Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection policies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Utility-Scale Solar, 2021 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2021 Edition” provides an overview of key trends in the U.S. market, with a focus on 2020. Highlights of this year’s update include: A record of nearly 9.6 GWAC of new utility-scale PV capacity came online in 2020, bringing cumulative installed capacity to more than 38.7 GWAC across 43 states. 89% of all new utility-scale PV capacity added in 2020 uses single-axis tracking. Median installed project costs declined to $\$$1.4/WAC (or $\$$1.1/WDC) in 2020. Project-level capacity factors vary widely, from 9% to 36% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. Utility-scale PV’s LCOE fell to $\$$34/MWh in 2020 ($\$$28/MWh if factoring in the federal investment tax credit, or ITC). PPA prices have largely followed the decline in solar’s LCOE over time, but have stagnated more recently. Prices from a sample of recent contracts average just above $\$$20/MWh (levelized). In 2020, solar’s average market value (defined in the report to include only energy and capacity value) exceeded average wholesale prices in 12 of the 17 balancing authorities analyzed (including 4 of the 7 independent system operators across the United States). Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata for more than 150 PV+battery hybrid projects that are already online or that have secured offtake arrangements. At the end of 2020, there were at least 460 GW of utility-scale solar power capacity within the interconnection queues across the nation, 160 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Preliminary Design Process for Networked Microgrids

Changes in economic, technology, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, and the potential to integrate electricity generation with other municipal functions. When grid-connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via networks of microgrids. While the design process for a single stand-alone microgrid is relatively well understood, the process of designing the infrastructure for networked microgrid operations has not been well studied. Because of the wide range of potential operational goals for microgrids, it is typical to follow the engineering process of developing an initial conceptual design, a preliminary design, a detailed design, and then a final as-built design. The conceptual design is typically completed without detailed engineering analysis, and the preliminary design is the first stage that requires it. This paper presents a process for developing the preliminary design for networked microgrids, which can then be used as a basis for the final as-built design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Editorial: Innovations in climate resilience

At Battelle’s second Annual Innovations in Climate Resilience Conference, we were inspired this year by the phrase “Bold Leaps and Action.” Climate resilience is a goal and a field that requires boldness. Achieving a state in which societies, countries, continents, and even the globe is robust to changes in climate is often met with doubt, speculation, and indifference. Boldness is required to overcome the gap between an individual’s personal experience and the sheer scale of climate interactions that span from microbes to planets and from nanoseconds to millennia. Moreover, individual scientists, government leaders, and industrialists might each make a small impact and never directly see a measurable effect in Earth’s climate resilience. Is the scientific work in this area futile? Are we as a community on the right path or are we on the right track? Or are we collectively leveraging our potential and contributions toward scalable and more impactful climate resilience solutions that create compounding effects for cities, regions, countries? That leads us to the second part of the phrase that inspired us. It is not just bold leaps but it is action too. The scientific community must put into effect the discoveries that come along with our work in climate resilience. This includes the processes or activities that translate foundational science into real products that society can use. Never before in the history of this country have we had such a commitment to the Research Topic of climate resilience. The White House has made it a major part of their platform. Congress has appropriated and authorized billions of dollars in support. The part we need next is real action. Through our efforts we can discover the interconnected scientific breakthroughs at many spatial scales from city/regional/state to global that were not possible without those government programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Categorizing distributed wind energy installations in the United States to inform research and stakeholder priorities

Abstract Background Distributed wind energy adoption in the United States can contribute to the diverse portfolio of energy technologies needed to achieve ambitious decarbonization goals. However, with limited deployment to date, the current distributed wind market must be better understood; these efforts will support the range of stakeholders who will drive successful deployment. This article first distinguishes three categories of distributed wind from existing literature: (1) behind the meter, (2) intended for explicit local load, and (3) physically distributed. A novel methodology to classify individual wind installations into each of these categories is then presented and applied to two data sets of wind installations in the United States to categorize and illuminate distinct segments in the distributed wind market. Results Physically distributed installations, constituted by small to moderately sized projects serving local loads on distribution systems solely because of their proximity to them, account for the highest amount of capacity but the lowest number of installations out of the three categories. The inverse is true for behind-the-meter installations, which are used to serve on-site loads. Installations intended for explicit local load, which are interconnected on the utility side of the distribution system and intentionally built to provide energy to loads on the same distribution system, rank in the middle for both installed capacity and number of installations. Conclusions Distributed wind energy deployment in the United States is geographically widespread, but the extent to which a single category is developed in each state varies. Policies, wind resources, and broad energy technology trends contribute to these deployment patterns. By identifying the extent to which each category of installations exists, decision-makers are empowered with data necessary to tailor research and development programs and address stakeholder priorities through policy and other means, ultimately supporting future deployment.

17 WIND ENERGY↗

Model Guidance to Address Barriers to Combined Heat and Power and Waste Heat to Power

Congress directed that the US Department of Energy (DOE) initiate a review of interconnection rules to identify barriers to interconnection and ways to better integrate combined heat and power (CHP) and waste heat to power (WHP) in the electric grid. Oak Ridge National Laboratory (ORNL) supports DOE by providing technical assistance for CHP. DOE tasked ORNL with the interconnection review and development of model guidance to enable developers and CHP owners to interconnect more CHP. This report summarizes the work that DOE initiated in response to the congressional request.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated energy-water-land nexus planning in the Colorado River Basin (Argentina)

Integrated energy-water-land (EWL) planning promotes synergies and avoids conflicts in ways that sector-specific planning approaches cannot. Many important decisions that influence emerging EWL nexus issues are implemented at regional (e.g., large river basin, electricity grid) and sub-regional (e.g., small river basin, irrigation district) scales. However, actual implementation of integrated planning at these scales has been limited. Simply collecting and visualizing data and interconnections across multiple sectors and sub-regions in a single modeling platform is a unique endeavor in many regions. This study introduces and applies a novel approach to linking together multiple sub-regions in a single platform to characterize and visualize EWL resource use, EWL system linkages within and among sub-regions, and the EWL nexus implications of future policies and investments. This integrated planning methodology is applied in the water-stressed Colorado River Basin in Argentina, which is facing increasing demands for agricultural and fossil fuel commodities. Guided by stakeholders, this study seeks to inform basin planning activities by characterizing and visualizing (1) the basin’s current state of EWL resources, (2) the linkages between sectors within and among basin sub-regions, and (3) the EWL nexus implications of planned future agricultural development activities. Results show that water scarcity, driven in part by human demands that have historically reached 60% of total surface water supply, poses a substantial constraint to economic development in the basin. The Colorado basin has the potential to serve as a testbed for crafting novel and generalizable sub-regional EWL planning approaches capable of informing the EWL planning dialogue globally.

54 ENVIRONMENTAL SCIENCES↗

Land-Based Wind Market Report: 2024 Edition

Wind power additions in the United States totaled 6.5 gigawatts (GW) of capacity in 2023. 1 Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as numerous state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions, yielding low-priced wind energy for utility, corporate, and other power purchasers. Nonetheless, 2023 was a slow year in terms of new wind deployment, the lowest since 2014. Elevated interest rates played a role in slowing deployment, as did interconnection and siting challenges.

17 WIND ENERGY↗

Reinforcement Learning-based Output Structured Feedback for Distributed Multi-Area Power System Frequency Control

Load frequency control (LFC) is a key factor to maintain the stable frequency in multi-area power systems. As the modern power systems evolve from centralized to decentralized paradigm, LFC needs to consider the decentralized scheme that considers limited information from the information-exchange graph for the generator control of each interconnected area. This paper aims to solve a data-driven constrained LQR problem with mean-variance risk constraints and output structured feedback, and applies this framework to solve the LFC problem in multi-area power systems. By reformulating the constrained optimization problem into a minimax problem, the stochastic gradient descent max-oracle (SGDmax) algorithm with zero-order policy gradient (ZOPG) is adopted to find the optimal feedback gain from the learning, while guaranteeing the convergence. In addition, to improve the adaptation of the proposed learning method to new or varying models, we construct an emulator grid that approximates the dynamics of a physical grid and performs training based on this model. Once the feedback gain is obtained from the emulator grid, it is applied to the physical grid with a robustness test to check whether the controller from the approximated emulator applies to the actual system. Numerical tests show that the obtained feedback controller can successfully control the frequency of each area, while mitigating the uncertainty from the loads, with reliable robustness that ensures the adaptability of the obtained feedback gain to the actual physical grid.

Kwon, Kyung-bin↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission and Distribution Coordination

This webinar explores planning the future grid and interconnected energy system while examining balancing generation (G), transmission (T), distribution (D), & customer (C) resources all while also increasingly capturing engineering details in planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Powering Post-COVID-19 Resilient Recovery with Green Stimulus

As the coronavirus disease (COVID-19) pandemic spread globally in early 2020, many governments enacted lockdown measures as an initial containment response. These lockdowns, while effective in slowing infection rates, have also had substantial economic consequences. A series of supply and demand shocks, workforce and supply chain disruptions, and other impacts of the pandemic and ensuing lockdowns have upended the livelihoods for much of the world's population. This quick read spotlights how green stimulus plans and other recovery measures can support near-term recovery and enable longer-term power system resilience against future threats. The term “green stimulus” encompasses fiscal measures (i.e., governmental tax and spending actions) that support short-term economic activity that enhances environmental and natural resource quality over a longer term. The deployment of energy efficiency (EE) and renewable energy (RE) technologies, as well as associated initiatives (e.g., grid modernization, electrification of transport, and so on) have been demonstrably effective in providing this kind of short-run economic boost while simultaneously strengthening the resilience of the power sector. Along with green stimulus packages, concurrent action on the regulatory side—for example, the development of green building codes, updating grid interconnection standards, creating programs and marketplaces for demand-side efficiency, and others—can be a force multiplier in ensuring that public spending achieves maximum impact in near-term recovery and long-term power sector transformation

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

Frequency Control and Dynamics (Part 1) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Control and Dynamics (Part 2) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗