design manufacturing. Included is a description of a representative aerospace design process and its interface with manufacturing, the design of a future IPAD integrated computer aided design system, results to date in developing IPAD products and associated technology, and industry experiences and plans to exploit these products.

Source record↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗