Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “high-efficiency modules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Grid-Competitive Residential and Commercial Fully Automated PV Systems Technology: Final technical Report, August 2011

Under DOE's Technology Pathway Partnership program, SunPower Corporation developed turn-key, high-efficiency residential and commercial systems that are cost effective. Key program objectives include a reduction in LCOE values to 9-12 cents/kWh and 13-18 cents/kWh respectively for the commercial and residential markets. Target LCOE values for the commercial ground, commercial roof, and residential markets are 10, 11, and 13 cents/kWh. For this effort, SunPower collaborated with a variety of suppliers and partners to complete the tasks below. Subcontractors included: Solaicx, SiGen, Ribbon Technology, Dow Corning, Xantrex, Tigo Energy, and Solar Bridge. SunPower's TPP addressed nearly the complete PV value chain: from ingot growth through system deployment. Throughout the award period of performance, SunPower has made progress toward achieving these reduced costs through the development of 20%+ efficient modules, increased cell efficiency through the understanding of loss mechanisms and improved manufacturing technologies, novel module development, automated design tools and techniques, and reduced system development and installation time. Based on an LCOE assessment using NREL's Solar Advisor Model, SunPower achieved the 2010 target range, as well as progress toward 2015 targets.

14 SOLAR ENERGY↗

Final Report for PV Incubator Subcontract No. NAT-7-77015-05: October 19, 2007 - July 30, 2009

The Solar America Initiative (SAI) is intended to provide numerous technological routes towards a lower levelized cost of solar-generated electricity (LCOE). MicroLink's planned contribution towards the SAI is to provide a method of lowering the cost of GaAs-based solar cells, which are a major contributor to the cost of concentrator photovoltaic (CPV) modules. MicroLink's unique approach is touse an epitaxial liftoff (ELO) process to completely remove the active solar cell from the substrate while preserving the performance and yield of the cell. The substrate accounts for approximately half the cost of conventional, multijunction GaAs-based solar cells. By using ELO, the substrate can be reused several times for additional solar cell growths, thereby reducing the cost ofmultijunction solar cells by up to 50%. The achievement of high efficiency has significantly increased the acceptance of MicroLink Devices as a future supplier of high-efficiency dual-junction and IMM (inverted metamorphic) triple-junction ELO solar cells. MicroLink entered the SAI program with a 10% efficiency GaAs solar cell (1-sun AM 1.5) and finished the program with an NREL-verified IMMtriple-junction ELO solar cell (1-sun AM 1.5).

14 SOLAR ENERGY↗

Measure Guideline: High Efficiency Natural Gas Furnaces

This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation ofinformation provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

03 NATURAL GAS↗

PEM Electrolyzer Incorporating an Advanced Low-Cost Membrane

Electrolysis of water, particularly in conjunction with renewable energy sources, is potentially a cost-effective and environmentally friendly method of producing hydrogen at dispersed forecourt sites, such as automotive fueling stations. However, state-of-the-art proton-exchange-membrane (PEM) electrolyzer systems have not been economically competitive for forecourt hydrogen production due to their high capital and operating costs, particularly the cost of the electricity used by the electrolyzer stack. The forecourt hydrogen application requires an electrolyzer that produces 1500 kg/day (62.5 kg/hr) hydrogen. At the present time, the markets for PEM electrolyzers are for much smaller units, typically less than 5 kg/hr. Although larger stacks have been developed they have not been commercialized. Thus, PEM electrolyzer systems are generally quite small. The primary feedstock for an electrolyzer is electricity, which could be produced by renewable sources such as wind or solar that do not produce carbon dioxide or other greenhouse gas emissions. In this project, Giner, Inc. (Giner) developed a low-cost, high-efficiency PEM electrolysis stack and system for hydrogen production at moderate pressures of 300 to 400 psig (2170 to 2860 kPa). The electrolyzer stack operates at differential pressure, with hydrogen produced at moderate pressure while oxygen is evolved at near-atmospheric pressure, reducing the cost of the water feed and oxygen handling subsystems. The project included research on catalysts and membranes to improve the efficiency of the electrolysis reaction, as well as development of advanced materials and component fabrication methods to reduce the capital cost of the electrolyzer stack and system. The project culminated in the delivery of a prototype electrolyzer module to the National Renewable Energy Laboratory for testing at the National Wind Technology Center. Electrolyzer stack efficiency of 74% LHV (87%HHV), meeting DOE 2012 targets, was demonstrated using an advanced high-strength membrane. Giner significantly reduced the capital cost of a PEM electrolyzer stack through development of low-cost components and fabrication methods, including a 60% reduction in stack cost. The estimated cost of the present stack design in large-scale production is less than $\$$350/kW. In addition, Giner demonstrated improved lifetimes of the advanced membrane and cell components that can exceed 60,000 hours of operation. An Economic analysis indicates that hydrogen, prior to delivery costs, could be produced for $\$$3.64 per gge (gasoline-gallon equivalent) at an electricity cost of $\$$0.04/kWh utilizing the lower-cost PEM electrolyzer developed in this project assuming high-volume production of large-scale systems.

08 HYDROGEN↗

Optimizing Hydronic System Performance in Residential Applications

Even though new homes constructed with hydronic heat comprise only 3% of the market (US Census Bureau 2009), of the 115 million existing homes in the United States, almost 14 million of those homes (11%) are heated with steam or hot water systems according to 2009 US Census data. Therefore, improvements in hydronic system performance could result in significant energy savings in the US. When operating properly, the combination of a gas-fired condensing boiler with baseboard convectors and an indirect water heater is a viable option for high-efficiency residential space heating in cold climates. Based on previous research efforts, however, it is apparent that these types of systems are typically not designed and installed to achieve maximum efficiency. Furthermore, guidance on proper design and commissioning for heating contractors and energy consultants is hard to find and is not comprehensive. Through modeling and monitoring, CARB sought to determine the optimal combination(s) of components - pumps, high efficiency heat sources, plumbing configurations and controls - that result in the highest overall efficiency for a hydronic system when baseboard convectors are used as the heat emitter. The impact of variable-speed pumps on energy use and system performance was also investigated along with the effects of various control strategies and the introduction of thermal mass.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Training Program for Commercial Building Technicians

This project focused on developing and deploying a comprehensive program of 22 training modules, including certification requirements, and accreditation standards for commercial building technicians, to help achieve the full savings potential of energy efficient buildings, equipment, and systems. This curriculum extended the currently available commercial building technician programs -- training a labor force in a growing market area focused on energy efficiency. The program helps to remove a major market impediment to low energy/zero energy commercial building system acceptance, namely a lack of operating personnel capable of handling more complex high efficiency systems. The project developed a training curriculum for commercial building technicians, with particular focus on high-efficiency building technology, and systems. In Phase 1, the project team worked collaboratively in developing a draft training syllabus to address project objectives. The team identified energy efficiency knowledge gaps in existing programs and plans and plans to address the gaps with either modified or new curricula. In Phase 2, appropriate training materials were developed to meet project objectives. This material was developed for alternative modes of delivery, including classroom lecture materials, e-learning elements, video segments, exercises, and hands-on training elements. A Certification and Accreditation Plan and a Commercialization and Sustainability Plan were also investigated and developed. The Project Management Plan was updated quarterly and provided direction on the management approaches used to accomplish the expected project objectives. GTI project management practices tightly coordinate project activities using management controls to deliver optimal customer value. The project management practices include clear scope definition, schedule/budget tracking, risk/issue resolution and team coordination.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: High Efficiency Natural Gas Furnaces

This measure guideline covers installation of high-efficiency gas furnaces, including: when to install a high-efficiency gas furnace as a retrofit measure; how to identify and address risks; and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

03 NATURAL GAS↗

High-Efficiency, Commercial Ready CdTe Solar Cells

Colorado State’s F-PACE project explored several ways to increase the efficiency of CdTe solar cells and to better understand the device physics of those cells under study. Increases in voltage, current, and fill factor resulted in efficiencies above 17%. The three project tasks and additional studies are described in detail in the final report. Most cells studied were fabricated at Colorado State using an industry-compatible single-vacuum closed-space-sublimation (CSS) chamber for deposition of the key semiconductor layers. Additionally, some cells were supplied by First Solar for comparison purposes, and a small number of modules were supplied by Abound Solar.

14 SOLAR ENERGY↗

Center for Efficiency in Sustainable Energy Systems

The main goal of the Center for Efficiency in Sustainable Energy Systems is to produce a methodology that evaluates a variety of energy systems. Task I. Improved Energy Efficiency for Industrial Processes: This task, completed in partnership with area manufacturers, analyzes the operation of complex manufacturing facilities to provide flexibilities that allow them to improve active-mode power efficiency, lower standby-mode power consumption, and use low cost energy resources to control energy costs in meeting their economic incentives; (2) Identify devices for the efficient transformation of instantaneous or continuous power to different devices and sections of industrial plants; and (3) use these manufacturing sites to demonstrate and validate general principles of power management. Task II. Analysis of a solid oxide fuel cell operating on landfill gas: This task consists of: (1) analysis of a typical landfill gas; (2) establishment of a comprehensive design of the fuel cell system (including the SOFC stack and BOP), including durability analysis; (3) development of suitable reforming methods and catalysts that are tailored to the specific SOFC system concept; and (4) SOFC stack fabrication with testing to demonstrate the salient operational characteristics of the stack, including an analysis of the overall energy conversion efficiency of the system. Task III. Demonstration of an urban wind turbine system: This task consists of (1) design and construction of two side-by-side wind turbine systems on the YSU campus, integrated through power control systems with grid power; (2) preliminary testing of aerodynamic control effectors (provided by a small business partner) to demonstrate improved power control, and evaluation of the system performance, including economic estimates of viability in an urban environment; and (3) computational analysis of the wind turbine system as an enabling activity for development of smart rotor blades that contain integrated sensor/actuator/controller modules to enhance energy capture and reduce aerodynamic loading and noise by way of virtual aerodynamic shaping. Accomplishments: Task I. Improved Energy Efficiency for Industrial Processes: We organized an energy management training session held on February 22, 2011, which was advertised through a regional manufacturing association to provide wide-ranging notification. Over two dozen companies were represented a the seminar, ranging from heavy manufacturing businesses with $5,000,000 per year energy expenses, to small, light manufacturing facilities. Task 2. Landfill Fuel Cell Power Generation Solid Oxide Fuel Cells (SOFCs) were constructed and evaluated as a means of obtaining electrical energy from landfill gas. Analysis of landfill gas. Attempts at collecting gas samples at the landfill and evaluating them on campus were still unsuccessful. Even a Teflon® sample bag would lose its H2S content. Evaluation of Gas Clean-up We consider this a confirmation of the CO2 effect on the solubility of H2S in water making much less sulfide available for the photocatalyst. It also means that another method should be employed to clean up landfill gas. Nonetheless, composition of impurities in landfill gas was reduced sufficiently to allow successful operation of the test fuel cell. Comparison to a PEM fuel cell system. If a PEMFC were to be operated with landfill gas as the fuel, the gas would have to be treated for sulfur removal, and then processed in a reformer large enough to drive the equilibrium far toward the products, so that negligible CO would flow into the fuel cell. Analysis of a fuel cell running on landfill gas. Using a Gow-Mac gas chromatograph with a thermal conductivity detector, unambiguous determination of CO can be made, at least as a primary constituent Task 3: Task 3 Plasma Controlled Turbine Blades Wind Turbine Selection. After carefully reviewing the various model available in the market the team selected the ARE 110 (2.5kW). The ARE 110 provides a very long life with little maintenance due to their relatively low rotational speeds (low RPM). The turbines large swept area (10.2ms2/110sq.ft), high-efficiency blades, purpose built alternator, and optimized power electronics ensure maximum energy capture from a wide range of wind speeds. Two wind turbines were installed side-by-side at the Melnick Hall site to compare their performance. Evaluate and Optimize Aerodynamically Enhanced Turbine Blades Due to delays in the installation of the wind turbines, no actual data was obtained within the contract period. At this time, the turbines are installed and operational at YSU with standard blades. We are in contact with Orbital Research and in discussion as to how best the required data can be obtained.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Combined Space and Water Heating: Next Steps to Improved Performance

A combined space- and water-heating (combi) system uses a high-efficiency direct-vent burner that eliminates safety issues associated with natural draft appliances. Past research with these systems shows that using condensing water heaters or boilers with hydronic air handling units can provide both space and water heating with efficiencies of 90% or higher. Improved controls have the potential to reduce complexity and improve upon the measured performance. This project demonstrates that controls can significantly benefit these first-generation systems. Laboratory tests and daily load/performance models showed that the set point temperature reset control produced a 2.1%–4.3% (20–40 therms/year) savings for storage and hybrid water heater combi systems operated in moderate-load homes. The full modulation control showed additional savings over set point control (in high-load homes almost doubling the savings: 4%–5% over the no-control case). At the time of installation the reset control can be implemented for $200–$400, which would provide paybacks of 6–25 years for low-load houses and 3–15 years for high-load houses. Full modulation implementation costs would be similar to the outdoor reset and would provide paybacks of 5-½–20 years for low-load houses and 2-½–10 years for high-load houses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Low-Cost III-V Photovoltaic Materials by Chloride Vapor Transport Deposition Using Safe Solid Precursors

Si-based photovoltaic devices dominate the market. As photovoltaic (PV) manufacturing costs have plummeted, technologies which increase efficiency have become critical. Si cell efficiencies are nearing theoretical limits and Si-based PV modules are unlikely to reach the 25-30% efficiency range. The use of III-V semiconductors is an obvious technical solution to improve efficiency, especially if they can be integrated directly with existing Si technology as tandems. High coefficients of light absorption along with tunable bandgaps and lattice constants have resulted in record conversion efficiencies for both one-sun and concentrator PV applications. GaAs, for example, has been used to manufacture single-junction photovoltaics with world-record efficiencies of 28.8% at one sun.2 However, costs for III-Vs must be dramatically reduced to produce cost-effective, high-efficiency PV solutions. III-V costs are controlled by two factors: semiconductor growth and the substrate. III-V growth is dominated today by metal-organic vapor phase epitaxy (MOVPE) with a lesser role played by molecular beam epitaxy (MBE). MOVPE costs are high due to the expense and low utilization (~30%) of precursors, modest growth rates (~100 nm min -1 ), equipment complexity, and safety infrastructure needed to handle toxic, pyrophoric gases.3 MBE costs are high due to slow growth rates and limitations of scalability. Details comparing plausible low-cost III-V growth methods are available in a review article published as a result of this project. The primary goal of this project was to demonstrate that close-spaced vapor transport (CSVT) using chloride (from HCl) as a transport agent can be used for the rapid growth of device-ready III-V layers from safe, solid-source precursors. In pursuit of this goal, we designed, built, and installed a new Cl-CSVT reactor based on insights from our previous H 2 O-CSVT growth system and in collaboration with equipment professionals at Malachite Technologies. This system was successfully used to grow epitaxial GaAs with controlled n-type doping, having mobilities similar to MOVPE. Detailed technical information and results can also be found in the primary publication resulting from this project. This work sets the stage for tackling the development of high-performance III-V single junctions and tandem devices directly on Si substrates, which was beyond the capabilities of our H2O-CSVT system. The design of the reactor’s source and substrate transfer system should allow for direct deposition of device structures. The collective innovations of our Cl-CSVT system might ultimately serve as an enabling process for commercialization of the technology through a collaboration with appropriate industrial partners.

14 SOLAR ENERGY↗

GaAsP/Si Tandem Solar Cells: Pathway to Low-Cost, High-Efficiency Photovoltaics

Si is the dominant PV technology, now and for the foreseeable future, due to its extensive manufacturing infrastructure, supply chain, feedstock availability, and highly optimized degree of fabrication processes, which altogether has produced an economic scenario where PV electricity generation is often cheaper than conventional fossil based generation. In many places, the overarching goal of grid parity has been achieved, but further improvement in performance-cost metrics are still needed to sustain the continued LCOE reductions needed to not only compete with conventional generation, but displace it on a global scale; a matter of critical importance if we stand any hope of slowing climate change. Nevertheless, single-junction Si PV is already nearing its physical limit, both in performance and cost, and is thus cannot meet these long-term goals alone. To this end, we are working on the development of monolithic III-V/Si tandem solar cells, which improve upon the performance of pure Si by providing enhanced utilization (reduced thermalization) of high-energy photons. This architecture nominally combines the substantial existing knowledge base, manufacturing infrastructure, and low cost of Si PV with the high efficiencies afforded by the well-established multijunction approach — the only proven way to break the single-junction limit. Although the metal-halide perovskite/Si tandem architecture has garnered substantial attention in recent years, serious questions regarding reliability and service lifetime remain, whereas III-V PV has a proven track record, including in the harsh concentrator and space environments. Additionally, there are multiple fabrication approaches to producing III-V/Si tandem cells, but we are focused on monolithic epitaxial integration as it is the most likely to yield the lowest ultimate LCOE in a fully mature, scaled technology. In this work we have produced multiple generations of GaAsP/Si tandem solar cells, demonstrating a more than 10% absolute AM1.5G efficiency improvement within the time frame of the project, including two verified world records. We have done this using industry-standard fabrication methods, showing that this platform can ultimately be manufactured at scale using existing or only slightly upgraded Si and III-V tooling. Our scientific and engineering advances across a range of fundamental and applied areas – III-V/Si heteroepitaxial integration, defect control in metamorphic III-V epitaxy, fundamental materials-oriented solar cell design and modeling methodology, and more – have created clear pathways for continued advances toward the goal of >30% AM1.5G cell efficiency (and >25% module) and will serve to inform the broader research community for well beyond this immediate application. Techno-economic modeling indicates that our approach can indeed meet SunShot/SETO LCOE targets, but as with any “post-Si” technology there are difficult, but not insurmountable barriers, requiring continued focused research and development efforts.

14 SOLAR ENERGY↗

Cost-Optimized Cold Climate Heat Pump Development and Field Test

Cold climate heat pumps (CCHPs) expand the heat pump market to climates where heating demand is dominant. They can achieve more than 70% energy savings compared with electric resistance heating and operate at lower cost than using tank-stored propane to fuel a furnace. A high-efficiency heat pump with a heating seasonal performance factor (HSPF)—as defined by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI 2008)—greater than 10.0 would be more efficient than gas heating in terms of source energy. However, developing a cost-effective CCHP involves some challenges. A typical single-speed, air-source heat pump (ASHP) with an HSPF of 7.7 Btu/Wh does not work well under cold outdoor temperature conditions typical of cold climate locations for four major reasons: 1. Discharge temperature is too high—The low suction pressure and high compression pressure ratio at low ambient temperatures causes high compressor discharge temperatures in excess of the maximum limit for many of the compressors on the market. Furthermore, system charge of a heat pump is usually optimized in the cooling mode, which leads to overcharge conditions in the heating mode, further increasing the discharge temperature. 2. Heating capacity is insufficient if sized to meet the building design cooling load— Heating capacity of a single-speed heat pump decreases with ambient temperature. The heating capacity at -13°F (-25°C) typically decreases to 20%–40% of the rated heating capacity at 47°F (8.3°C) (~equivalent to the rated cooling capacity at 95°F [35°C]). Therefore, a single-speed heat pump, typically sized to match the building design cooling load, cannot provide adequate heating capacity to match the building heating load at low ambient temperatures. The capacity deficit is filled by inefficient resistance heat, thus lowering the system efficiency and significantly increasing power demand. 3. Cyclic loss is significant if sized to meet the building design heating load—If a single-speed heat pump is sized to meet the heating load, it will be significantly oversized relative to the cooling load in many cold climates. This will cause excessive on/off cyclic loss during the cooling and heating operations at moderately low ambient temperatures. Thus, capacity modulation capability (e.g., using a variable-speed or multi-stage compressor) is necessary for a CCHP, which uses its full capacity to meet the peak heating load and partial capacity to meet the cooling and part-load heating loads. 4. Coefficient of performance (COP) is low—Heating COP degrades significantly at low ambient temperatures owing to the large temperature difference between the heat source and sink. A target CCHP should be sized to meet the building design heating load while minimizing the cyclic loss for the cooling and heating operations at moderate ambient temperatures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Thin Film Core Technology: CIGS Final Technical Report (FTR)

Cu(In,Ga)Se 2 (CIGS) thin-film photovoltaics are a high-efficiency and reliable technology. This project completed research in two important areas and was designed to work collaboratively with industrial partners. Task 1: Alkali Science focused on alkali post-deposition treatments (PDT). PDTs have been instrumental in the dramatic voltage improvements that have moved CIGS device efficiencies from 20% to 23.35% [1]. Based on a survey of CIGS companies at the beginning of the project, the single biggest breakthrough for the CIGS community would be a mechanistic understanding of the role of alkalis in the material system. Significant accomplishments of Task 1: Alkali Science: 1) KF post-deposition treatments were shown to improve lifetime, open-circuit voltage (VOC), and efficiency of industrial partner samples, even when done as a later step, separate from the original CIGS deposition. 2) KF boosted efficiency when incorporated at the end of the third stage of NREL CIGS growth. 3) XPS characterization of CIGS surfaces with and without PDTs led to a proposed mechanism whereby K drives structural transformation at 350 degrees C that is locked in at room temperature even after K is rinsed away. 4) Published recipes for KF and RbF PDTs. Literature to date did not provide enough detail to quickly reproduce experimental results. 5) Identified most important parameters (RbF cell temperature and lamp setpoint temperature) and set boundaries for successful RbF PDTs. The purpose of Task 2: Cell-level Reliability was to overcome the largest challenges to investor confidence and long product lifetime in CIGS-based photovoltaic products: metastability, shading-induced hot spots, and potential-induced degradation (PID). Key findings were made in each of these areas by studying CIGS reliability at the cell level: 1) Published NREL's cell-level reliability testing procedures along with challenges that were encountered while developing them. These were also distributed to the community through an MRS conference presentation. 2) Decreased metastability by adding a CdS hole-injection layer between the CIGS and Zn(O,S) in the device stack. It also improved device performance. Materials other than CdS can be used for the same purpose. 3) Reduced front-glass PID by replacing soda-lime glass with low-Na borosilicate glass. 4) Found that PID depends on leakage current and light/electrical bias. This will help labs avoid test-specific degradation. 5) Discovered that CIGS can suffer from two different types of PID with different mechanisms. Front is slower and leads to shunting ZnO. Back is faster and degrades the p-n junction. 6) Holding cells at open circuit slows PID compared to short circuit. This affects testing protocols for glass/glass modules.

14 SOLAR ENERGY↗

Development of High-efficiency and Cost-effective Forged Ingot Niobium Technology for Science Frontiers and Accelerator Applications

Development of Forged Ingot Niobium Technology: Worlds science frontier programs and SRF accelerator applications demand high performance and cost-effective SRF accelerator technology [1-8]. Fine-grain (FG) and Large-grain (LG) ingot niobium technologies have been very well developed and implemented in all the present-day accelerator projects. However, forged ingot niobium technology which is the focus of this development proposal will be much more cost-effective and expected to have several technical advantages. FG niobium sheet production is very complex involving more than ten processing steps making them prone to contamination. As a result, they are very expensive to produce and require stringent QA procedure to be ready for SRF cavity production. The accelerating cavity process steps are also numerous and require strict procedures in order to achieve high accelerating gradients and quality factors needed for science frontier programs. LG niobium disc production, directly sliced from the ingot, is relatively simple and straight forward to keep surface cleanness. The disc production cost is significantly low compared to FG niobium sheet production. However, there are (some) draw backs due to non-homogeneity of the grain boundary distribution, resulting in non-uniform mechanical properties and complex cavity fabrication, although the LG cavities achieve the expected high-gradient performance goals with lower cost. Medium-grain (MG) niobium disk production may be realized with a new approach/process, the disc directly sliced from the forged ingot, involves a simpler process steps contributing major production cost reduction [9]. These discs are expected to be superior as they tend to be homogenous with uniform sub millimeter grains and mechanical properties. We are eagerly looking forward to developing the forged ingot niobium SRF accelerator technology for the benefit of the world-wide science frontier programs, green energy subcritical nuclear energy systems and a wide variety of industrial applications including the production of radio isotopes and nuclear transmutation applications. Measurement of thermal characteristics of the forged ingot niobium: Measurement of the thermal diffusivity, D, of superconducting MG niobium is important to be understood in comparison with FG sheet and LG disc, as well as that of advanced composite material of Nb3Sn film sputtered on forged ingot Nb, which will be determined using transient pump-probe thermo-modulation [10,11]. Transient thermo-modulation is based on using an ultrafast laser pulse to heat the superconducting materials by a few K, then a synchronized laser pulse probes the reflectance of the heated material. For thin films on a substrate (e.g, 100-nm Nb3Sn on Nb), it takes <100 ps for the heat to reach the substrate by diffusion. Therefore, an ultrafast method is needed to probe D of the studied material. D will be measured from room temperature to liquid helium temperatures. Fundamental Research: The increase of rf loss in SRF cavities is related to trapping of residual magnetic field during the cavity cool-down. The study suggested that the micro structure plays the role in flux trapping sensitivity. The research includes the flux trapping and expulsion study as forged ingot niobium goes through several mechanical deformations, crystallization leading to the optimal SRF cavity performance. Furthermore, the cavity made from FG, MG, and LG sheet/disc will be compared to understand the optimal re-crystallization temperature that cavity needed to be heat treated which minimize the flux trapping and increase SRF cavity performance. References: 1. S. Belomestnykh, Overview of recent SRF developments for ERLs, presented at the SRF 2015, Whistler, BC, Canada (2015). 2. A. Yamamoto, M. Yamanaka and G. Myneni, Ingot Nb based SRF Technology for the International Linear Collider, in Science and Technology of Ingot Niobium for Superconducting Radio Frequency Applications, AIP Conf. Proc. 1687, 030005-1 ? 03005-6, 2015 3. Report of the Workshop on Energy and Environmental Applications of Accelerators, DOE Workshop Report. https://science.osti.gov/-/media/hep/pdf/Reports/2020/CASM_WorkshopReport.pdf? la=en&hash=AEB0B318ED0436B1C5FF4EE0FDD6DEB84C2F15B2 4. G. Ciovati, et al., Design of a cw, low-energy, high-power superconducting linac for environmental applications, Phys. Rev. Accel. Beams 21, 091601 (2018). 5. P. Dhakal, et al., Effect of high temperature heat treatments on the quality factor of a large-grain superconducting radio-frequency niobium cavity, Phys. Rev. ST Accel. Beams 16, 042001 (2013). 6. P. Kneisel et al., Review of ingot niobium as a material for superconducting radio frequency accelerating cavities, Nuclear Instruments and Methods in Physics Research A 774, 133 (2015). 7. G. Ciovati, P. Dhakal, and G. R, Myneni, Superconducting radio-frequency cavities made from medium and low-purity niobium ingots, Supercond. Sci. Technol. 29, 064002 (2016). 8. M. Drury et al., commissioning of the prototype C75 cavities in a CEBAF cryomodule, in Proc. of IPAC 2018, Vancouver, BC, Canada (2018) 9. Feasibility of forged-ingot niobium disc and SRF cavity fabrication technology recently demonstrated in cooperation of ATI, BSCE, and KEK (2020). 10. Hani E. Elsayed-Ali, ?Measurements of heat transport in thin films by ultrafast laser-based techniques,? 3rd International Conference on Thermal Issues in Emerging Technologies Theory and Applications, Cairo, Egypt, pp. 347 ? 350 (2010). DOI: 10.1109/ThETA17616.2010 11. W. M. G. Ibrahim, H. E. Elsayed-Ali, M. Schinn, and C. A. Bonner, Jr., ?Ultrafast investigation of electron dynamics in multilayer metals,? Int. J. Heat and Mass Transfer, 47(10?11), 2261?2268 (2004).

Myneni, G.↗

Next Generation Durable, Cost Effective, Energy Efficient Tubular SOFC (Final Scientific/Technical Report)

The overall objective of this project is to develop and optimize a YSZ electrolyte-based solid oxide fuel cell (SOFC) technology for low cost, low temperature (~ 650°C), and high energy efficiency operation. The developed technology will be implemented and demonstrated in a high efficiency 2~3kW SOFC with applicability to sub-MW systems. A summary of significant accomplishments is provided below. Key accomplishments: 1. Improved fundamental cell technology demonstrated at single tube and system scale. Improved power output by 54% while operating at the normal temperature of 750°C. And improved power output by 33% while operating at 650°C, 100°C lower than normal temperature. 2. SPS patented internal recycle arrangement was developed and extended to operate on LPG fuel directly in a compact, high-efficiency (> 40%) system. 3. System testing was conducted to prove the long-term durability of cell improvements. Demonstrated over 8000 hours of operation at 0.21 %/1000 hrs degradation. 4. A large-scale, 2.5kW net power system demonstration was completed, which demonstrated 40% net efficiency over 1000 hours. 5. System design and cost analysis of a 1MW system utilizing a 2.5kW bundle was completed. Cost optimization of the bundle showed a reduction of nearly 80% is possible from $\$$5,790/kW to $\$$1250/kW. This lower cost is considered viable for SPS commercialization.

03 NATURAL GAS↗

Next Gen High Efficiency Boosted Engine Development

This work represents an advanced engineering research project partially funded by the U.S. Department of Energy (DOE). Ford Motor Company, FEV North America, and Oak Ridge National Laboratory collaborated to develop a next generation boosted spark ignited engine concept. The project goals, specified by the DOE, were 23% improved fuel economy and 15% reduced weight relative to a 2015 or newer light-duty vehicle. The fuel economy goal was achieved by designing an engine incorporating high geometric compression ratio, high dilution tolerance, low pumping work, and low friction. The increased tendency for knock with high compression ratio was addressed using early intake valve closing (EIVC), cooled exhaust gas recirculation (EGR), an active pre-chamber ignition system, and careful management of the fresh charge temperature. Engine weight reduction measures were implemented throughout the engine system making use of composite materials, advanced manufacturing techniques, and architectural choices. This report outlines the analytical, design, fabrication, and test work conducted for the duration of the project. The combustion system stability, EGR tolerance, and knock resistance were validated on a single cylinder engine. An inline six-cylinder engine was then designed targeting application in the Ford F150. Multi-cylinder engines were produced and tested achieving the target vehicle fuel economy improvement of 23% assessed using measured engine fuel consumption combined with a vehicle drive cycle simulation. Actions were identified and designs were demonstrated to achieve the 15% weight reduction target. This project included items covering a range of technology readiness levels. Some of the technologies explored are production ready, while others were investigated to understand the limitations for what can be achieved in a stoichiometric, gasoline-fueled, spark-ignited internal combustion engine.

42 ENGINEERING↗

Next-Generation, High-temperature, High-frequency, High-efficiency, High-power-density Traction System

To meet performance and reliability requirements necessary for broader adoption of electric drive vehicles, the Electrical and Electronics Technical Team of the U.S. Drive partnership has established aggressive design goals for next-generation electric vehicle drivetrains. Specifically, the 2025 roadmap stipulates a 100 kW/L power density target and a $\$$2.7/kW cost target for power electronics, in addition to high-voltage operation (i.e., greater than 800 VDC). The additional targets for traction motor and the overall system performance impose further challenges on the power electronics design. For example, many high specific power machines have reduced iron content, and therefore reduced intrinsic filtering, thus requiring the inverter to supply a low-distortion drive current. These machines also typically have a high pole count, thus requiring drive current at a higher electrical frequency. Other motors, such as brush-less dc and switch reluctance machines, require a carefully-shaped, non-sinusoidal drive current (Yang, Shang, Brown, & Krishnamurthy, 2015), (Zhang, Bowman, O'Connel, & Haran, 2018), (Anderson, et al., 2018). Two- and three-level inverter topologies are the conventional framework for the power electronics design of the drivetrain, and some demonstrations have shown recent progress towards addressing cost, power density and efficiency goals (Gurpinar & Ozpineci, 2018), (Zhu, Kim, Chen, Erickson, & Maksimović, 2018), (Deshpande, Chen, Narayanasamy, Sathyanarayanan, & Luo, 2018), (Alizadeh, et al., 2019). However, an unconventional approach may be necessary to take the dramatic leap in power density necessitated by the roadmap—while simultaneously addressing the other system needs. Therefore, this project leverages the flying capacitor multilevel (FCML) topology, together with a scalable, modular approach, to address these needs. This type of hybrid converter has several advantages: lower voltage (i.e., less than 300 V) transistors can be used, energy-dense capacitors process most of the power, and the output current waveform is multilevel and exhibits a frequency multiplying effect—in other words, the output has reduced dv/dt and filtering requirements for the same high voltage dc bus. For example, in an electric vehicle with an 800 V bus, a 10-level FCML could leverage 100 V, commercially available GaN devices switching at 115 kHz to produce a ~1 MHz switching waveform (modulated according to the motor drive requirements) with one ninth of the dv/dt of a two-level converter. Prior work has already demonstrated promising performance and gravimetric power density figures for more electric aircraft applications (Pallo, Foulkes, Modeer, Coday, & Pilawa-Podgurski, 2018). This project leverages lessons learned to achieve the volumetric power density of 100 kW/L by employing advanced liquid cooling, address the 300,000 mile reliability challenge with redundant design, topology failure studies and online health monitoring, and reduce costs to $\$$2.7/kW through the use of low-cost GaN devices, modular converter assemblies, and modest modifications to traditional manufacturing methods. The project involved several hardware designs, each achieving increasing performance. At the conclusion of the project, a volumetric power density of 380 kW/L was achieved, in a 800V dc-ac converter, greatly surpassing even the aggressive target goal.

33 ADVANCED PROPULSION SYSTEMS↗