Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Mobile Sorption-based Thermal Battery for Harvesting Low-Temperature Geothermal Energy

Around 20% of the total primary energy in the United States is consumed for thermal demands of buildings such as space cooling, dehumidification, and space heating (EIA 2018). Low-temperature geothermal energy is abundant and can effectively satisfy buildings’ thermal demands. However, low-temperature geothermal energy is underutilized because the energy density of geothermal fluid is too low to justify the costs associated with transporting it between existing geothermal resources and buildings. The mobile sorption-based thermal battery (MSTB) system has been developed using three-phase (i.e., vapor–liquid, solution–solid, crystal) sorption technology to harvest low-temperature heat and store it with a much higher energy density than the geothermal fluid. The energy density of salt crystals is over six times higher than geothermal fluid, which makes long-distance transportation of salt crystals economically feasible. Salt crystals can be used to dehumidify air or provide space cooling in buildings, which alleviates peak demand on the electricity grid by offsetting electricity use for these end uses. This helps improve the grid’s stability and resilience. High-energy storage density, fast crystallization, and dissolution of salt crystals are all critical to the viability and performance of the MSTB system. Therefore, the design and operation of MSTB systems need to ensure effective generation and dissolution of salt crystals inside the MSTB. To achieve this target, this seedling project developed an experimental apparatus for characterizing the crystallization and dissolution processes. The energy density and potential latent cooling capacity of the MSTB are also evaluated based on lab test results. The crystallization results showed that the generated lithium chloride hydrate crystals are fluffy, the crystallization process lasts about 50 min, and the maximum crystal fraction (i.e., the ratio of crystal mass to the mass in the MSTB) can be up to 51.1% of the total mass in the MSTB at a solution flow rate of 1.58 g/s. The dissolution results show that the salt crystals in the MSTB can be fully dissolved within 15–28 min, based on different test conditions. Reducing solution flow rate and cooling water temperature can achieve increased energy storage density and crystal fraction. While the increase in the discharge rate (i.e., latent cooling capacity for dehumidifying air) is achieved by increasing flow rate and temperature of inlet diluted solution, as well as by using a pump for internal solution circulation, the discharge rate increases by 38%, from 0.95 kW to 1.31 kW. Compared with increasing the inlet solution flow rate, power consumption of salt solution transportation can be reduced by using a pump for internal solution circulation. The crystallization test results also showed that the maximum energy storage density is 981.8 kJ/kg, and the maximum discharge rate of the dissolution tests is ≤1.79 kW. Both are above the target values of 900 kJ/kg and 1.75 kW) for this project. The work reported here proves the feasibility and advancement of the MSTB system, which is helpful to the further study and improvement of the MSTB system.

15 GEOTHERMAL ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

EFCOG Best Practice HPI for Knowledge Workers ISM-HPI-22-02

This document is a collection of these best practices as determined by team members. This best practice attempts to: Realize opportunities to break the myth where people believe that HPI does not apply to them as they perform no physical work. Recommend options to create an environment that promotes intellectual collaboration and trust, enabling candor and vulnerability. Explain how errors manifest differently from the same human fallibility. Knowledge workers (KW) have errors that take different perspectives to find and mitigate the unique manifestation of these conditions. Help KW identify the critical steps (or risk important steps) in their processes. Reduce risk/consequence from KW errors (limit latent errors as well as finding latent conditions), building resiliency into KW tasks. Mitigation strategies may be different.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

End Station Refrigerator 2 Cryoplant at JLAB

The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper outlines the assembly, repair and modifications made to the cold box, along with the design of the plant as a whole and its integration into the existing distribution system.

Perry, Christopher↗

Low Cost Glass-Ceramic Matrix Composite Heat Exchanger

As part of ARPA-E’s High Intensity Thermal Exchange through Materials and Manufacturing Processes (HITEMMP) program, this project sought to develop novel heat exchanger (HX) capabilities to enable efficient and power dense power generation cycles. This class of HX comes under the category of ceramic/composite materials with the higher temperature goal in the program of ≥1100 °C inlet temperature operation. The enabling capability of this effort is the use of glass-ceramic matrix composite (GCMC) material which provides the high temperature durability of a ceramic, the flaw tolerance of a composite, a significantly faster and lower cost manufacturing process than conventional matrix CMCs and very low porosity levels < 0.5%. For thin-walled HX structures and the need to minimize leakage, the low porosity differentiator is particularly important. RTRC has prior experience with this material system and in the current project advanced the component design and manufacturing methods into new territory to produce features required for effective heat exchange under high pressures. In this approach, silicon carbide fiber is fabricated into a fiber preform using various textile processes. Graphite tooling is used both during the build-up of the fiber preform (interior tooling) and after the fiber preform has been completed (exterior tooling). This tooling assembly is heated to high temperature in an environment that has been evacuated and backfilled with inert gas. A reservoir of specialty glass is present and once the desired temperature has been reached to achieve the desired glass viscosity, an actuator distributes the glass throughout the fiber preform using passageways which are part of the tooling design in a process known as glass transfer molding. After the tooling has been removed, the composite is heat treated to convert the amorphous glass to a crystalline ceramic, providing improved properties. The project was divided into three phases focusing on the following: 1) 10 kW HX design and coupon-level tube sheet fabrication, 2) 10 kW HX fabrication, 3) 50 kW HX fabrication. During Budget Period 1 (BP1), additional risks were encountered and the need for additional funds was agreed upon by ARPA-E program leadership. Due to a variety of factors, the contract modification required nominally 18 months to execute at which time the HITEMMP program was effectively concluding. Because of this and the time that would be required to perform BP2 tasks, it was decided to conclude the project at the end of BP1. During the design of the 10 kW HX, manufacturing constraints were learned and incorporated, leading to a revised configuration for the fiber preform and HX. Heat exchange and pressure drop predictions also played a role in modifying the original design concept to be a higher aspect ratio shell-and-tube HX, simplifying the manufacturing process and improving the heat exchanger performance. Good gravimetric and volumetric thermal power densities of 11.2 kW/kg and 10,200 kW/m3 for the entire HX were projected that involved thermo-structural Finite Element Analysis to determine the structural mass needed for the high operation pressures of 250 bar cold inlet and 80 bar hot inlet. Fiber preforms using textile processes were produced for multiple headered tube sheets. Additional challenges were encountered during the glass transfer molding step for which solutions were identified, but programmatics did not allow them to be implemented in BP1. While complete HX test articles were not fabricated, the benefits of this GCMC material for a variety of high temperature applications remain.

30 DIRECT ENERGY CONVERSION↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Highly Efficient and Affordable Hybrid System for Hydrogen and Electricity Production (Final Project)

The pursuit of clean, secure, and sustainable energy has sparked significant interest in fuel cells for power generation and electrolyzer cells for hydrogen production. Among all types of fuel and electrolyzer cells, solid oxide cells (SOCs) have emerged as promising candidates due to their high efficiency and versatility. However, conventional oxygen-ion conductive SOCs face several challenges related to their performance and durability associated with their high-temperature operation (≥ 800 ºC). This has led to a growing interest in intermediate-temperature (≤ 650 ºC) proton-conducting solid oxide cells (p-SOCs) as potential alternatives. In collaboration between Phillips 66 and Georgia Tech, this project aims to achieve a 1 kW p-SOCs system to demonstrate the commercial viability of efficient SOC systems. This report addresses four primary areas and key challenges we overcame: (1) development of efficient and durable proton-conducting electrolyte (e.g., BaHf 0.1 Ce 0.7 Yb 0.2 O 3-δ ) and electrode/catalyst materials, (2) large area cell fabrication (10 x 10 cm 2 ), (3) scalable stack design and building (250 W and 1 kW), and (4) demonstration of a 1 kW prototype system. Notably, significant challenges faced during the large area cell fabrication process were addressed by achieving cell flatness, improving fabrication yield, and ensuring electrode/electrolyte interfacial adhesion. Stack designs were also developed, focusing on reducing contact resistance and optimizing stack components (e.g., sealants). These efforts resulted in the achievement of high performance and durability with promising outputs of 250 W and 1 kW. Furthermore, the integration of these stacks into a fuel-powered system was explored, with refinements made to heat management, as well as to pressure and heating conditions. The results demonstrated the potential applicability of our p-SOC technology in commercial energy storage and power generation systems. Additionally, the report discusses techno-economic analysis and a market transformation plan, aiming to evaluate and advance the commercial feasibility of this technology.

25 ENERGY STORAGE↗

Multiple Beam Triode Driven RF Sources for Accelerator Applications Phase I Final Report

Calabazas Creek Research, Inc, (CCR), in collaboration with Microwave Power Products, Inc. (MPP), formerly Communications & Power Industries, LLC (CPI,) and JP Accelerator Works, Inc. (JPAW), embarked on a program to develop multiple beam triodes to produce RF power from 350 – 800 MHz with an average power exceeding 200 kW. The effort was motivated by the performance of a triode-based RF source which produces 25 kW of UHF power at 90% efficiency. The CCR effort focused on implementing this technology into a multiple beam device to increase the output power while retaining the low cost, compact size, and high efficiency. The program performed extensive simulations indicating that the goals could be achieved, and a prototype multiple beam triode was built, baked, and tested. Unfortunately, a grid to cathode short terminated the testing before the tube could generate RF power. Nevertheless, the effort demonstrated that a multiple beam triode could be designed, built, baked, and energized to high voltage. The multiple beam triode used oxide cathodes, which are only capable of pulsed operation. The multiple beam triode will be rebuilt using dispenser cathodes, which will allow high duty or continuous operation. The grids were also modified to be more robust to avoid previous issues. The MB triode will provide the beam power for RF generation. The RF is generated by surrounding the triode with input and output cavities to convert beam power to RF power. RF cavities to generate 200 kW CW at 350-450 MHz using the MB triode with dispenser cathodes was assembled during the program. The next Phase of this effort is to assemble the multiple beam triode using the subassemblies built in the Phase I program and test with the RF cavities. The Phase I program also initiated design of a higher frequency, higher power multiple beam triode. That design is forecast to produce approximately 500 kW CW from 350 - 500 MHz.

43 PARTICLE ACCELERATORS↗

Spatially Resolved Domicile Charging Demands for Light-, Medium-, and Heavy-Duty Electric Vehicles in Virginia

The use of plug-in electric vehicles (PEVs) and resulting grid impacts are likely to grow rapidly, and evaluation of optimal smart charge management and grid integration strategies is warranted now. Evaluating distribution grid impacts requires fine-grained models of PEV operations to estimate charging loads across diverse vehicles at high spatial resolution. We propose such a model and consider a high-electrification scenario in Richmond and Newport News, Virginia. Our framework considers four categories of vehicle that are amenable to early aggressive electrification: light-duty passenger vehicles (LDV), trucks and vans with a focus on delivery or other local operations, school buses, and transit buses. These vehicles have a relatively consistent domicile, reducing the need for public charging infrastructure rollout to electrify. We apply a recent LDV model and propose new models for each vocation of medium- and heavy-duty vehicle, leveraging telematics data. We demonstrate our framework in Virginia and find energy demands in the region may total 15 GWh day, with most consumed by LDV. However, considering power demand at high spatial resolution reveals a different trend: LDVs have relatively small peak loads at specific sites (peak site demand around 800 kW) compared to average and high demand medium- and heavy-duty vehicle charging sites (peak site demand around 6,000 kW at a transit bus depot, 1,500 kW at a local freight hub, and 1,000 kW at a school). Our framework yields insights on the relative impacts of each vocation and enables future work to tailor grid integration strategies to each vehicle category.

33 ADVANCED PROPULSION SYSTEMS↗

Front-of-Meter Model Results

These files contains aggregations of key variables from the NREL Distributed Wind Futures Study using full parcel level data. These variables describe total technical and economic potential for distributed wind turbine deployment. Aggregations are available at the (1) county, (2) zipcode (zip code tabulation area or zcta), and (3) US Census block group level. Each scenario is coded with the scenario name (e.g., baseline) and year (e.g., 2022). Those files postfixed with 'econpot' contain results for only those parcels that are economically viable while the files postfixed with 'techpot' include results for all parcels that are technically feasible. Hence these correspond to technoeconomic and technical potential respectively. The data are available as CSV or Geopackage. Columns in the files are as follows: * geoid: geographic identifier (FIPS code or similar) * min_techpot_sum_kw: technical potential for all parcels in kW using turbines downsized to demand when appropriate * max_techpot_sum_kw: technical potential for all parcels in kW without downsizing turbines * aep_sum_kwh: annual energy production estimate in kWh * cf_mean_ratio: mean capacity factor * lcoe_mean_cents_per_kwh: mean levelized cost of energy for parcels in geography in cents per kWh * lcoe_std_cents_per_kwh: standard deviation of the above * parcel_area_sum_acres: total area of viable parcels in acres * n_turbines: number of cited turbines (one per viable parcel currently) Note: These are preliminary results from the full-parcel 2024 update of the Distributed Wind Energy Futures study. Please take care when making use of the data, and feel free to contact the team with any questions. Full documentation in support of these data is in progress and will follow.

17 WIND ENERGY↗

Behind-the-Meter Model Results

These files contains aggregations of key variables from the NREL Distributed Wind Futures Study using full parcel level data. These variables describe total technical and economic potential for distributed wind turbine deployment. Aggregations are available at the (1) county, (2) zipcode (zip code tabulation area or zcta), and (3) US Census block group level. Each scenario is coded with the scenario name (e.g., baseline) and year (e.g., 2022). Those files postfixed with 'econpot' contain results for only those parcels that are economically viable while the files postfixed with 'techpot' include results for all parcels that are technically feasible. Hence these correspond to technoeconomic and technical potential respectively. The data are available as CSV or Geopackage. Columns in the files are as follows: * geoid: geographic identifier (FIPS code or similar) * min_techpot_sum_kw: technical potential for all parcels in kW using turbines downsized to demand when appropriate * max_techpot_sum_kw: technical potential for all parcels in kW without downsizing turbines * aep_sum_kwh: annual energy production estimate in kWh * cf_mean_ratio: mean capacity factor * lcoe_mean_cents_per_kwh: mean levelized cost of energy for parcels in geography in cents per kWh * lcoe_std_cents_per_kwh: standard deviation of the above * parcel_area_sum_acres: total area of viable parcels in acres * n_turbines: number of cited turbines (one per viable parcel currently)

17 WIND ENERGY↗

Experimental validation of an organic rankine-vapor compression cooling cycle using low GWP refrigerant R1234ze(E)

There is a significant global opportunity to capture and utilize low grade waste heat to reduce fossil fuel consumption, greenhouse gas emissions, and improve energy efficiency across a wide range of industries. In this work, an advanced type of thermally activated cooling system, an organic Rankine-vapor compression cycle (ORVC) with novel heat integration strategies, was designed and tested at a relevant scale for industrial waste heat recovery (300 kW th cooling capacity). The ORVC linked an organic Rankine power cycle and a vapor compression cooling cycle using a turbine and compressor that shared a single shaft. The ORVC test facility absorbed waste heat from a liquid stream at 91 °C to simulate engine coolant in diesel generator sets, rejected heat to a glycol stream at 30 °C, and generated chilled water at 7 °C. A cooling capacity of 264 kW ± 3.5 kW was experimentally validated with a COP of 0.56 ± 0.01 during steady-state operation at the design temperatures. The thermal efficiency, accounting for pump work, of the Rankine cycle was 7.7% ± 0.22% and the COP of the vapor compression cycle was 5.25 ± 0.09. The centrifugal turbo-compressor operated at 31.5 kRPM ± 0.3 kRPM, with a turbine and compressor isentropic efficiencies of 76.7% ± 0.90% and 84.8% ± 0.54%, respectively, with near-perfect power transmission between these components. The pressure drop in the piping and heat exchangers were significantly larger than expected which had a detrimental impact on the performance of the ORVC. In addition, the condenser on the cooling cycle could not deliver the subcooling as specified from the design point modeling. Furthermore, the results from the sensitivity analysis showed that the higher condenser glycol outlet temperature had the largest impact on performance, which is consistent with other analytical models in the literature. When the ORVC simulations were updated with experimental values for isentropic efficiencies of the turbomachinery, the thermal COP was 0.66 which represents an estimate of the predicted performance if test facility limitations are overcome.

30 DIRECT ENERGY CONVERSION↗

Scalable and compact magnetocaloric heat pump technology

Magnetocaloric heat pumping (MCHP) promises to be more efficient than traditional vapor compression while also eliminating the deleterious effects of gaseous refrigerants. While MCHP devices have shown the temperature spans and efficiencies needed for different heating and cooling applications, they struggle to become commercially viable due to their large size and mass, and resultant high cost. This paper evaluates a baseline MCHP device and explores methods to boost its system power density (SPD). The key components of the baseline system are the gadolinium packed-particle bed active magnetic regenerator (AMR) and a magnetic source composed of permanent magnets and high permeability magnetic steel. To enhance the SPD, the paper evaluates maximizing the AMR volume, opting for first-order magnetocaloric materials, optimizing the magnet and AMR geometry, and reducing the size of magnets and magnetic steel parts. At larger thermal powers, increasing the AMR diameter and the number of magnetic poles were evaluated. Using finite element models, solid models, and estimates of magnetocaloric material performance, thermal powers ranging from 37 W to 44 kW at a nominal 10 K temperature span were projected, and SPD was estimated to improve from 6 W/kg to 81 W/kg. Neglecting end effects, an upper limit of 114 W/g is estimated. Compared to SPD of off-the-shelf compressors with similar environment temperatures, MCHP power density using gadolinium is competitive up to roughly 200 W of cooling power. This is extended to 1 kW when using LaFeSi alloys and up to 3 kW in the limiting case. In conclusion, these results indicate that the performance and mass of MCHP can match that of compressors, which is a critical step toward cost-competitive magnetocaloric technology.

42 ENGINEERING↗

Estimating the impact of tariff-driven behind-the-meter storage operation on distribution grid investments

Increasing growth of distributed solar photovoltaics (PV) and electric vehicles (EV) can strain local distribution networks and require costly upgrades. Distributed battery storage, often deployed alongside PV, can be used to mitigate those costs, depending on how batteries are operated. This study evaluates the potential deferral value of distributed battery storage across a range of tariff structures, focusing on the rate structures most commonly available to residential customers today and related variants. Deferrals are evaluated with a least-cost distribution grid expansion optimization model to identify requirements on line reconductoring, transformer upgrades, and voltage regulator installations under each tariff. Results show that TOU rates and net billing tariffs can yield meaningful deferral value, depending on specific tariff structure features. Under the best performing tariff structure tested, storage produced a median annualized deferral value of $7.18 per kW of storage capacity ( kW S ) across all feeders in the sample, though deferral values were considerably larger for feeders with peak loads that coincide with utility system peak, i.e., timing of TOU peak period. In contrast, under an unrestricted TOU design with no restrictions on grid charging or discharging, the median deferral value was $0/ kW S illustrating the critical importance of tariff structure details.

Rodriguez-Garcia, Luis↗