Flood Estimation under Snowmelt and Rain-on-Snow Processes in Alaska: A Military Installation Perspective

Accurate flood estimation in snow-dominated and high-latitude regions remains challenging due to complex interactions among rainfall, snowmelt, and rain-on-snow (ROS) processes, which are not captured in conventional precipitation-based intensity-duration-frequency (PREC-IDF) curves. This study evaluates the Next-Generation IDF (NG-IDF) framework, an extension of PREC-IDF that incorporates total water available for runoff (precipitation minus changes in snow water equivalent), in two contrasting Alaskan watersheds of Department of Defense (DoD) significance: the Little Chena River Basin (LCRB) in interior Alaska, a tributary of the Chena River that flows through Fort Wainwright and near Eielson Air Force Base, and the Upper Ship Creek Basin (USCB), which drains Joint Base Elmendorf-Richardson near Anchorage. Using long-term SNOTEL observations and event-based rainfall-runoff modeling, NG-IDF and PREC-IDF flood estimates were compared against observation-based flood frequency analyses. Results show that NG-IDF consistently reduces flood-estimation bias by 15–20% relative to PREC-IDF, particularly for snowmelt- and ROS-dominated events. In the interior LCRB, permafrost conditions can substantially amplify flood responses during snowmelt events, an effect not explicitly represented in standard design tools. These findings demonstrate that NG-IDF provides a more physically consistent and transferable framework for flood estimation in cold regions, with potential relevance to mission-critical DoD installation resilience. Projected increases in ROS frequency and permafrost degradation across Alaska further emphasize the need to integrate physics-based hydrologic models that explicitly represent snow and permafrost processes to enhance design resilience and operational readiness for military and other critical infrastructure.

Yan, Hongxiang (ORCID:000000022387403X)↗

Genetic identification of avian samples recovered from solar energy installations

Renewable energy production and development will drastically affect how we meet global energy demands, while simultaneously reducing the impact of climate change. Although the possible effects of renewable energy production (mainly from solar- and wind-energy facilities) on wildlife have been explored, knowledge gaps still exist, and collecting data from wildlife remains (when negative interactions occur) at energy installations can act as a first step regarding the study of species and communities interacting with facilities. In the case of avian species, samples can be collected relatively easily (as compared to other sampling methods), but may only be able to be identified when morphological characteristics are diagnostic for a species. Therefore, many samples that appear as partial remains, or “feather spots”—known to be of avian origin but not readily assignable to species via morphology—may remain unidentified, reducing the efficiency of sample collection and the accuracy of patterns observed. To obtain data from these samples and ensure their identification and inclusion in subsequent analyses, we applied, for the first time, a DNA barcoding approach that uses mitochondrial genetic data to identify unknown avian samples collected at solar facilities to species. We also verified and compared identifications obtained by our genetic method to traditional morphological identifications using a blind test, and discuss discrepancies observed. Our results suggest that this genetic tool can be used to verify, correct, and supplement identifications made in the field and can produce data that allow accurate comparisons of avian interactions across facilities, locations, or technology types. We recommend implementing this genetic approach to ensure that unknown samples collected are efficiently identified and contribute to a better understanding of wildlife impacts at renewable energy projects.

14 SOLAR ENERGY↗

Standardization of ancillary installation tooling for SRF cavities at Fermilab

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To minimize the number of tooling sets created, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Narug, C. [Fermilab]↗

The Installation of Direct Water-Cooling Systems to Reduce Cooling Energy Requirements for High-Performance Computing Centers

A large cluster of High-Performance Computing (HPC) equipment at the Lawrence Livermore National Laboratory in California was retrofitted with an Asetek cooling system. The Asetek system is a hybrid scheme with water-cooled cold plates on high-heat-producing components in the information technology (IT) equipment, and with the remainder of the heat being removed by conventional air-cooling systems. In order to determine energy savings of the Asetek system, data were gathered and analyzed two ways: using top-down statistical models, and bottom-up engineering models. The cluster, “Cabernet”, rejected its heat into a facilities cooling water loop which in turn rejected the heat into the same chilled water system serving the computer-room air handlers (CRAHs) that provided the air-based cooling for the room. Because the “before” and “after” cases both reject their heat into the chilled water system, the only savings is due to reduction in CRAH fan power. The top-down analysis showed a 4% overall energy savings for the data center (power usage effectiveness (PUE) —the ratio of total data center energy to IT energy— dropped from 1.60 to 1.53, lower is better); the bottom-up analysis showed a 3% overall energy savings (PUE from 1.70 to 1.66) and an 11% savings for the Cabernet system by itself (partial PUE of 1.51). Greater savings, on the order of 15-20%, would be possible if the chilled water system was not used for rejecting the heat from the Asetek system. About 37% of the heat from the Cab system was rejected to the cooling water, lower than at other installations.

Earni, Shankar↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Installation of Ramps and Utility Cabinet at TA-18-1 Slotin Building (Historic Building Report No. 395)

The information below is presented in response to requests for additional information that resulted from a phone conference on November 12, 2020 between Harvey Kaplan of the New Mexico State Historic Preservation Office, DOE NNSA Los Alamos Field Office Manhattan Project National Historical Park Representative, Vicki Loucks, LANL Program Manager for Manhattan Project National Historical Park, Cheryl Abeyta, and LANL Historic Buildings Program Staff, Jeremy Brunette and J.T. Stark. The DOE NNSA Field Office (Field Office) initiated the call to propose additional work be performed to a previously reviewed project, “Restoration of TA-18-0001 (Slotin Building)” (LA-UR-19-26609) (HPD Log # 111110). Of the six actions discussed on the call, which included (1) exterior paint color, (2) entrance ramps, (3) non-period metal siding removal, (4) interior floor finish, (5) reopening secondary entrance door, and (6) addition of utility cabinet with period doors, additional information for two of the actions was requested for further review. The two actions, the construction of entrance ramps and installation of a utility cabinet are addressed in detail.

42 ENGINEERING↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

SRNL EPC Installation Report

During the week of August 25th, 2021, three Electric Phenomenon Cluster (EPC) sensors were installed at the Savannah River Site (SRS) owned, Dominion Energy (DE) operated 504-2G substation.

47 OTHER INSTRUMENTATION↗

Full-Scale Hydrogen Mitigation Installation and Testing at Nevada Solar One

This project was performed under a Cooperative Research & Development Agreement (CRADA) between the National Renewable Energy Laboratory (NREL) and Acciona Energy USA (AE). The purpose was to advance an NREL TRL 3 technology that was developed during the previous CRADA from completed laboratory testing to full-scale process installation and testing at AE's Nevada Solar One (NSO) power plant. The project's objective was to complete full-scale implementation and performance verification of the NREL hydrogen mitigation technology at the Nevada Solar One (NSO) power plant in Boulder City, Nevada.

08 HYDROGEN↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Storage Units Installation Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction in lower Sandia Canyon at Technical Area (TA) 72 at the Outdoor Live Fire Range facility at Los Alamos National Laboratory (LANL). The proposed project is intended to provide storage for firing range supplies and consumables. The project activities within the 100-year floodplain include installation of at least seven prefabricated metal transportainer type storage units located at one of four locations (Figure 1).

54 ENVIRONMENTAL SCIENCES↗

AUP first Pre-series Cold Mass Installation into the Cryostat

For the Hi-Lumi LHC Upgrade (HL-LHC) new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP) ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested and delivered to CERN. The first of the LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during the fall of 2022 and spring 2023. We will present the integration work of the Cold Mass assembly into the Cryostat Kit provided by CERN. Each Cold Mass contains two trained MQXFA magnets of ~ 5 m length installed in a stainless-steel helium pressure vessel. The Cold Mass will be surrounded by cryostat shields, piping, and vacuum vessel. We will discuss the metrology survey results and present the LQXFA measurements prior testing at the Fermilab Magnet Test facility and lessons learned.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Iodine Air Sampling: Installation and Preliminary Results

The F-Area wetlands are a known sink for radioiodine generated at the Savannah River Site (SRS). Wastewater containing iodine-129 ( 129 I) was discharged into the F-Area Seepage Basins for disposal, but the acidity of the wastewater mobilized some of the contaminants from the basin soil through the vadose zone and into the groundwater; ultimately creating a groundwater plume that extends towards Fourmile Branch and its associated wetland areas. Dissolved radioiodine specifically has migrated to the nearby F-Area wetlands, where it persists as a contaminant of concern. Accumulation and resurfacing of 129 I in the wetlands and nearby areas creates a potential secondary source zone where changes in biogeochemical conditions could result in the release of this sequestered 129 I to the air. Monitoring data has indicated that 129 I has a seasonal behavior at several surface water stations, with high concentrations during summertime and low concentrations during wintertime. Still, it is not known which factors control the seasonal behavior of 129 I. Further, it has been reported that 129 I contributed approximately 23% to the 2019 SRS offsite air pathway dose to the representative person for that year (SRNS, 2020), but air measurements of 129 I have never been taken in the F-Area wetlands. Because air emissions of 129 I from the wetlands have never been investigated, it is not known if this could be a potential release pathway that needs to be included in the site conceptual model. To address these unknowns, the Savannah River National Laboratory (SRNL) has an applied research task to investigate whether 129 I in the wetlands is emitted to the air and, if so, whether air concentrations exhibit seasonal variation. This report presents information about the system recently installed in the F-Area wetlands for measuring 129 I, as well as analysis results for samples collected June through August 2023. Quantification of this constituent will provide a better understanding of the contribution of airborne 129 I from the F-Area wetlands to the offsite dose and better inform ongoing and future remedial actions.

54 ENVIRONMENTAL SCIENCES↗

Standardization of Ancillary Installation Tooling for SRF Cavities at Fermilab

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To try and minimize the amount of tooling sets used, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Narug, Colin↗

Journey Mapping Distributed Wind Deployment: Installer Perspectives

This work uses journey maps to assess the deployment of distributed wind technologies through the perspective of installers. Journey mapping is a human-centered design method that chronologically traces processes from the perspective of those who participate in them. The journey map will be leveraged to identify deployment pain points (i.e., manifestations of generic deployment barriers) that the Strategize, Engage, Network and Deploy (SEND) Distributed Wind project team will seek to address in future work.

17 WIND ENERGY↗

Advanced Diagnosis and Accelerated Testing of Balance of System Components for Utility Scale PV Installations: October 1, 2022-September 30, 2024

A study of the durability of PV Balance of System components was performed. Specifically, wire cable jackets and cable connectors were examined within the direct current (DC) PV Power Transmission Chain (PTC). Degraded and failed samples have been obtained from utility PV installations to provide feedback on the degradation modes and the related damage-enabling considerations in today's PV systems. An industry interface group (including system owners, system inspectors, component manufacturers, and test labs) was used to help identify and obtain field-failed samples, for feedback (including samples and experimental design), and to facilitate the subsequent dissemination of the results of this study. Samples were empirically studied using accelerated stress testing with steady-state conditions (cable jackets) in addition to combined-accelerated stress testing (cable jackets, connectors and uncapped connectors). Steady-state accelerated testing has been performed using at least one applied stressor (e.g. UV light) to aid understanding of jacket durability relative to its application. Component- and material-focused failure analysis was conducted to develop an understanding and advise the PV industry. In-depth characterization will be applied selectively to field- and artificially aged-samples, to gain scientific understanding of the structural, chemical, electrical, mechanical, and thermal properties enabling degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗