Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “linac”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Low-energy muon and muonium beam source at Fermilab

We describe a high-efficiency source of muonium that can be transported as a beam in vacuum provides opportunities for fundamental muon and precision physics measurements such as sensitive searches for symmetry violation. Although PSI is currently the world leader, the intense 800-MeV PIP-II linac beam at Fermilab could provide world-class low-energy muon and muonium beams, with unparalleled intensity, driving the next generation of precision muon-based physics experiments at the intensity frontier. However, it is critical to initiate the prerequisite R&D now to prepare for the PIP-II era. A low-energy secondary muon line recently installed in an operating facility (the MeV Test Area, which utilizes the intense 400-MeV Fermilab Linac beam) could support the required R&D, and potentially compete for new physics in the immediate term, if approved. This beamline was developed for μ– and will need to be re-optimized for surface μ+ production and transport, making it also suitable for muon spin rotation physics––a unique research and industrial application for which no U.S. facility exists, and whose facilities are oversubscribed worldwide.

43 PARTICLE ACCELERATORS↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

The Ghost Collider: An Innovative Higgs Factory

The Ghost Collider is an innovative proposal for a 550 GeV centre-of-mass, 275 GeV per beam linear collid-er with four interaction regions, each with the design luminosity. The primary innovation is the use of “ghost bunches” containing equal numbers of electrons and posi-trons so they are electrically neutral. In the linacs, energy is transferred between electrons and positrons in the same bunch, decelerating one type of particle and using the energy to accelerate the other: a new class of Energy Re-covery Linacs. At the interaction points, collisions be-tween two neutral ghost bunches occurs with weakened electromagnetic interaction such as the beam-beam effect or disruption, ensuring that the particles and their energy can be recycled with minimal loss. Four “serial IPs” are incorporated, where chromatic errors produced in one IP are cancelled in the following IP. The neutral beam insta-bility at the IP is also addressed. All interaction points have the nominal luminosity per IP of 2.8 x 1034 cm-2s-1 for a facility luminosity of 1.1 x1035 cm-2s-1 @ 100 MW electrical power for the RF systems. The result is a totally original concept for an electron-positron collider.

Hutton, A. [Thomas Jefferson National Accelerator ↗

CW copper injector for SRF industrial cryomodules

Compact SRF industrial linacs can provide unique parameters of the beam (>1 MW and >1-10 MeV) hardly achievable by normal conducting linacs within limited space. SRF technology was prohibitively expensive until the development of conduction cooling which opened the way for compact stand alone SRF systems suitable for industrial and research applications. Limited cooling capacity puts strict requirements on the beam parameters with zero losses of the beam on the SRF cavity walls. This implies strict requirements on the beam energy to be accepted by the cryomodule and most importantly the beam bunching with zero particles in between. We designed a CW normal conducting RF injector which consists of a gridded RF gun integrated with a first cell of a copper booster cavity to satisfy these requirements. Here we present a complete design of a booster cavity including beam dynamics, RF, thermomechanical and engineering design.

43 PARTICLE ACCELERATORS↗

Beam loss modeling and mitigation due to intra-beam stripping

Intra-Beam Stripping (IBS) is a critical beam loss mechanism in high-intensity H- linacs and presents a significant limitation to increasing beam power. This work presents a computational framework to evaluate and mitigate IBS-induced beam loss along the Spallation Neutron Source (SNS) LINAC. Our calculation is based on an analytic theory and involves evaluation of a 9D integral using the Monte-Carlo technique. We first benchmarked our calculations against simplified, analytically solvable cases. We then applied our algorithm to Gaussian bunches with a known probability density function (PDF). We next expanded our algorithm to arbitrary bunch distributions using the Neural Spline Flow (NSF) models trained on PyORBIT tracking data. In the future, we plan to validate our algorithm experimentally and apply it to design IBS mitigation strategies.

Nln, Shivam [ORNL]↗

Time-of-Flight energy measurements with BPMs

The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighboring Beam Position Monitors (BPMs). This report presents estimations on implementation of such a procedure at PIP-II H- linac being constructed at Fermilab. In part, the case when the flight time between BPMs is larger than the period of BPM frequency is considered in detail. When the absolute BPM phase calibration is not available, the BPM phase information can be used to trace deviations of the beam energy from the desired value. Such “energy deviation” parameter is operationally implemented at the transfer line between 400 MeV Linac and the Booster, and its analog is expected to be used in the transfer line from PIP-II as well.

Shemyakin, Alexander [Fermilab] (ORCID:00000001501↗

Beam halo formation with different cathode distributions

Beam halo refers to the low-density distribution of particles extending beyond the beam core, and its generation and mitigation are important topics in particle accelerator design. Effective mitigation of beam halo is essential for the cooler design based on Energy Recovery Linac (ERL), which must deliver an electron beam with average beam current of 100 mA and a charge 1 nC per bunch. In the ERL injector and booster linacs, space charge effects are stronger due to relatively low beam energy (6 MeV). Additionally, the longer bunch length of approximately 100 ps in this regime vs the RF period of 5.08 ns makes the formation of beam halos more likely. Therefore, effective collimation of beam halo is critical to maintaining the required beam parameters. To design an effective collimation scheme, several halo distributions were generated at the cathode and used to study halo formation within the injector-merger. This paper presents different halo distributions and halo formation, providing insights on halo collimation strategy.

Accelerator Physics↗

Design update on the transition beamline for the CEBAF Energy Upgrade

For Jefferson Lab’s 22GeV upgrade, two new permanent-magnet Fixed-Field Alternating Gradient (FFA) arcs will be integrated to serve the accelerator’s six highest-energy recirculation passes. Connecting these FFA arcs to the existing linear accelerator (linac) requires a carefully engineered transition section. The current design has two parts where the first part adiabatically matches the beam dispersion and orbit trajectories, while the second part aligns the Twiss parameters (alpha and beta functions) with those at the linac entrance. Given the tight spatial constraints and multiple matching requirements, a genetic algorithm is being explored to optimize the beam optics matching. This paper presents the current progress in developing and optimizing this transition.

Accelerator Physics↗

GEANT4 Simulations on Faraday Cup Design for PIP-II Laser Wire Scanner System

The PIP-II accelerator upgrade at Fermilab represents a groundbreaking leap forward in high-energy physics research. This ambitious initiative involves enhancing Fermilab's accelerator complex by replacing the current linear accelerator with a warm front end (WFE) capable of accelerating H- beams up to 2.1 MeV. Subsequently, a superconducting linac further accelerates these beams up to 800 MeV. To precisely measure the transverse beam profile, a combination of traditional wire scanners at the WFE section and Laser wire scanners along the superconducting linac are planned for implementation. This investigation centers on refining the Faraday cup design for the PIP-II Laser wire scanners by utilizing GEANT4, a Monte Carlo simulation toolkit. Leveraging this method enables a comprehensive analysis of particle trajectories, energy deposition, secondary electron emission, backscattering, etc., facilitating optimization through adjustments to cup geometries, materials, and placement to maximize its efficiency.

43 PARTICLE ACCELERATORS↗

Adaptation of the Fermilab Proton Source to Support New Muon Facilities

he PIP-II proton accelerator will provide the intensity sufficient to power a new generation of high energy facilities at Fermilab. Extension of that linac to higher energy with following acceleration and bunching rings could provide the intensity needed to feed a muon production target for a high-energy $\mu^{+} - \mu^{-}$ collider. Scenarios using a rapid-cycling synchrotron or an $\sim$8 GeV Linac are presented and discussed. Some near-term opportunities at Fermilab for muon collider R&D are introduced.

43 PARTICLE ACCELERATORS↗

Flattening the Field during Injection in the Fermilab Booster using Dipole Corrector Magnets

The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ˜32 usec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550us. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.

43 PARTICLE ACCELERATORS↗

Overview of the New Beam Physics Research at the IOTA/FAST Facility

The Fermilab Accelerator Science and Technology (FAST) facility is dedicated to the exploration of novel concepts in accelerator and beam physics, and the development of a robust workforce, in order to enable and enhance next-generation particle accelerators. FAST comprises a high-brightness superconducting electron linac, and a storage ring, the Integrable Optics Test Accelerator (IOTA). Experiments in the most recent operational run include studies of nonlinear integrable lattices; tracking of single electrons; precise characterization of undulator radiation; studies with low-momentum-compaction lattices; and ultra-wide range beam diagnostics based on Photomultiplier tubes. In the linac, experiments on noise in intense electron bunches were conducted. The IOTA proton injector, currently being commissioned, will enable a diverse program on space-charge-dominated beams. Research areas include non-invasive beam profile monitoring for proton beams; beam dynamics with electron lenses; halo suppression, feedback systems, and electron cooling. In this presentation, we provide an overview of the recent results and highlight future plans together with opportunities for collaboration.

43 PARTICLE ACCELERATORS↗

Full Cycle Simulations of The Fermilab Booster

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.

43 PARTICLE ACCELERATORS↗

Geant4-based Analysis of Faraday Cup Performance for PIP-II Laser Wire Scanner System

The Proton Improvement Plan-II (PIP-II) accelerator upgrade at Fermilab marks a significant advancement in high-energy physics research. This initiative aims to enhance Fermilab's accelerator complex by replacing the existing linear accelerator (linac) with a warm front end (WFE) capable of accelerating H- beams up to 2.1 MeV. Subsequently, a superconducting linac (SCL), that further accelerates these beams up to 800 MeV. To accurately measure the transverse beam profile, traditional wire scanners will be utilized in the WFE section, while Laser wire scanners will be implemented along the SCL. The Faraday cup for the Laser wire scanners has been designed using the GEANT4 simulation toolkit. This poster presents a detailed analysis of its performance along the SCL, focusing on electron absorption, secondary electron emission, backscattering, etc.

Wijethunga, S. A.K.↗

The 2024 Run in the Injectors

The injectors provided polarized protons to RHIC for most of Run 24. That was followed by 3 weeks of Gold at 9.8 GeV/n using Tandem. Physics with PP was first declared on May 1 st and the PP portion of the run ended on Sept. 30 th . The standard BU4/AU4 setup was used for most of it. Although, from Sept. 7 th to 30 th the AGS skew quad setup (BU4/AU6) was used instead. More work was done on the Split/Merge setup (BU3/AU3) initially developed in Run 22. A two Linac pulse setup was also developed this run (BU4/AU2). As far as PP work in the injectors goes this note will focus on the standard, Split/Merge, and Two Linac pulse setups. The 9.8 GeV/n Tandem Au setup was essentially the same as in Run 23. The injector setup for Helium-3 from EBIS (BU7/AU7), which was used for an APEX study in RHIC on August 7 th , will be covered as well.

43 PARTICLE ACCELERATORS↗

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB 650 CM.

Yoon, S. [Fermilab]↗

Extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Kazimi, Reza↗