Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “implementation decisions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A Systematic Approach to Developing Paths Towards Airborne Vehicle Autonomy

Advanced Air Mobility (AAM) demands greater levels of aircraft autonomy than are currently implemented today. To enable this requirement, novel aircraft functionalities and technologies as well as supporting airworthiness and operational regulations are required. A structured method to derive a comprehensive list of aircraft level decision-making functions is defined and applied. The resulting function set is programmed into an ontology, and enables autonomous decision-making through the application of a defined decision-making process. Paths to implementing the functions are generated by applying a structured four step method. By surveying current technologies, airspace, procedures and regulations, the paths generation method defines incremental paths to autonomy that the current regulatory environment can support. Opportunities to implement novel technologies and functions are identified, and regulatory mechanisms supporting their implementation are underscored. The analysis provides the tools to further define aircraft functions and paths to their implementation, while demonstrating that for particular use cases, aircraft autonomy is attainable in the medium-term.

Paul Vajda↗

Integrated Modeling and Simulation Verification, Validation, and Accreditation Strategy for Exploration Systems Mission Directorate

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations and provide critical information and data supporting key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision-making. Their usage requires the implementation of a rigorous approach to verification, validation and accreditation (W&A) and establishment of formal process and practices associated with their application. To ensure decision-making is suitably supported by information (data, models, test beds) from activities (studies, exercises) from M&S applications that are understood and characterized, ESMD is establishing formal, tailored W&A processes and practices. In addition, to ensure the successful application of M&S within ESMD, a formal process for the certification of analysts that use M&S is being implemented. This presentation will highlight NASA's Exploration Systems Mission Directorate (ESMD) management approach for M&S W&A to ensure decision-makers receive timely information on the model's fidelity, credibility, and quality.

Hale, Joseph P.↗

External Dependencies-Driven Architecture Discovery and Analysis of Implemented Systems

A method for architecture discovery and analysis of implemented systems (AIS) is disclosed. The premise of the method is that architecture decisions are inspired and influenced by the external entities that the software system makes use of. Examples of such external entities are COTS components, frameworks, and ultimately even the programming language itself and its libraries. Traces of these architecture decisions can thus be found in the implemented software and is manifested in the way software systems use such external entities. While this fact is often ignored in contemporary reverse engineering methods, the AIS method actively leverages and makes use of the dependencies to external entities as a starting point for the architecture discovery. The AIS method is demonstrated using the NASA's Space Network Access System (SNAS). The results show that, with abundant evidence, the method offers reusable and repeatable guidelines for discovering the architecture and locating potential risks (e.g. low testability, decreased performance) that are hidden deep in the implementation. The analysis is conducted by using external dependencies to identify, classify and review a minimal set of key source code files. Given the benefits of analyzing external dependencies as a way to discover architectures, it is argued that external dependencies deserve to be treated as first-class citizens during reverse engineering. The current structure of a knowledge base of external entities and analysis questions with strategies for getting answers is also discussed.

Ganesan, Dharmalingam↗

Interactive Management and Updating of Spatial Data Bases

The decision making process, whether for power plant siting, load forecasting or energy resource planning, invariably involves a blend of analytical methods and judgement. Management decisions can be improved by the implementation of techniques which permit an increased comprehension of results from analytical models. Even where analytical procedures are not required, decisions can be aided by improving the methods used to examine spatially and temporally variant data. How the use of computer aided planning (CAP) programs and the selection of a predominant data structure, can improve the decision making process is discussed.

French, P.↗

Internal NASA Study: NASAs Protoflight Research Initiative

The NASA Protoflight Research Initiative is an internal NASA study conducted within the Office of the Chief Engineer to better understand the use of Protoflight within NASA. Extensive literature reviews and interviews with key NASA members with experience in both robotic and human spaceflight missions has resulted in three main conclusions and two observations. The first conclusion is that NASA's Protoflight method is not considered to be "prescriptive." The current policies and guidance allows each Program/Project to tailor the Protoflight approach to better meet their needs, goals and objectives. Second, Risk Management plays a key role in implementation of the Protoflight approach. Any deviations from full qualification will be based on the level of acceptable risk with guidance found in NPR 8705.4. Finally, over the past decade (2004 - 2014) only 6% of NASA's Protoflight missions and 6% of NASA's Full qualification missions experienced a publicly disclosed mission failure. In other words, the data indicates that the Protoflight approach, in and of it itself, does not increase the mission risk of in-flight failure. The first observation is that it would be beneficial to document the decision making process on the implementation and use of Protoflight. The second observation is that If a Project/Program chooses to use the Protoflight approach with relevant heritage, it is extremely important that the Program/Project Manager ensures that the current project's requirements falls within the heritage design, component, instrument and/or subsystem's requirements for both the planned and operational use, and that the documentation of the relevant heritage is comprehensive, sufficient and the decision well documented. To further benefit/inform this study, a recommendation to perform a deep dive into 30 missions with accessible data on their testing/verification methodology and decision process to research the differences between Protoflight and Full Qualification missions' Design Requirements and Verification & Validation (V&V) (without any impact or special request directly to the project).

Protoflight↗

GCS plan for software aspects of certification

As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

Shagnea, Anita M.↗

Verification of the Solar Dynamics Observatory High Gain Antenna Pointing Algorithm Using Flight Data

The Solar Dynamics Observatory (SDO), launched in 2010, is a NASA-designed spacecraft built to study the Sun. SDO has tight pointing requirements and instruments that are sensitive to spacecraft jitter. Two High Gain Antennas (HGAs) are used to continuously send science data to a dedicated ground station. Preflight analysis showed that jitter resulting from motion of the HGAs was a cause for concern. Three jitter mitigation techniques were developed and implemented to overcome effects of jitter from different sources. These mitigation techniques include: the random step delay, stagger stepping, and the No Step Request (NSR). During the commissioning phase of the mission, a jitter test was performed onboard the spacecraft, in which various sources of jitter were examined to determine their level of effect on the instruments. During the HGA portion of the test, the jitter amplitudes from the single step of a gimbal were examined, as well as the amplitudes due to the execution of various gimbal rates. The jitter levels were compared with the gimbal jitter allocations for each instrument. The decision was made to consider implementing two of the jitter mitigating techniques on board the spacecraft: stagger stepping and the NSR. Flight data with and without jitter mitigation enabled was examined, and it is shown in this paper that HGA tracking is not negatively impacted with the addition of the jitter mitigation techniques. Additionally, the individual gimbal steps were examined, and it was confirmed that the stagger stepping and NSRs worked as designed. An Image Quality Test was performed to determine the amount of cumulative jitter from the reaction wheels, HGAs, and instruments during various combinations of typical operations. The HGA-induced jitter on the instruments is well within the jitter requirement when the stagger step and NSR mitigation options are enabled.

Bourkland, Kristin L.↗

Safety Goals at NASA: How Safe is Safe Enough and How to Get There

NASA is developing and implementing safety improvements in all its activities including mission design, mission operations, and occupational safety. Decisions regarding where and how improvements are implemented to optimally enhance safety are discussed.

Stamatelatos, Michael↗

Data representations in PDP-10 MacLISP

The internal representations of the various MacLISP data types are presented and discussed. Certain implementation tradeoffs are considered. The ultimate decisions on these tradeoffs are discussed in the light of MacLISP's prime objective of being an efficient high-level language for the implementation of large systems such as MACSYMA. The basic strategy of garbage collection is outlined, with reference to the specific representations involved. Certain clever tricks are explained and justified. The address space crunch is explained and some alternative solutions explored.

Steele, G. L., Jr.↗

Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

Source record↗

Sensor fusion II: Human and machine strategies; Proceedings of the Meeting, Philadelphia, PA, Nov. 6-9, 1989

Various papers on human and machine strategies in sensor fusion are presented. The general topics addressed include: active vision, measurement and analysis of visual motion, decision models for sensor fusion, implementation of sensor fusion algorithms, applying sensor fusion to image analysis, perceptual modules and their fusion, perceptual organization and object recognition, planning and the integration of high-level knowledge with perception, using prior knowledge and context in sensor fusion.

Schenker, Paul S.↗

The software analysis project for the Office of Human Resources

There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil service employee with several years until retirement. The employee enters current salary and savings information as well as goals concerning salary at retirement, assumptions on inflation, and the return on investments. The program produces a picture of the employee's retirement income from all sources based on the assumptions entered. A session showing features of the program was conducted for key personnel at the Center. After analysis, it was decided to offer the program through the Learning Center starting in August 1994.

Tureman, Robert L., Jr.↗

Computational Approaches to Interface Design

Tools which make use of computational processes - mathematical, algorithmic and/or knowledge-based - to perform portions of the design, evaluation and/or construction of interfaces have become increasingly available and powerful. Nevertheless, there is little agreement as to the appropriate role for a computational tool to play in the interface design process. Current tools fall into broad classes depending on which portions, and how much, of the design process they automate. The purpose of this panel is to review and generalize about computational approaches developed to date, discuss the tasks which for which they are suited, and suggest methods to enhance their utility and acceptance. Panel participants represent a wide diversity of application domains and methodologies. This should provide for lively discussion about implementation approaches, accuracy of design decisions, acceptability of representational tradeoffs and the optimal role for a computational tool to play in the interface design process.

Corker↗

The Utility of the OMI HCHO/NO2 in Air Quality Decision-Making Activities

I will discuss a novel and practical application of the OMI HCHU and NO2 data products to the "weight of evidence" in the air quality decision-making process (e.g., State Implementation Plan (SIP)) for a city, region, or state to demonstrate that it is making progress toward attainment of the National Ambient Air Quality Standard (NAAQS) for ozone. Any trend, or lack thereof, in the observed OMI HCHO/NO2 may support that an emission control strategy implemented to reduce ozone is or is not occurring for a metropolitan area. In addition, the observed OMI HCHO/NO2 may be used to define new emission control strategies as the photochemical environments of urban areas evolve over time. I will demonstrate the utility of the OMI HCHO/NO2 over the U.S. for air quality applications with support from simulations with both a regional model and a photochemical box model. These results support mission planning of an OMI-like instrument for the proposed GEO-CAPE satellite that has as one of its objectives to study air quality from space. However, I'm attending the meeting as the Aura Deputy Project Scientist, so I don't technically need to present anything to justify the travel.

Duncan, Bryan↗

The Utility of the OMI HCHO and NO2 Data Products in Air Quality Decision- Making Activities

We will present three related air quality applications of the OMI HCHO (formaldehyde) and NO2 (nitrogen dioxide) data products, which we us to support mission planning of an OMI-like instrument for the proposed GEO-CAPE satellite that has as one of its objectives to study air quality from space. First, we will discuss a novel and practical application of the data products to the "weight of evidence" in the air quality decision-making process (e.g., State Implementation Plan (SIP)) for a city, region, or state to demonstrate that it is making progress toward attainment of the National Ambient Air Quality Standard (NAAQS) for ozone. Any trend, or lack thereof, in the observed OMI HCHO/NO2, which we use as an air quality indicator, may support that an emission control strategy implemented to reduce ozone is or is not occurring for a metropolitan area. Second, we will discuss how we use variations in the OMI HCHO product as a proxy for variability in the biogenic hydrocarbon, isoprene, which is an important player for the formation of high levels of ozone and the dominant source of HCHO in the eastern U.S. Third, we will discuss the variability of NO2 in the U.S. as indicated by the OMI NO2 product. In addition, we will show the impact of the 2005 hurricanes on pollutant emissions, including those associated with the intensive oil extraction and refining activities, in the Gulf of Mexico region using the OMI NO2 product. The variability of HCHO and NO2 as indicated by OMI helps us to understand changes in the OMI HCHO/NO2 and the implications for ozone formation.

Duncan, Bryan N.↗

Verification of the Solar Dynamics Observatory High Gain Antenna Pointing Algorithm Using Flight Data

The Solar Dynamics Observatory (SDO) is a NASA spacecraft designed to study the Sun. It was launched on February 11, 2010 into a geosynchronous orbit, and uses a suite of attitude sensors and actuators to finely point the spacecraft at the Sun. SDO has three science instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). SDO uses two High Gain Antennas (HGAs) to send science data to a dedicated ground station in White Sands, New Mexico. In order to meet the science data capture budget, the HGAs must be able to transmit data to the ground for a very large percentage of the time. Each HGA is a dual-axis antenna driven by stepper motors. Both antennas transmit data at all times, but only a single antenna is required in order to meet the transmission rate requirement. For portions of the year, one antenna or the other has an unobstructed view of the White Sands ground station. During other periods, however, the view from both antennas to the Earth is blocked for different portions of the day. During these times of blockage, the two HGAs take turns pointing to White Sands, with the other antenna pointing out to space. The HGAs handover White Sands transmission responsibilities to the unblocked antenna. There are two handover seasons per year, each lasting about 72 days, where the antennas hand off control every twelve hours. The non-tracking antenna slews back to the ground station by following a ground commanded trajectory and arrives approximately 5 minutes before the formerly tracking antenna slews away to point out into space. The SDO Attitude Control System (ACS) runs at 5 Hz, and the HGA Gimbal Control Electronics (GCE) run at 200 Hz. There are 40 opportunities for the gimbals to step each ACS cycle, with a hardware limitation of no more than one step every three GCE cycles. The ACS calculates the desired gimbal motion for tracking the ground station or for slewing, and sends the command to the GCE at 5 Hz. This command contains the number of gimbals steps for that ACS cycle, the direction of motion, the spacing of the steps, and the delay before taking the first step. The AIA and HMI instruments are sensitive to spacecraft jitter. Pre-flight analysis showed that jitter from the motion of the HGAs was a cause of concern. Three jitter mitigation techniques were developed to overcome the effects of jitter from different sources. The first method is the random step delay, which avoids gimbal steps hitting a cadence on a jitter-critical mode by pseudo-randomly delaying the first gimbal step in an ACS cycle. The second method of jitter mitigation is stagger stepping, which forbids the two antennas from taking steps during the same ACS cycle in order to avoid constructively adding jitter from two antennas. The third method is the inclusion of an instrument No Step Request (NSR), which allows the instruments to request a stoppage in gimbal stepping during the times when they are taking images. During the commissioning phase of the mission, a jitter test was performed onboard the spacecraft. Various sources of jitter, such as the reaction wheels, the High Gain Antenna motors, and the motion of the instrument filter wheels, were examined to determine the level of their effect on the instruments. During the HGA portion of the test, the jitter amplitudes from the single step of a gimbal were examined, as well as the amplitudes due to the execution of various gimbal rates. These jitter levels are compared with the gimbal jitter allocations for each instrument. Additionally, the jitter test provided insight into a readback delay that exists with the GCE. Pre-flight analysis suggested that gimbal steps scheduled to occur during the later portion of an ACS cycle would not be read during that cycle, resulting in a delay in the telemetered current gimbal position. Flight data from the jitter test confirmed this expectation. Analysis is presentehat shows the readback delay does not have a negative impact on gimbal control. The decision was made to consider implementing two of the jitter mitigation techniques on board the spacecraft: stagger stepping and the NSR. Flight data from two sets of handovers, one set without jitter mitigation and the other with mitigation enabled, were examined. The trajectory of the predicted handover was compared with the measured trajectory for the two cases, showing that tracking was not negatively impacted with the addition of the jitter mitigation techniques. Additionally, the individual gimbal steps were examined, and it was confirmed that the stagger stepping and NSRs worked as designed. An Image Quality Test was performed to determine the amount of cumulative jitter from the reaction wheels, HGAs, and instruments during various combinations of typical operations. In this paper, the flight results are examined from a test where the HGAs are following the path of a nominal handover with stagger stepping on and HMI NSRs enabled. In this case, the reaction wheels are moving at low speed and the instruments are taking pictures in their standard sequence. The flight data shows the level of jitter that the instruments see when their shutters are open. The HGA-induced jitter is well within the jitter requirement when the stagger step and NSR mitigation options are enabled. The SDO HGA pointing algorithm was designed to achieve nominal antenna pointing at the ground station, perform slews during handover season, and provide three HGA-induced jitter mitigation options without compromising pointing objectives. During the commissioning phase, flight data sets were collected to verify the HGA pointing algorithm and demonstrate its jitter mitigation capabilities.

Bourkland, Kristin L.↗

Preliminary Error Budget for the Reflected Solar Instrument for the Climate Absolute Radiance and Refractivity Observatory

The Climate Absolute Radiance and Refractivity Observatory (CLARREO) plans to observe climate change trends over decadal time scales to determine the accuracy of climate projections. The project relies on spaceborne earth observations of SI-traceable variables sensitive to key decadal change parameters. The mission includes a reflected solar instrument retrieving at-sensor reflectance over the 320 to 2300 nm spectral range with 500-m spatial resolution and 100-km swath. Reflectance is obtained from the ratio of measurements of the earth s surface to those while viewing the sun relying on a calibration approach that retrieves reflectance with uncertainties less than 0.3%. The calibration is predicated on heritage hardware, reduction of sensor complexity, adherence to detector-based calibration standards, and an ability to simulate in the laboratory on-orbit sources in both size and brightness to provide the basis of a transfer to orbit of the laboratory calibration including a link to absolute solar irradiance measurements. The Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission addresses the need to observe high-accuracy, long-term climate change trends and to use decadal change observations as the most critical method to determine the accuracy of climate change projections such as those in the IPCC Report. A rigorously known accuracy of both decadal change observations as well as climate projections is critical in order to enable sound policy decisions. The CLARREO Project will implement a spaceborne earth observation mission designed to provide rigorous SI traceable observations (i.e., radiance, reflectance, and refractivity) that are sensitive to a wide range of key decadal change variables, including: 1) Surface temperature and atmospheric temperature profile 2) Atmospheric water vapor profile 3) Far infrared water vapor greenhouse 4) Aerosol properties and anthropogenic aerosol direct radiative forcing 5) Total and spectral solar irradiance 6) Broadband reflected and emitted radiative fluxes 7) Cloud properties 8) Surface albedo There are two methods the CLARREO mission will rely on to achieve these critical decadal change benchmarks: direct and reference inter-calibration. A quantitative analysis of the strengths and weaknesses of the two methods has led to the recommended CLARREO mission approach. The project consists of two satellites launched into 90-degree, precessing orbits separated by 90 degrees. The instrument suite receiver on each spacecraft includes one emitted infrared spectrometer, two reflected solar spectrometers: dividing the spectrum from ultraviolet through near infrared, and one global navigation receiver for radio occultation. The measurements will be acquired for a period of three years minimum, with a five-year lifetime goal, enabling follow-on missions to extend the climate record over the decades needed to understand climate change. The current work concentrates on the reflected solar instrument giving an overview of its design and calibration approach. The calibration description includes the approach to achieving an SI-traceable system on orbit. The calibration overview is followed by a preliminary error budget based on techniques currently in place at the National Institute of Standards and Technology (NIST).

Thome, Kurtis↗

Decentralized and Asynchronous Planning for Cooperative Practices in High Altitude Digitally Enabled Operations

Cooperative practices will likely be foundational to future digitally enabled airspace operations characterized by decentralized and asynchronous decision-making. This paper explores the implementation of cooperative practices in high-altitude airspace. The digitally enabled operations framework, under exploratory investigation by NASA as a potential new operating mode, which is enabled and dependent on digital technologies and information sharing, may create new operational possibilities for a wide range of vehicle types and missions. An essential element of the operating mode framework under investigation, cooperative practices, could empower operators to manage critical functions such as deconfliction, equitable airspace usage, and demand-capacity balancing. The use of cooperative practices would involve asynchronous flight information sharing and decentralized conflict management by operators, representing a major change from traditional air traffic services that use synchronous surveillance information to support centralized decision-making by air traffic controllers. This paper details three key components for implementing cooperative practices for decentralized, digitally enabled operations: (a) intent modeling and sharing, (b) conflict detection, and (c) cooperative deconfliction.

cooperative operating practics↗