Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Demonstration and Evaluation of the Human-Technology Integration Guidance for Plant Modernization

The significance of nuclear power in its role producing carbon-free electricity to the U.S. cannot be overstated. However, with changes in the energy market coupled with changes in incentives given to certain resources like solar and wind, the operating and maintenance costs for these sources have seen a significant reduction, which has consequently negatively impacted the economic viability of the existing U.S. nuclear power plant fleet. Digital instrumentation and control (I&C) and control room modernization is a major critical work domain to reduce operating and maintenance costs. Existing nuclear power plants are commonly configured with mostly legacy analog I&C as well as isolated pockets of digital I&C (a plant process computer, digital recorders, etc.). One challenge with this analog I&C is that replacement parts are becoming prohibitively more expensive and difficult to obtain. Moreover, a significant challenge with the existing analog I&C is that the way in which plants are currently operated and maintained is no longer competitive with other electricity generating sources, like natural gas, where advanced digital I&C technologies are commonplace. This gap between the waynuclear power plants are operated compared to other electricity generating sources significantly challenges the economic viability of the nuclear industry. Indeed, digital I&C systems can fundamentally change the way the plant is operated (i.e., the concept of operation). The introduction of digital I&C technologies offers a wealth of benefits to the nuclear industry. However, it is important to emphasize that, to realize these benefits, a careful understanding of how to integrate technology in a collaborative way that leverages the capabilities of people and technologies is necessary. Human-technology integration applies human factors engineering methods and tools to ensure the safe and reliable use of these technologies while ensuring that the inherent features of the technologies that provide economic value are not missed. The scope of this work documents the demonstration of the recently developed human and technology integration methodology, as applied to developing a new vision and concept of operations for a major U.S. nuclear power plant fleet. This report focuses on the methodological aspects of developing a vision and concept of operations. This report shares the tools, activities, and lessons learned during a modernization currently underway for industry as a whole to consider when planning any significant digital modification and developing a new vision and concept of operations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Propulsion Ground Testing with High Test Peroxide: Lessons Learned

Propulsion Ground Testing with High Test Peroxide (85 to 98% concentration) began at the NASA John C. Stennis Space Center in calendar year 1998, when the E3 Test Facility was modified to accomodate hydrogen peroxide (H2O2) in order to suport the research and development testing of the USAF Upper Stage Flight Experiment rocket engine. Since that time, efforts have continued to provide actual and planned test services to various customers, both U.S. Government and Commercial, in the ground test of many test articles, ranging from gas generators, to catalyst beds, to turbomachinery, to main injectors, to combustion chambers, to integrated rocket engines, to integrated stages. Along this path, and over the past 4 years, there has been both the rediscovery of previously learned lessons, through literature search, archive review, and personal interviews, as well as the learning of many new lessons as new areas are explored and new endeavors are tried. This paper will summarize those lessons learned in an effort to broaden the knowledge base as High Test Peroxide is considered more widely for use in rocket propulsion applications.

Bruce, Robert↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Integrating NASA Dryden Research Endeavors into the Teaching-Learning of Mathematics in the K-12 Classroom via the WWW

The primary goal of this project was to continue populating the currently existing web site developed in 1998 in conjunction with the NASA Dryden Flight Research Center and California Polytechnic State University, with more mathematics lesson plans and activities that K-12 teachers, students, home-schoolers, and parents could access. All of the activities, while demonstrating some mathematical topic, also showcase the research endeavors of the NASA Dryden Flight Research Center. The website is located at: http://daniel.calpoly.edu/~dfrc/Robin. The secondary goal of this project was to share the web-based activities with educators at various conferences and workshops. To address the primary goal of this project, over the past year, several new activities were posted on the web site and some of the existing activities were enhanced to contain more video clips, photos, and materials for teachers. To address the project's secondary goal, the web-based activities were showcased at several conferences and workshops. Additionally, in order to measure and assess the outreach impact of the web site, a link to the web site hitbox.com was established in April 2001, which allowed for the collection of traffic statistics against the web site (such as the domains of visitors, the frequency of visitors to this web site, etc.) Provided is a description of some of the newly created activities posted on the web site during the project period of 2001-2002, followed by a description of the conferences and workshops at which some of the web-based activities were showcased. Next is a brief summary of the web site's traffic statistics demonstrating its worldwide educational impact, followed by a listing of some of the awards and accolades the web site has received.

Ward, Robin A.↗

International Space Station Configuration Analysis and Integration

Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.

Anchondo, Rebekah↗

TPSAS-NF1676L-27686-DND

Accurate flight prediction methods are critical for all aspects of vehicle performance, handling characteristics, and structural integrity. The first NASA/Industry/DoD workshop on wind tunnel/flight correlation was held in 1981, when discrepancies arising from Reynolds number effects, aeroelastic effects, and tunnel wall and sting interference effects posed significant barriers to experimentally-based prediction methods in use at that time. Significant advances in ground-based experimental capabilities and facilities, CFD methods, and flight test technology in the next 20 years significantly improved the tools available for predictions. In addition, numerous new production and experimental military and civil aircraft completed flight testing, offering an unprecedented experience base and data for assessing the accuracy of current prediction methods and practices. Thus, the first Flight Prediction Workshop (FPW) was held in 2002. The objective of the 2002 workshop and the current 3 day workshop for technical specialists is to provide a forum for the exchange of: experiences and lessons learned, critical assessments of the state of the art, and recommendations for further developments in flight prediction methodology. Information and opinions provided by the workshop will be incorporated in R&T planning for future government activities in aerodynamics, aeroelasticity, aeroacoustics, propulsion/air frame integration, etc.

Joseph H Morrison↗

Readiness Evaluation for Sustained Operations

Readiness evaluation for sustained operations is a continuous function that progresses from overseeing establishment of five key programmatic elements during design and construction phases to monitoring the output of those elements performing during commissioning and operations. Continuously assessing readiness for sustained operations becomes an important business function for the U.S. Department of Energy’s Office of River Protection as competition for federal funds increases with increasing waste treatment operations throughout the Office of Environmental Management complex. The five key programmatic elements are as follows: Risk management – Risks and opportunities should prioritize continuous improvement initiatives and be informed by the design and technical authorities and stakeholder monitors. Continuous improvement – All levels of the project organization should exhibit commitment to continuous improvement and learning. Continuity of design and technical authorities – The authorities are responsible for managing knowledge for its effective use in the other elements. Stakeholder monitoring – Active and deliberate monitoring of stakeholder relationships. Sustained operations integrated business planning – Integrated business planning in a federal environment competitive for congressional funding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVI-LOCATE: One Stop Solution for Estimating Cost of Installing EV Charging Stations

EVI-LOCATE (Electric Vehicle Infrastructure-Locally Optimized Cost Assessment Tool and Estimator) is a site assessment tool to estimate costs to install EV charging stations. EVI-LOCATE enables users to generate site-specific, user-specific, and location-specific EV charging station installation designs and cost estimates. The tool integrates National Electrical Code, deep-learning pixel classification algorithm, and component-level costs to estimate the costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Space Station Freedom - Design review process

The Space Station Freedom (SSF) design review process is described. The SSF program background is summarized, and the program review management plan and organization are described. The technical approach of the Integrated System Preliminary Design Review (ISPDR) is examined along with the Review Item Discrepancy Tracking System. ISPDR results are summarized and compared with its objectives. Lessons learned for the future support of the management life cycle are addressed.

Koontz, Robert↗

Reengineering legacy software to object-oriented systems

NASA has a legacy of complex software systems that are becoming increasingly expensive to maintain. Reengineering is one approach to modemizing these systems. Object-oriented technology, other modem software engineering principles, and automated tools can be used to reengineer the systems and will help to keep maintenance costs of the modemized systems down. The Software Technology Branch at the NASA/Johnson Space Center has been developing and testing reengineering methods and tools for several years. The Software Technology Branch is currently providing training and consulting support to several large reengineering projects at JSC, including the Reusable Objects Software Environment (ROSE) project, which is reengineering the flight analysis and design system (over 2 million lines of FORTRAN code) into object-oriented C++. Many important lessons have been learned during the past years; one of these is that the design must never be allowed to diverge from the code during maintenance and enhancement. Future work on open, integrated environments to support reengineering is being actively planned.

Pitman, C.↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Impacts and emerging research opportunities in Vehicle-Grid Integration for transportation: A review

This review provides a comprehensive examination of Vehicle-Grid Integration (VGI) technologies and their impacts on transportation systems, with a particular emphasis on the transportation-energy nexus. It systematically explores how VGI affects key transportation applications such as charging infrastructure planning, electric vehicle (EV) routing, smart charging coordination, shared mobility, and dynamic pricing. By synthesizing recent literature from both transportation and energy systems perspectives, this study highlights how advanced methodologies, such as reinforcement learning, game theory, and optimization techniques, are used to model the complex interactions between EVs, mobility patterns, and distributed energy systems. Furthermore, the review also identifies critical challenges, including behavioral factors, data limitations, and system scalability. Drawing on these insights, the paper outlines emerging research opportunities to support the design of integrated, resilient, and user-centric VGI solutions that advance sustainable mobility and energy system efficiency.

Charging coordination↗

Resource Allocation Planning Helper (RALPH): Lessons learned

The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

Durham, Ralph↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Utah FORGE: Optimization of a Plug-and-Perf Stimulation (Fervo Energy)

Information around the plug-and-perf treatment design at Utah FORGE by Fervo Energy. Objective and Purpose: - Develop a multistage hydraulic stimulation approach designed specifically to target the top three factors that control the technical and commercial viability of an EGS system: i) Achieving sufficient injectivity to support high cross-well flow rates ii) Distributing flow evenly across the wellbore and reservoir to maximize heat mining efficiency, ensure sustained heat transfer, and mitigate thermal breakthrough iii) Overcoming the effects of stress heterogeneity, stress shadowing, and variations in natural fracture properties during the stimulation treatment, leading to a more predictable stimulated reservoir volume and offset well placement - The following activities will be performed: i) Design, plan, and execute a multistage plug-and-perf stimulation treatment at a Fervo site with data acquisition and well testing activities aimed at addressing key technical aspects of the issues above ii) Perform data processing and interpretation of field results to translate the results form the Fervo site to a site-specific design at the Utah FORGE site iii) Design, plan, and execute a multistage plug-and-perf stimulation treatment design at the Utah FORGE site Methods and Approach: - Design a detailed data acquisition plan to maximize learning around: i) DFIT testing ii) Petrophysical logging, image logging iii) Permanent DAS/DTS fiber optic monitoring iv) Deep borehole microseismic monitoring v) Shallow borehole induced seismicity monitoring vi) Injection/production testing (RTA analysis, tracer testing) vii) Integrated numerical modeling and production forecasting

15 GEOTHERMAL ENERGY↗

Intelligent manipulation technique for multi-branch robotic systems

New analytical development in kinematics planning is reported. The INtelligent KInematics Planner (INKIP) consists of the kinematics spline theory and the adaptive logic annealing process. Also, a novel framework of robot learning mechanism is introduced. The FUzzy LOgic Self Organized Neural Networks (FULOSONN) integrates fuzzy logic in commands, control, searching, and reasoning, the embedded expert system for nominal robotics knowledge implementation, and the self organized neural networks for the dynamic knowledge evolutionary process. Progress on the mechanical construction of SRA Advanced Robotic System (SRAARS) and the real time robot vision system is also reported. A decision was made to incorporate the Local Area Network (LAN) technology in the overall communication system.

Chen, Alexander Y. K.↗

Lessons Learned in Space Life Support System Testing

The earlier problems can be found and corrected, the easier and cheaper it is to fix them. Doing less testing saves cost and time but doing too little testing increases the risk of operational failures causing large costs and delays. Integrated test is necessary to determine if the subsystems work together and the overall architecture performs as intended. This report reviews the testing lessons learned from the NASA Systems Engineering Handbook, a National Research Council report, and five reviews of International Space Station (ISS) lessons learned. The five reviews all mention two important points. First, that testing should be performed on the final integrated system, one as close as possible to the intended flight system. Second, “test as you fly,” while operating as planned in an environment as close as possible to the expected flight environment. Other lessons are the need for extensive preflight ground testing, the need to establish and defend an adequate budget, the problems using protoflight hardware on ISS, and the benefit of having ISS as a zero gravity test bed. The major ISS life support systems, carbon dioxide, water recycling, and oxygen recovery, were protoflight systems with little testing before launch to ISS. The failure rates these systems have been much greater than predicted and this has caused dissatisfaction with the protoflight approach. The more costly traditional approach is building qualification and test units in addition to flight units. The test units are used to test, analyze, and fix failure modes. Other work shows that there is an optimum cost-effective intuitive appeal of a human ecosystem in space.

Life support↗