Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integration cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs: Cost Assessment of Manufacturing/Design Concepts

The objective of the Integral Airframe Structures (IAS) program was to demonstrate, for an integrally stiffened structural concept, performance and weight equal to "built-up" structure with lower manufacturing cost. This report presents results of the cost assessment for several design configuration/manufacturing method combinations. The attributes of various cost analysis models were evaluated and COSTRAN selected for this study. A process/design cost evaluation matrix was developed based on material, forming, machining, and assembly of structural sub-elements and assembled structure. A hybrid design, made from high-speed machined extruded frames that are mechanically fastened to high-speed machined plate skin/stringer panels, was identified as the most cost-effective manufacturing solution. Recurring labor and material costs of the hybrid design are up to 61 percent less than the current built-up technology baseline. This would correspond to a total cost reduction of $1.7 million per ship set for a 777-sized airplane. However, there are important outstanding issues with regard to the cost of capacity of high technology machinery, and the ability to cost-effectively provide surface finish acceptable to the commercial aircraft industry. The projected high raw material cost of large extrusions also played an important role in the trade-off between plate and extruded concepts.

Metschan, S.↗

Solar Power System and Radioisotope Thermoelectric Generation Technologies at Jupiter-Saturn-Uranus Environments: New Insights and Paradigms

Power system selection for outer planet destinations, such as Jupiter, Saturn, and Uranus and beyond, is complex, involving and dependent on many interdisciplinary factors such as power system mass, specific power, cost, mechanical and electrical integration, and natural radiation environment. Low solar irradiance at Jupiter, Saturn, and Uranus systems (i.e., 50, 15, and 4 W/m2 , respectively) makes solar power systems challenging in mechanical / electrical integration and accommodating radiation environments. More costly radioisotope thermoelectric generator (RTG) systems can help proposed missions overcome radiation environment and spacecraft control challenges at Jupiter, Saturn, and Uranus. NASA’s Jet Propulsion Laboratory (JPL) has recently made significant strides in demonstrating high-efficiency, radiation-hard solar cell technologies for low-irradiance, low-temperature (LILT) applications, and high-efficiency thermoelectric (TE) materials and modules for higher-specific-power RTGs. Stateof-art multi-junction solar cells now routinely demonstrate high efficiencies of 30-34% at LILT (9.5AU and -165°C), making solar arrays a viable option for many near-term Saturn mission concepts. Emerging technologies like LILToptimized solar cells have recently demonstrated even higher efficiencies of 37% at 9.5AU and -165°C and 30% lower mass than the state-of-art, offering the prospect of ~3W/kg array-level, end-of-life specific powers under Saturn conditions. Having already demonstrated the tremendous utility of RTGs on Mars and in deep-space missions (e.g., Galileo at Jupiter, New Horizons at Pluto), NASA is now developing and demonstrating new TE materials and modules (e.g., skutterudites, La3-x Te4, and Zintls) for increasing RTG specific power (up to >8.5 W/kg), which strongly impacts an RTG’s mass, fuel utilization, and modularity in the power system trade domain. New accomplishments in both areas highlight the renewed requisite for updated comparisons and trade-offs in power output, specific power and mass, cost, mechanical and electrical integration, new technology timelines, and natural radiation impacts between new LILT-optimized photovoltaic technologies and next-generation RTG technologies. This work discusses and demonstrates how new LILT-based technologies are now allowing one to consider and design solar power systems for Saturn orbit and beyond, and are changing the potential cost-mass trade-offs between emerging solar power technologies and newly-envisioned RTG technologies. Key updated system mass and cost trade-offs between high-performance LILT solar technologies and new RTG technologies are presented, reinforcing and refining power selection criteria supporting possible future NASA deep-space science and exploration missions to Mars, the Jupiter system (Europa, Ganymede), the Saturn system (Titan, Enceladus), Uranus, and beyond. Key trade-offs in other above-mentioned interdisciplinary factors between these two power technologies are also discussed.

Bairstow, Brian K.↗

Smart and Intelligent Sensors

John C. Stennis Space Center (SSC) provides rocket engine propulsion testing for NASA's space programs. Since the development of the Space Shuttle, every Space Shuttle Main Engine (SSME) has undergone acceptance testing at SSC before going to Kennedy Space Center (KSC) for integration into the Space Shuttle. The SSME is a large cryogenic rocket engine that uses Liquid Hydrogen (LH2) as the fuel. As NASA moves to the new ARES V launch system, the main engines on the new vehicle, as well as the upper stage engine, are currently base lined to be cryogenic rocket engines that will also use LH2. The main rocket engines for the ARES V will be larger than the SSME, while the upper stage engine will be approximately half that size. As a result, significant quantities of hydrogen will be required during the development, testing, and operation of these rocket engines.Better approaches are needed to simplify sensor integration and help reduce life-cycle costs. 1.Smarter sensors. Sensor integration should be a matter of "plug-and-play" making sensors easier to add to a system. Sensors that implement new standards can help address this problem; for example, IEEE STD 1451.4 defines transducer electronic data sheet (TEDS) templates for commonly used sensors such as bridge elements and thermocouples. When a 1451.4 compliant smart sensor is connected to a system that can read the TEDS memory, all information needed to configure the data acquisition system can be uploaded. This reduces the amount of labor required and helps minimize configuration errors. 2.Intelligent sensors. Data received from a sensor be scaled, linearized; and converted to engineering units. Methods to reduce sensor processing overhead at the application node are needed. Smart sensors using low-cost microprocessors with integral data acquisition and communication support offer the means to add these capabilities. Once a processor is embedded, other features can be added; for example, intelligent sensors can make a health assessment to inform the data acquisition client when sensor performance is suspect. 3.Distributed sample synchronization. Networks of sensors require new ways for synchronizing samples. Standards that address the distributed timing problem (for example, IEEE STD 1588) provide the means to aggregate samples from many distributed smart sensors with sub-microsecond accuracy. 4. Reduction in interconnect. Alternative means are needed to reduce the frequent problems associated with cabling and connectors. Wireless technologies offer the promise of reducing interconnects and simultaneously making it easy to quickly add a sensor to a system.

Lansaw, John↗

Integration of safety engineering into a cost optimized development program.

A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'

Ball, L. W.↗

Multimission Telemetry Visualization (MTV) system: A mission applications project from JPL's Multimedia Communications Laboratory

This paper describes the Multimission Telemetry Visualization (MTV) data acquisition/distribution system. MTV was developed by JPL's Multimedia Communications Laboratory (MCL) and designed to process and display digital, real-time, science and engineering data from JPL's Mission Control Center. The MTV system can be accessed using UNIX workstations and PC's over common datacom and telecom networks from worldwide locations. It is designed to lower data distribution costs while increasing data analysis functionality by integrating low-cost, off-the-shelf desktop hardware and software. MTV is expected to significantly lower the cost of real-time data display, processing, distribution, and allow for greater spacecraft safety and mission data access.

Koeberlein, Ernest, III↗

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗

Voice Over Internet Protocol (VoIP) in a Control Center Environment

The technology of transmitting voice over data networks has been available for over 10 years. Mass market VoIP services for consumers to make and receive standard telephone calls over broadband Internet networks have grown in the last 5 years. While operational costs are less with VoIP implementations as opposed to time division multiplexing (TDM) based voice switches, is it still advantageous to convert a mission control center s voice system to this newer technology? Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) has converted its mission voice services to a commercial product that utilizes VoIP technology. Results from this testing, design, and installation have shown unique considerations that must be addressed before user operations. There are many factors to consider for a control center voice design. Technology advantages and disadvantages were investigated as they refer to cost. There were integration concerns which could lead to complex failure scenarios but simpler integration for the mission infrastructure. MSFC HOSC will benefit from this voice conversion with less product replacement cost, less operations cost and a more integrated mission services environment.

Calvelage, Steven↗

Voice Over Internet Protocol (VoIP) in a Control Center Environment

The technology of transmitting voice over data networks has been available for over 10 years. Mass market VoIP services for consumers to make and receive standard telephone calls over broadband Internet networks have grown in the last 5 years. While operational costs are less with VoIP implementations as opposed to time division multiplexing (TDM) based voice switches, is it still advantageous to convert a mission control center s voice system to this newer technology? Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) has converted its mission voice services to a commercial product that utilizes VoIP technology. Results from this testing, design, and installation have shown unique considerations that must be addressed before user operations. There are many factors to consider for a control center voice design. Technology advantages and disadvantages were investigated as they refer to cost. There were integration concerns which could lead to complex failure scenarios but simpler integration for the mission infrastructure. MSFC HOSC will benefit from this voice conversion with less product replacement cost, less operations cost and a more integrated mission services environment.

Pirani, Joseph↗

The Necessity of Functional Analysis for Space Exploration Programs

As NASA moves toward expanded commercial spaceflight within its human exploration capability, there is increased emphasis on how to allocate responsibilities between government and commercial organizations to achieve coordinated program objectives. The practice of program-level functional analysis offers an opportunity for improved understanding of collaborative functions among heterogeneous partners. Functional analysis is contrasted with the physical analysis more commonly done at the program level, and is shown to provide theoretical performance, risk, and safety advantages beneficial to a government-commercial partnership. Performance advantages include faster convergence to acceptable system solutions; discovery of superior solutions with higher commonality, greater simplicity and greater parallelism by substituting functional for physical redundancy to achieve robustness and safety goals; and greater organizational cohesion around program objectives. Risk advantages include avoidance of rework by revelation of some kinds of architectural and contractual mismatches before systems are specified, designed, constructed, or integrated; avoidance of cost and schedule growth by more complete and precise specifications of cost and schedule estimates; and higher likelihood of successful integration on the first try. Safety advantages include effective delineation of must-work and must-not-work functions for integrated hazard analysis, the ability to formally demonstrate completeness of safety analyses, and provably correct logic for certification of flight readiness. The key mechanism for realizing these benefits is the development of an inter-functional architecture at the program level, which reveals relationships between top-level system requirements that would otherwise be invisible using only a physical architecture. This paper describes the advantages and pitfalls of functional analysis as a means of coordinating the actions of large heterogeneous organizations for space exploration programs.

program management↗

Wireless Sensor Instrumentation for Distributed Sensing in Ground-Test Facilities

Wireless sensors have a number of advantages over wired sensors for flexible or temporary diagnostic deployment in a field or lab setting. Relative to wireless alternatives, traditional wired systems encounter limitations including spatial and weight constraints, maintenance costs, and signal integrity in high-noise environments. Ground-test facilities often face these challenges and cause increase down-time costs and failure of data integrity. This paper describes the development and implementation of flexible wireless sensor boards for applications within ground-test facilities using different network architectures. These boards implement state-of-the- art STM32 microprocessor chips for high-speed data acquisition and computational power. Additionally, the design integrates long-range radio transceivers with power output of +20dBm, easily reaching 2 km range, while maintaining high interference immunity and minimizing current consumption. The wireless sensor boards were implemented to demonstrate performance through benchmark testing and by taking distributed electrically-isolated measurements on a high-voltage lab apparatus while using different network architectures. Although this test case is in a laboratory setting, this network architecture could be easily repurposed for various other forms of monitoring.

Wireless Sensor Network↗

Micro Navigator

Miniature high-performance low-mass space avionics systems are desired for planned future outer planetary exploration missions (i.e. Europa Orbiter/Lander, Pluto-Kuiper Express). The spacecraft fuel and mass requirements enabling orbit insertion is the driving requirement. The Micro Navigator is an integrated autonomous Guidance, Navigation & Control (GN&C)micro-system that would provide the critical avionics function for navigation, pointing, and precision landing. The Micro Navigator hardware and software allow fusion of data from multiple sensors to provide a single integrated vehicle state vector necessary for six degrees of freedom GN&C. The benefits of this MicroNavigator include: 1) The Micro Navigator employs MEMS devices that promise orders of magnitude reductions in mass power and volume of inertial sensors (accelerometers and gyroscopes), celestial sensing devices (startracker, sun sensor), and computing element; 2) The highly integrated nature of the unit will reduce the cost of flight missions. a) The advanced miniaturization technologies employed by the Micro Navigator lend themselves to mass production, and therefore will reduce production cost of spacecraft. b) The integral approach simplifies interface issues associated with discrete components and reduces cost associated with integration and test of multiple components; and 3) The integration of sensors and processing elements into a single unit will allow the Micro Navigator to encapsulate attitude information and determination functions into a single object. This is particularly beneficial for object-oriented software architectures that are used in advanced spacecraft. Additional information is contained in the original extended abstract.

Blaes, B. R.↗

Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs

The continual need to reduce airframe cost and the emergence of high speed machining and other manufacturing technologies has brought about a renewed interest in large-scale integral structures for aircraft applications. Applications have been inhibited, however, because of the need to demonstrate damage tolerance, and by cost and manufacturing risks associated with the size and complexity of the parts. The Integral Airframe Structures (IAS) Program identified a feasible integrally stiffened fuselage concept and evaluated performance and manufacturing cost compared to conventional designs. An integral skin/stiffener concept was produced both by plate hog-out and near-net extrusion. Alloys evaluated included 7050-T7451 plate, 7050-T74511 extrusion, 6013-T6511 extrusion, and 7475-T7351 plate. Mechanical properties, structural details, and joint performance were evaluated as well as repair, static compression, and two-bay crack residual strength panels. Crack turning behavior was characterized through panel tests and improved methods for predicting crack turning were developed. Manufacturing cost was evaluated using COSTRAN. A hybrid design, made from high-speed machined extruded frames that are mechanically fastened to high-speed machined plate skin/stringer panels, was identified as the most cost-effective manufacturing solution. Recurring labor and material costs of the hybrid design are up to 61 percent less than the current technology baseline.

Pettit, R. G.↗

Integrated operations/payloads/fleet analysis. Volume 3: System costs. Appendix A: Program direct costs

Individualized program direct costs for each satellite program are presented. This breakdown provides the activity level dependent costs for each satellite program. The activity level dependent costs, or, more simply, program direct costs, are comprised of the total payload costs (as these costs are strictly program dependent) and the direct launch vehicle costs. Only those incremental launch vehicle costs associated directly with the satellite program are considered. For expendable launch vehicles the direct costs include the vehicle investment hardware costs and the launch operations costs. For the reusable STS vehicles the direct costs include only the launch operations, recovery operations, command and control, vehicle maintenance, and propellant support. The costs associated with amortization of reusable vehicle investment, RDT&E range support, etc., are not included.

Source record↗

Searching Across the International Space Station Databases

Data access in the enterprise generally requires us to combine data from different sources and different formats. It is advantageous thus to focus on the intersection of the knowledge across sources and domains; keeping irrelevant knowledge around only serves to make the integration more unwieldy and more complicated than necessary. A context search over multiple domain is proposed in this paper to use context sensitive queries to support disciplined manipulation of domain knowledge resources. The objective of a context search is to provide the capability for interrogating many domain knowledge resources, which are largely semantically disjoint. The search supports formally the tasks of selecting, combining, extending, specializing, and modifying components from a diverse set of domains. This paper demonstrates a new paradigm in composition of information for enterprise applications. In particular, it discusses an approach to achieving data integration across multiple sources, in a manner that does not require heavy investment in database and middleware maintenance. This lean approach to integration leads to cost-effectiveness and scalability of data integration with an underlying schemaless object-relational database management system. This highly scalable, information on demand system framework, called NX-Search, which is an implementation of an information system built on NETMARK. NETMARK is a flexible, high-throughput open database integration framework for managing, storing, and searching unstructured or semi-structured arbitrary XML and HTML used widely at the National Aeronautics Space Administration (NASA) and industry.

Maluf, David A.↗