Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “iterative analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

Effect of Phenolic Matrix Microcracking on the Structural Response of a 3-D Woven Thermal Protection System

The effect of microcracking in the phenolic matrix of a three-dimensional woven thermal protection system (TPS) and the resulting material stiffness reduction was studied via a comparison of finite element analysis results from a linear analysis and an iterative linear analysis. A TPS is necessary to protect space vehicles from the aerodynamic heating of planetary entry. The Heatshield for Extreme Entry Environment Technology (HEEET) project has developed a TPS for use in high heat-flux and pressure missions. The material is a dual-layer continuous dry weave, which is then infiltrated with a low-density phenolic resin matrix to form a rigid ablator. The phenolic resin matrix does not have structural load transfer requirements, and testing has shown that the phenolic resin can fully satisfy thermal requirements when the matrix contains microcracks. Due to high stresses in the through-the-thickness direction of the material, phenolic microcracks may form in the matrix material, which would result in a reduction of stiffness. An exploratory study was conducted to determine if reduction in material stiffness would change the load paths and/or decrease the structural margins. A comparison was performed between a linear finite element analysis that did not take into account phenolic microcracking and an iterative linear finite element analysis that accounted for propagation of phenolic microcracking. Four subcases using varying assumptions were analyzed and the results indicate that the assumed strength at which the phenolic microcracking propagates was the critical parameter for determining the extent of microcracking in the phenolic matrix. Phenolic microcracking does not have an adverse effect on the structural response of the test article and is not a critical failure.

Langston, Sarah L.↗

Analysis of the ITER ICRH Decoupling and Matching System

The reference ITER ICRH load resilient matching system uses four 3dB hybrid power splitters. It is proposed to use a 'double stub' tuner (DST) configuration for the matching on the reference load and a decoupling system placed between the antenna plug and the matching system to reduce the mutual coupling effects and also to actively control the array current spectrum while requesting the same forward power from all 4 power sources. The paper analyzes (i) the optimization of the matching layout e.g. by varying the distance between the stubs and by the use of two capacitors taking into account the role of the decouplers on the matching requirements; (ii) the practical realization of the decouplers and their insertion into the circuit; (iii) the requests in voltage and current capabilities in the different parts of the system. The paper presents solutions for saving space and to decrease the ratings of the components. The computations are done with the array loading simulated by the TOPICA matrix.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Preliminary Neutronics Analysis of the ITER Toroidal Interferometer and Polarimeter Diagnostic Corner Cube Retroreflectors

ITER is an international project under construction in France that will demonstrate nuclear fusion at a power plant-relevant scale. The Toroidal Interferometer and Polarimeter (TIP) Diagnostic will be used to measure the plasma electron line density along 5 laser-beam chords. This line-averaged density measurement will be input to the ITER feedback-control system. The TIP is considered the primary diagnostic for these measurements, which are needed for basic ITER machine control. Therefore, system reliability & accuracy is a critical element in TIP’s design. There are two major challenges to the reliability of the TIP system. First is the survivability and performance of in-vessel optics and second is maintaining optical alignment over long optical paths and large vessel movements. Both of these issues greatly depend on minimizing the overall distortion due to neutron & gamma heating of the Corner Cube Retroreflectors (CCRs). These are small optical mirrors embedded in five first wall locations around the vacuum vessel, corresponding to certain plasma tangency radii. During the development of the design and location of these CCRs, several iterations of neutronics analyses were performed to determine and minimize the total distortion due to nuclear heating of the CCRs. The CCR corresponding to TIP Channel 2 was chosen for analysis as a good middle-road case, being an average distance from the plasma (of the five channels) and having moderate neutron shielding from its blanket shield housing. Results show that Channel 2 meets the requirements of the TIP Diagnostic, but barely. These results suggest other CCRs might be at risk of exceeding thermal deformation due to nuclear heating.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Iterative Strain-Gage Balance Calibration Data Analysis for Extended Independent Variable Sets

A new method was developed that makes it possible to use an extended set of independent calibration variables for an iterative analysis of wind tunnel strain gage balance calibration data. The new method permits the application of the iterative analysis method whenever the total number of balance loads and other independent calibration variables is greater than the total number of measured strain gage outputs. Iteration equations used by the iterative analysis method have the limitation that the number of independent and dependent variables must match. The new method circumvents this limitation. It simply adds a missing dependent variable to the original data set by using an additional independent variable also as an additional dependent variable. Then, the desired solution of the regression analysis problem can be obtained that fits each gage output as a function of both the original and additional independent calibration variables. The final regression coefficients can be converted to data reduction matrix coefficients because the missing dependent variables were added to the data set without changing the regression analysis result for each gage output. Therefore, the new method still supports the application of the two load iteration equation choices that the iterative method traditionally uses for the prediction of balance loads during a wind tunnel test. An example is discussed in the paper that illustrates the application of the new method to a realistic simulation of temperature dependent calibration data set of a six component balance.

Ulbrich, Norbert Manfred↗

A constitutive material model for nonlinear finite element structural analysis using an iterative matrix approach

A unified numerical method for the integration of stiff time dependent constitutive equations is presented. The solution process is directly applied to a constitutive model proposed by Bodner. The theory confronts time dependent inelastic behavior coupled with both isotropic hardening and directional hardening behaviors. Predicted stress-strain responses from this model are compared to experimental data from cyclic tests on uniaxial specimens. An algorithm is developed for the efficient integration of the Bodner flow equation. A comparison is made with the Euler integration method. An analysis of computational time is presented for the three algorithms.

Koenig, Herbert A.↗

Eigenmode analysis of the ITER ICRF antenna plug and electrical solution to the grounding of the antenna

The excitation of resonant modes in the gap between the ITER ICRH antenna plug and the vessel can considerably increase the level of RF currents and voltages on the ITER plug and disturb the radiation characteristic of the array. We report on a study of these modes and a solution to avoid them in the ITER ion cyclotron range of frequencies. From a transmission line approach we show that resonances can be avoided if the distance between the mouth of the line and an added short-circuit is sufficiently small. We therefore propose to position short-circuits at about lm from the antenna mouth, constituted by rows of closely spaced contacts all around the plug. These conclusions are further validated with Microwave Studio simulations. A simplified model of the ITER ICRF array is used for comparing various grounding solutions and it is proved that the solution already inferred from transmission line approximation suppresses the resonances from the frequency domain relevant for ICRH in ITER. The MWS calculations predict that the proposed solution also avoids large RF currents in the blanket modules and in their connectors. Their amplitude barely exceeds 5% of the strap RF currents. This solution avoids perturbation of the antenna array impedance matrix by the coaxial gap.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Analysis of the ITER ECH Waveguide Transmission Line Expansion Unit

The ITER Electron Cyclotron Heating (ECH) system consists of transmission lines made up of individual sections of evacuated, aluminum, circularly corrugated waveguides. The high-intensity beam of electromagnetic radiation, necessary for plasma heating, heats the waveguides and other components in the transmission lines causing the lines to expand and contract. To maintain the structural integrity and the required straightness in the transmission lines, expansion units have to be incorporated into the ECH transmission line system. Calculations of several models of expansion units have been completed in this paper to evaluate the effect of the design and materials on the functionality of the expansion unit. Finally, models have been evaluated assuming three different expansion ranges and several different materials.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and Analysis of the ITER Vertical Stability Coils

The ITER vertical stability (VS) coils have been developed through the preliminary design phase by Princeton Plasma Physics Laboratory (PPPL). Final design, prototyping and construction will be carried out by the Chinese Participant Team contributing lab, Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP). The VS coils are a part of the in-vessel coil systems which include edge localized mode (ELM) coils as well as the VS coils. An overview of the ELM coils is provided in another paper at this conference.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗