Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower plants”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Optimal Complementarity Analysis of Potential Floating Solar Co-Located With Existing Hydropower Assets Across the Contiguous United States

The U.S. is expected to double its rate of renewable capacity from 2024 to 2030. However, the stochastic nature of renewable energy poses challenges to the operation and reliability of our power grid. The combined generation from renewable energy sources, with dispatchable sources (such as hydropower) operating as a hybrid energy plant, could mitigate this variability. In this paper, the complementarity analysis of selected U.S. reservoirs with existing hydropower assets (EHAs) and potential floating photovoltaics (FPVs) is conducted for the continuous U.S. (CONUS). The optimal FPV capacity for each site is determined by minimizing the variability of the combined output, while adhering to the FPV potential. Our results indicate that over 50% of the analyzed reservoirs achieve a stability coefficient exceeding 0.5, leading to a less-variable output after optimization. Finally, we analyze the complementary hydro-FPV hybrid reservoirs by considering both the Pearson correlation coefficient and the stability coefficient on daily, monthly, and yearly scales. Summaries are included of locations of theoretical FPVs co-located with hydropower plants that exhibit high complementarity based on the selected metrics.

13 - HYDRO ENERGY↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Dynamic Frequency Regulation Improvement in Hydropower-Hybrid System using Variational Mode Decomposition

Providing frequency response, especially fast frequency response such as Red D in the Pennsylvania-New Jersey-Maryland Interconnection (PJM) market, is challenging for many generation plants to deliver on their own. If they have adequate flexibility, hydropower plants are typically able to provide slower regulation support (e.g., Reg A in PJM), but do not respond fast enough to provide Reg D. The ability to provide Reg D would improve their revenue because this service is typically more valuable. This work presents a control approach to use hydropower, battery, and ultracapacitor systems to provide fast regulation in a way that uses the response contribution of each asset. In particular, the proposed control architecture applies a variational mode decomposition (VMD) technique on the incoming Reg D signal to extract multiple dynamic-regulation components with non-overlapping frequencies. With the response-speed dependent alignment, these regulation components are fed to the hydrogenator and hybrid energy storage system (HESS). The paper evaluates the proposed approach on a direct-current (DC)-coupled active system by computing several performance measures and analyzing sensitivity based on HESS component proportional capacities. The results reveal that the proposed VMD-based signal conditioning performs well and that optimizing the sizing of the battery and ultracapacitor components further enhances performance.

13 HYDRO ENERGY↗

Fish Friendly Water Rules' Impact On the Power Grid with High VRE Levels

Columbia River basin multipurpose reservoirs are operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. When conventional thermal power plants are retired, hydropower flexibility balances the wind and solar variability of the power grid and provides grid services to maximize the high renewable power absorption. On the other hand, over-reliance on hydropower could harm the river basin fish habitat. For example, water release pulses during peak electricity demand hours and shorter-term water release variation could harm the fish population. Power grid planners, environmentalists, Columbia Basin tribes, hydro regulators, and water resource planners work together to understand the impacts of Columbia River basin operation in a fish-friendly way in the current power grid and power grid with higher renewable power share. We examine different levels of renewable share in the Western Interconnection to understand the multiple weather years and future climate projection and operating scenario impact on the power grid and water system. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

environmental↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

Addressing Critical Challenges of Coal Mines for Underground Pumped Storage Hydropower Using Numerical Calculations

Using existing coal mines to build underground pumped storage hydropower (UPSH) power plants could help reduce the costs associated with starting a new PSH operation. This innovative approach can leverage the existing infrastructure of coal mine facilities available in many regions of the United States. However, technical challenges associated with water quality, mineral chemistry and integrity of subsurface topologies have thus far prevented any of these facilities from going online. Rye Development is investigating the feasibility of UPSH at existing coal mine facilities. In this project, Rye Development received the technical assistance from Oak Ridge National Laboratory to investigate the impacts of minerals, metal particles, and chemical substances in water flow on hydraulic equipment and assess the overall structural integrity of hydraulic equipment in former coal mines.

13 HYDRO ENERGY↗

Probabilistic Hydropower Flexibility Valuation: Case Studies for Boating Flow Regime

The optimal scheduling of hydropower generation holds significant importance to power system operation. The unique requirements of environmental constraints and the power system, depending on their respective objectives, demand distinct flow patterns. While power system stakeholders strive to optimize revenue in electricity markets, stakeholders from boating recreation seeks to identify flow ranges that optimize the boating experience. In pursuit of a win-win solution, this study aims to reconcile the interests of various stakeholders in hydropower scheduling. The maximum revenue from day-ahead electricity market is explored through an optimization process considering both plant operation constraints, boating flow constraints, water availability, and market prices. Results of real world case studies at a river in California show that the proposed approach can achieve dual objectives: maximizing market revenue while addressing boating recreation necessities. In addition, as the accuracy of electricity price forecasting and flow forecasting increase, the optimal revenue becomes increasingly advantageous to hydropower plant operators.

13 HYDRO ENERGY↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗