Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “experience report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Apollo experience report: Guidance and control systems: Command and service module entry monitor subsystem

The conceptual aspects of the command and service module entry monitor subsystem, together with an interpretation of the displays and their associated relationship to entry trajectory control, are presented. The entry monitor subsystem is described, and the problems encountered during the developmental phase and the first five manned Apollo flights are discussed in conjunction with the design improvements implemented.

Reina, B., Jr.↗

Apollo experience report: Assessment of metabolic expenditures

A significant effort was made to assess the metabolic expenditure for extravehicular activity on the lunar surface. After evaluation of the real-time data available to the flight controller during extravehicular activity, three independent methods of metabolic assessment were chosen based on the relationship between heart rate and metabolic production, between oxygen consumption and metabolic production, and between the thermodynamics of the liquid-cooled garment and metabolic production. The metabolic assessment procedure is analyzed and discussed. Real-time use of this information by the Apollo flight surgeon is discussed. Results and analyses of the Apollo missions and comments concerning future applications are included.

Waligora, J. M.↗

Apollo experience report: The AN/ARD-17 direction finding system

This report contains a statement of the operational philosophy and requirements leading to the development of the AN/ARD-17 direction-finding system. The technical problems encountered and the solutions devised in the AN/ARD-17 development are discussed. An evaluation of the system under actual operational conditions is included.

Chase, W. R.↗

Apollo experience report: Electrical wiring subsystem

The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

White, L. D.↗

Apollo experience report: Spacecraft relative motion and recontact analyses

Potential collision or accidental recontact problems between the spacecraft and other space vehicles (or components) existed during most of the Apollo missions. These problems were identified before each Apollo flight, and appropriate solutions for eliminating or minimizing the chance of collision were determined through relative motion analyses. A summary of the identification, solution, and analysis process for some of the more significant of these separation problems is presented. In addition, the scope of responsibility, the development of the study effort, and the computer simulation development, which supported the analysis process, are described.

Mcadams, R. E.↗

Apollo experience report: Guidance and control systems; lunar module mission programer

A review of the concept, operational requirements, design, and development of the lunar module mission programer is presented, followed by a review of component and subsystem performance during design-feasibility, design-verification, and qualification tests performed in the laboratory. The system was further proved on the unmanned Apollo 5 mission. Several anomalies were detected, and satisfactory solutions were found. These problems are defined and examined, and the corrective action taken is discussed. Suggestions are given for procedural changes to be used if future guidance and control systems of this type are to be developed.

Vernon, J. A.↗

Apollo experience report: Command and service module sequential events control subsystem

The Apollo command and service module sequential events control subsystem is described, with particular emphasis on the major systems and component problems and solutions. The subsystem requirements, design, and development and the test and flight history of the hardware are discussed. Recommendations to avoid similar problems on future programs are outlined.

Johnson, G. W.↗

Apollo experience report: Guidance and control systems: CSM service propulsion system gimbal actuators

The service propulsion system gimbal actuators of the Apollo command and service module were developed, modified, and qualified between February 1962 and April 1968. The development of these actuators is described as the result of extensive testing, retesting, and modification of the initial design. Successful completion of each mission without anomalies attributable to the actuators indicated that the particular configuration (modification) in use was adequate for the flight profile imposed.

Mcmahon, W. A.↗

Apollo experience report: Flight anomaly resolution

The identification of flight anomalies, the determination of their causes, and the approaches taken for corrective action are described. Interrelationships of the broad range of disciplines involved with the complex systems and the team concept employed to ensure timely and accurate resolution of anomalies are discussed. The documentation techniques and the techniques for management of anomaly resolution are included. Examples of specific anomalies are presented in the original form of their progressive documentation. Flight anomaly resolution functioned as a part of the real-time mission support and postflight testing, and results were included in the postflight documentation.

Lobb, J. D.↗

Apollo experience report: Guidance and control systems. Mission control programmer for unmanned missions AS-202, Apollo 4, and Apollo 6

An unmanned test flight program required to evaluate the command module heat shield and the structural integrity of the command and service module/Saturn launch vehicle is described. The mission control programer was developed to provide the unmanned interface between the guidance and navigation computer and the other spacecraft systems for mission event sequencing and real-time ground control during missions AS-202, Apollo 4, and Apollo 6. The development of this unmanned programer is traced from the initial concept through the flight test phase. Detailed discussions of hardware development problems are given with the resulting solutions. The mission control programer functioned correctly without any flight anomalies for all missions. The Apollo 4 mission control programer was reused for the Apollo 6 flight, thus being one of the first subsystems to be reflown on an Apollo space flight.

Holloway, G. F.↗

Apollo experience report: Engineering and analysis mission support

The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.

Fricke, R. W., Jr.↗

Apollo experience report guidance and control systems: Lunar module abort guidance system

The history of a unique development program that produced an operational fixed guidance system of inertial quality is presented. Each phase of development, beginning with requirement definition and concluding with qualification and testing, is addressed, and developmental problems are emphasized. Software generation and mission operations are described, and specifications for the inertial reference unit are included, as are flight performance results. Significant program observations are noted.

Kurten, P. M.↗

Apollo experience report: Guidance and control systems: Automated control system for unmanned mission AS-201

The Apollo command module heat shield and Apollo command and service module/Saturn launch vehicle structural integrity were evaluated in an unmanned test flight. An automated control system was developed to provide the mission event sequencing, the real-time ground control interface, and the backup attitude reference system for the unmanned flight. The required mission events, the design logic, the redundancy concept, and the ground-support-equipment concept are described and some development problem areas are discussed. The mission event time line and the real-time ground command list are included to provide an outline of the control system capabilities and requirements. The mission was accomplished with the automated control system, which functioned without flight anomalies.

Holloway, G. F.↗

Apollo experience report: Development of the extravehicular mobility unit

The development and performance history of the Apollo extravehicular mobility unit and its major subsystems is described. The three major subsystems, the pressure garment assembly, the portable life-support system, and the oxygen purge system, are defined and described in detail as is the evolutionary process that culminated in each major subsystem component. Descriptions of ground-support equipment and the qualification testing process for component hardware are also presented.

Lutz, C. C.↗

Apollo experience report: Mission evaluation team postflight documentation

The various postflight reports prepared by the mission evaluation team, including the final mission evaluation report, report supplements, anomaly reports, and the 5-day mission report, are described. The procedures for preparing each report from the inputs of the various disciplines are explained, and the general method of reporting postflight results is discussed. Recommendations for postflight documentation in future space programs are included. The official requirements for postflight documentation and a typical example of an anomaly report are provided as appendixes.

Dodson, J. W.↗

Apollo experience report: Detection and minimization of ignition hazards from water/glycol contamination of silver-clad electrical circuitry

The potential flammability hazard when a water/glycol solution contacts defectively insulated silver-clad copper circuitry or electrical components carrying a direct current is described. The chemical reactions and means for detecting them are explained. Methods for detecting and cleaning contaminated areas and the use of inhibitors to arrest chemical reactivity are also explained. Preventive measures to minimize hazards are given. Photomicrographs of the chemical reactions occurring on silver clad wires are also included.

Downs, W. R.↗

Apollo experience report: Crew station integration. Volume 1: Crew station design and development

An overview of the evolution of the design and development of the Apollo command module and lunar module crew stations is given, with emphasis placed on the period from 1964 to 1969. The organizational planning, engineering techniques, and documentation involved are described, and a detailed chronology of the meetings, reviews, and exercises is presented. Crew station anomalies for the Apollo 7 to 11 missions are discussed, and recommendations for the solution of recurring problems of crew station acoustics, instrument glass failure, and caution and warning system performance are presented. Photographs of the various crew station configurations are also provided.

Allen, L. D.↗